Asbestos Practice Exam 4 Questions
With 100% Verified Answers
What are common symptoms of mesothelioma? -
correct answer ✅Persistent stomach pain, persistent shortness of
breath, persistent chest pain
Which of the of the following is a common symptom of lung
cancer? -
correct answer ✅Persistent cough or change in cough pattern
Which of the following is necessary insurance coverage necessary
for asbestos contractors? -
correct answer ✅500,000 per occurrence for bodily injusry and
property damage combined
Start up sequence is as follows -
correct answer ✅- post warning signs
- pre-cleaned and removed removable objects
- precleaned and sealed fixed objects
- interruped and tagged electrical circuits
- precleaned surfaces
- sealed off room penetrations
- erected containment barriers
,Asbestos Practice Exam 4 Questions
With 100% Verified Answers
-energize negative air filtration units
- shut down the HVAC system
When a worker is removing asbestos from a steam tunnel a small
opening, what is requried? -
correct answer ✅-constant communication between workers
- at least two workers inside tunnel with supplied air respirators
- standby workers posted with rescue equipment, including self
contained breathing apparatus
--> Not required- a bell connected toa long cord which can be
activated by workers
What should be done with the asbestos records if an asbestos
contractor goes out of business after 25 years and there is no one
remaining in the business to store the records? -
correct answer ✅He must notify the director of the NIOSH at least
3 months prior to the planned disposing of the records
On or after Jan 1, 1987, contractos must be certified to handle ACM
of how many square feet? -
correct answer ✅100 or more
, Asbestos Practice Exam 4 Questions
With 100% Verified Answers
What is the most common symptom of asbestosis? -
correct answer ✅Shortness of breath or rales
If removing more than ____ lf of asbestos pipe insulation or ____ sf
of asbestos surfacing material the EPA regional office and or the
State must be contacted and given advance notice -
correct answer ✅260, 160
According to GISO 5208, a medical examination must be given how
soon after an employee begins asbestos work? -
correct answer ✅Within 30 days of the beginning of work
When must DOSH be notified if a condemned building is about to
collapse is torn down and 150 sf of ACM is to be removed? -
correct answer ✅With as much advanced notice as possible.
Which of the following is necessary when workers are to work in
high temperature work areas? -
correct answer ✅The should be trained in emergency procedures
for termperature related illnesses and injuries.
With 100% Verified Answers
What are common symptoms of mesothelioma? -
correct answer ✅Persistent stomach pain, persistent shortness of
breath, persistent chest pain
Which of the of the following is a common symptom of lung
cancer? -
correct answer ✅Persistent cough or change in cough pattern
Which of the following is necessary insurance coverage necessary
for asbestos contractors? -
correct answer ✅500,000 per occurrence for bodily injusry and
property damage combined
Start up sequence is as follows -
correct answer ✅- post warning signs
- pre-cleaned and removed removable objects
- precleaned and sealed fixed objects
- interruped and tagged electrical circuits
- precleaned surfaces
- sealed off room penetrations
- erected containment barriers
,Asbestos Practice Exam 4 Questions
With 100% Verified Answers
-energize negative air filtration units
- shut down the HVAC system
When a worker is removing asbestos from a steam tunnel a small
opening, what is requried? -
correct answer ✅-constant communication between workers
- at least two workers inside tunnel with supplied air respirators
- standby workers posted with rescue equipment, including self
contained breathing apparatus
--> Not required- a bell connected toa long cord which can be
activated by workers
What should be done with the asbestos records if an asbestos
contractor goes out of business after 25 years and there is no one
remaining in the business to store the records? -
correct answer ✅He must notify the director of the NIOSH at least
3 months prior to the planned disposing of the records
On or after Jan 1, 1987, contractos must be certified to handle ACM
of how many square feet? -
correct answer ✅100 or more
, Asbestos Practice Exam 4 Questions
With 100% Verified Answers
What is the most common symptom of asbestosis? -
correct answer ✅Shortness of breath or rales
If removing more than ____ lf of asbestos pipe insulation or ____ sf
of asbestos surfacing material the EPA regional office and or the
State must be contacted and given advance notice -
correct answer ✅260, 160
According to GISO 5208, a medical examination must be given how
soon after an employee begins asbestos work? -
correct answer ✅Within 30 days of the beginning of work
When must DOSH be notified if a condemned building is about to
collapse is torn down and 150 sf of ACM is to be removed? -
correct answer ✅With as much advanced notice as possible.
Which of the following is necessary when workers are to work in
high temperature work areas? -
correct answer ✅The should be trained in emergency procedures
for termperature related illnesses and injuries.