Under reg. 8, what is asbestos containing material? -
correct answer ✅greater than 1%
What are the trigger levels for a single family residential dwelling? -
correct answer ✅32 sqft, 50 linear feet, 55 gallon drum volume
What are the trigger levels for a commercial property? -
correct answer ✅160 sqft, 260 linear feet, 55 gallon drum volume
Can Contractor/Supervisors do asbestos abatement in the state of
colorado as long as they have been EPA certified only? -
correct answer ✅No, State certification + GAC needed
Where must state certification photo id cards or state certifications
be available so that division representatives may check the
credentials of employees? -
correct answer ✅On site
How long is a General Abatement Contractor certificate good for? -
correct answer ✅1 year
,Asbestos Regulation 8 Complete
Exam Set Questions and Verified
Answers (solutions)
What is the maximum fine amount that can be levied for violations
under reg. 8? -
correct answer ✅$25,000 per day in effect
Is a state of Colorado certification required for a project manager? -
correct answer ✅no, must meet qualifications
How many years of training is required to be a project manager? -
correct answer ✅1 year of oversight
When must asbestos containing bulk sample be point counted in
the state of CO? -
correct answer ✅friable, less than 1% asbestos but greater than
0% (to ensure sample is trace material and unregulated)
Under reg 8, do building inspectors identifying ACM have to be
independent of the GAC that will subsequently abate the ACM
identified? -
correct answer ✅yes
, Asbestos Regulation 8 Complete
Exam Set Questions and Verified
Answers (solutions)
What are the trigger levels for a school? -
correct answer ✅3 sqft, 3 linear feet
How long does a contractor have to challenge a cease and desist
order? -
correct answer ✅30 days from issuance
Project managers are required on asbestos abatement projects in
which friable ACM to be abated exceeds ___________? -
correct answer ✅1000 linear feet, 3000 sqft
A waiver may be requested for the requirement of a project
manager if the GAC who is doing the job has had a history of fewer
than ____ division issued violations with a finding of guilty within
the past ___ years/ -
correct answer ✅2,2
Whos responsibility is it to notify the building owner of a project
manager requirements? -
correct answer ✅GAC
Exam Set Questions and Verified
Answers (solutions)
Under reg. 8, what is asbestos containing material? -
correct answer ✅greater than 1%
What are the trigger levels for a single family residential dwelling? -
correct answer ✅32 sqft, 50 linear feet, 55 gallon drum volume
What are the trigger levels for a commercial property? -
correct answer ✅160 sqft, 260 linear feet, 55 gallon drum volume
Can Contractor/Supervisors do asbestos abatement in the state of
colorado as long as they have been EPA certified only? -
correct answer ✅No, State certification + GAC needed
Where must state certification photo id cards or state certifications
be available so that division representatives may check the
credentials of employees? -
correct answer ✅On site
How long is a General Abatement Contractor certificate good for? -
correct answer ✅1 year
,Asbestos Regulation 8 Complete
Exam Set Questions and Verified
Answers (solutions)
What is the maximum fine amount that can be levied for violations
under reg. 8? -
correct answer ✅$25,000 per day in effect
Is a state of Colorado certification required for a project manager? -
correct answer ✅no, must meet qualifications
How many years of training is required to be a project manager? -
correct answer ✅1 year of oversight
When must asbestos containing bulk sample be point counted in
the state of CO? -
correct answer ✅friable, less than 1% asbestos but greater than
0% (to ensure sample is trace material and unregulated)
Under reg 8, do building inspectors identifying ACM have to be
independent of the GAC that will subsequently abate the ACM
identified? -
correct answer ✅yes
, Asbestos Regulation 8 Complete
Exam Set Questions and Verified
Answers (solutions)
What are the trigger levels for a school? -
correct answer ✅3 sqft, 3 linear feet
How long does a contractor have to challenge a cease and desist
order? -
correct answer ✅30 days from issuance
Project managers are required on asbestos abatement projects in
which friable ACM to be abated exceeds ___________? -
correct answer ✅1000 linear feet, 3000 sqft
A waiver may be requested for the requirement of a project
manager if the GAC who is doing the job has had a history of fewer
than ____ division issued violations with a finding of guilty within
the past ___ years/ -
correct answer ✅2,2
Whos responsibility is it to notify the building owner of a project
manager requirements? -
correct answer ✅GAC