What is a bridging document?
Give this one a try later!
Owner provided documents- preliminary document in RFP.
Is there a contractual difference between design build bid and Construction
Management at Risk?
Give this one a try later!
No there are still two contract with the owner. One with the designer and
one with the contractor.
,What are the characteristics leading to design build?
Give this one a try later!
completion time critical, performance based requirements, collaboration
important, flexibility of approach
What is EPC?
Give this one a try later!
Engineer-Procure-Construct/ a delivery system that is for all practical
purposes design-build/term used by industrial&power sector/system and
performance testing are central to scope/EPC contractor will typically
perform engineering with its in-house staff
Designer of record
Give this one a try later!
Manages design performance interface
Complaint?
Give this one a try later!
, DBIA code of conduct first step in enforcement and disciplinary actions
What is IPD?
Give this one a try later!
Integrated Project Delivery- multi-party agreement, qualification based
selection and target pricing approach, private sector use, and the key is
that the owner's ability to accept risk.
bridging documents
Give this one a try later!
example would be Owner supplying preliminary design documents- they
may be subject to errors/omissions putting owner at risk to be dealing with
Spearin Doctrine
What is sole source procurement?
Give this one a try later!
limited use, typically applicable in emergency situations, essentially non-
competitive
Performance Specification
, Give this one a try later!
Owner only provides the requirements for the end result of an element that
will be designed by others.
What are the benefits of design build?
Give this one a try later!
facilitates fast track, owner can monitor design/price development,
enhanced quality, reduced owner liability, and collaborative versus
adversarial relationships
Consideration
Give this one a try later!
Value exchanged for performance
Four primary phases of oversight
Give this one a try later!
Preconstruction, contract oversight, close-out, and performance
evaluation
Give this one a try later!
Owner provided documents- preliminary document in RFP.
Is there a contractual difference between design build bid and Construction
Management at Risk?
Give this one a try later!
No there are still two contract with the owner. One with the designer and
one with the contractor.
,What are the characteristics leading to design build?
Give this one a try later!
completion time critical, performance based requirements, collaboration
important, flexibility of approach
What is EPC?
Give this one a try later!
Engineer-Procure-Construct/ a delivery system that is for all practical
purposes design-build/term used by industrial&power sector/system and
performance testing are central to scope/EPC contractor will typically
perform engineering with its in-house staff
Designer of record
Give this one a try later!
Manages design performance interface
Complaint?
Give this one a try later!
, DBIA code of conduct first step in enforcement and disciplinary actions
What is IPD?
Give this one a try later!
Integrated Project Delivery- multi-party agreement, qualification based
selection and target pricing approach, private sector use, and the key is
that the owner's ability to accept risk.
bridging documents
Give this one a try later!
example would be Owner supplying preliminary design documents- they
may be subject to errors/omissions putting owner at risk to be dealing with
Spearin Doctrine
What is sole source procurement?
Give this one a try later!
limited use, typically applicable in emergency situations, essentially non-
competitive
Performance Specification
, Give this one a try later!
Owner only provides the requirements for the end result of an element that
will be designed by others.
What are the benefits of design build?
Give this one a try later!
facilitates fast track, owner can monitor design/price development,
enhanced quality, reduced owner liability, and collaborative versus
adversarial relationships
Consideration
Give this one a try later!
Value exchanged for performance
Four primary phases of oversight
Give this one a try later!
Preconstruction, contract oversight, close-out, and performance
evaluation