FDOT Final Estimates - Level 1 Exam Questions
with Correct Answers | Guaranteed Success
Save
Practice questions for this set
Learn 1 /7 Study with Learn
1,857 CY
Choose an answer
What two types of Estimates are needed to pay for the work performed by
1
contractors?
What should accompany final measurements so that nonstandard measurements may
2
be interpreted accurately?
Which Document contains a series of Specially designed forms that show both original
3
estimates of quantities and the final quantities as measured ad accepted?
, Using the data given below, find the volume to the nearest cubic yard. The areas were
determined for the cross sections at these stations:
Station: Area (Sq Feet):
4 5091+00 287.60
5091+38 302.0
5091+91 298.10
5092+47 295.50
5092+69 288.30
Don't know?
Terms in this set (50)
What two types of Final & Progress Monthly
Estimates are needed to
pay for the work
performed by
contractors?
In case of discrepancies Special Provisions
among the contract
documents, which
document takes the
highest precedence?
Contractors Recieve Monthly Progress Estimates
progress payments on the
basis of?
Which of the following Preparation and Documentation Manual (PDM)
sets forth the
Department's methods
and procedures for
preparing and checking
final estimates?
with Correct Answers | Guaranteed Success
Save
Practice questions for this set
Learn 1 /7 Study with Learn
1,857 CY
Choose an answer
What two types of Estimates are needed to pay for the work performed by
1
contractors?
What should accompany final measurements so that nonstandard measurements may
2
be interpreted accurately?
Which Document contains a series of Specially designed forms that show both original
3
estimates of quantities and the final quantities as measured ad accepted?
, Using the data given below, find the volume to the nearest cubic yard. The areas were
determined for the cross sections at these stations:
Station: Area (Sq Feet):
4 5091+00 287.60
5091+38 302.0
5091+91 298.10
5092+47 295.50
5092+69 288.30
Don't know?
Terms in this set (50)
What two types of Final & Progress Monthly
Estimates are needed to
pay for the work
performed by
contractors?
In case of discrepancies Special Provisions
among the contract
documents, which
document takes the
highest precedence?
Contractors Recieve Monthly Progress Estimates
progress payments on the
basis of?
Which of the following Preparation and Documentation Manual (PDM)
sets forth the
Department's methods
and procedures for
preparing and checking
final estimates?