100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

Bailey Bridge Exam Questions And Answers Verified 100% Correct

Puntuación
-
Vendido
-
Páginas
3
Grado
A+
Subido en
12-12-2025
Escrito en
2025/2026

Bailey Bridge Exam Questions And Answers Verified 100% Correct Where are all of the measurements taken from for the rollers during site layout? - ANSWER -The center of the roller to the center of the next roller How many total personnel are needed to construct a TD Bailey bridge? (Manpower only) - ANSWER -98 (6 NCO, 92 enlisted) How many transoms per bay are required to support vehicles over class 70? - ANSWER -4 What is the assembly time for an 80-foot SS bridge during daylight with trained personnel? - ANSWER -2 hrs What is the longitudinal spacing between plain rollers? - ANSWER -25ft What is the maximum lift obtainable using launching-nose links? - ANSWER -94 1/2 inches At the outset of World War II, the US Army sought a versatile bridge that could span a variety of gaps and be quickly assembled by __________________. - ANSWER -manpower alone How long is a steel truss section? - ANSWER -10ft Where would you insert the transoms as the panels of the third bay are being placed? - ANSWER -in the second bay What is the short panel pin used for? - ANSWER -pin the end posts of the outer middle trusses in a triple truss bridge What is the vertical lift when the launching-nose link is positioned at 10 feet and 40 feet? - ANSWER -67 (1/2) inches True or False: When jacking down the Single-Single bridge, the jacks must be operated on only one end of the bridge at a time. - ANSWER -true What is the assembly time for a 120-foot DD during mission-oriented protection posture (MOPP) conditions? - ANSWER -... How is the class of the bridge determined? - ANSWER -By the type of vehicles it must carry How many rocking rollers are needed for a 150-foot TS bridge on the near and far banks? - ANSWER -4 near, 2 far What is the safety setback on an unprepared abutment with a bank height 7 feet? - ANSWER -7 (1.5) = 10.5ft What component(s) is / are added to get the greatest strength in a Bailey bridge? - ANSWER -third story Which two points are used to measure the gap between two unprepared abutments? - ANSWER -toe of slope Given a 210-foot TT bridge. What is the position of launching-nose links? - ANSWER -30x40ft How many personnel does the routine repair detail consists of? - ANSWER -6 How many personnel does the maintenance party usually consist of for important bridges subject to enemy action? - ANSWER -entire assembly crew What is the required safety setback on an unprepared abutment if the bank height is 6 feet? - ANSWER -(1.5) 6ft = 9ft

Mostrar más Leer menos
Institución
Bailey Bridge
Grado
Bailey Bridge








Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Bailey Bridge
Grado
Bailey Bridge

Información del documento

Subido en
12 de diciembre de 2025
Número de páginas
3
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Bailey Bridge Exam Questions And
Answers Verified 100% Correct
Where are all of the measurements taken from for the rollers during site layout? -
ANSWER -The center of the roller to the center of the next roller

How many total personnel are needed to construct a TD Bailey bridge?
(Manpower only) - ANSWER -98 (6 NCO, 92 enlisted)

How many transoms per bay are required to support vehicles over class 70? -
ANSWER -4

What is the assembly time for an 80-foot SS bridge during daylight with trained
personnel? - ANSWER -2 hrs

What is the longitudinal spacing between plain rollers? - ANSWER -25ft

What is the maximum lift obtainable using launching-nose links? - ANSWER -94
1/2 inches

At the outset of World War II, the US Army sought a versatile bridge that could
span a variety of gaps and be quickly assembled by __________________. -
ANSWER -manpower alone

How long is a steel truss section? - ANSWER -10ft

Where would you insert the transoms as the panels of the third bay are being
placed? - ANSWER -in the second bay

What is the short panel pin used for? - ANSWER -pin the end posts of the outer
middle trusses in a triple truss bridge

What is the vertical lift when the launching-nose link is positioned at 10 feet and
40 feet? - ANSWER -67 (1/2) inches
$9.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
TopGradeGuru
1.5
(2)

Conoce al vendedor

Seller avatar
TopGradeGuru Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
10
Miembro desde
1 año
Número de seguidores
0
Documentos
2429
Última venta
1 mes hace
GRADEHUB

We provide access to a wide range of professionally curated exams for students and educators. It offers high-quality, up-to-date assessment materials tailored to various subjects and academic levels. With instant downloads and affordable pricing, it's the go-to resource for exam preparation and academic success.

1.5

2 reseñas

5
0
4
0
3
0
2
1
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes