Bailey Bridge PE Exam Questions with Answers
Task 1: Which of the following are details included within the bridge assembly party? - -all
-Task 2: Which duties are each assembly party detail responsible for completing? - -
Decking Detail
b.
Lay stringers, chess, and ribbands on bridge
Transom Detail
a.
Carry, place and clamp down transoms
Bracing Detail
c.
Obtain, install, and adjust sway braces, rakers, and bracing frames
Panel Detail
d.
Carry, place and pin together panels in the launching nose and bridge
-Task 3: Each unloading party consists of one noncommissioned officer and ___ soldiers. - -
8
-Task 1: In what order should your unit assemble the launching nose of the bridge? - -
place panels
connect second bay
place sway braces
rocking rollers
-When placing the panels on the ground behind the rocking rollers, should the female or
male ends be placed forward? - -female
-Once the panel pins have been inserted, where on the panels are the transoms clamped? -
-behind forward uprights
-What is used to secure the front end of the assembled bays onto the rocking rollers? - -
steel pickets
-Task 1: In what order should your unit construct the first bay of the bridge? - -connect
panels of inner truss to launching nose
add outer truss panels
insert 2nd and 3rd transoms
Task 1: Which of the following are details included within the bridge assembly party? - -all
-Task 2: Which duties are each assembly party detail responsible for completing? - -
Decking Detail
b.
Lay stringers, chess, and ribbands on bridge
Transom Detail
a.
Carry, place and clamp down transoms
Bracing Detail
c.
Obtain, install, and adjust sway braces, rakers, and bracing frames
Panel Detail
d.
Carry, place and pin together panels in the launching nose and bridge
-Task 3: Each unloading party consists of one noncommissioned officer and ___ soldiers. - -
8
-Task 1: In what order should your unit assemble the launching nose of the bridge? - -
place panels
connect second bay
place sway braces
rocking rollers
-When placing the panels on the ground behind the rocking rollers, should the female or
male ends be placed forward? - -female
-Once the panel pins have been inserted, where on the panels are the transoms clamped? -
-behind forward uprights
-What is used to secure the front end of the assembled bays onto the rocking rollers? - -
steel pickets
-Task 1: In what order should your unit construct the first bay of the bridge? - -connect
panels of inner truss to launching nose
add outer truss panels
insert 2nd and 3rd transoms