ANSWERS GRADED A+ 100% VERIFIED.
True or False: At the Company level, users will only have access to view
projects to which they have been specifically granted access to by a
company/project administrator. ANS >>> True
What information can be found in the Commitment Summary Report?
ANS >>> A financial overview of commitments, commitment change
orders, and payments
What information is NOT displayed on a project's Home tab? ANS >>> All
of the Above
How do you make an uploaded file or folder private? ANS >>> All of the
Above
What is the best way to be notified of changes made to a file or folder?
ANS >>> Use the built-in file tracking feature
, True or False: Previously uploaded versions/revisions of a file are
preserved in Procore and are available for download in the file's Version
Log. ANS >>> True
How do you add a document to a project? ANS >>> All of the Above
True or False: There is no way to validate whether or not a user (who
has access to view the file) has downloaded the file from Procore. ANS
>>> False
True or False: If you upload a multi-page drawing set (as a single PDF),
Procore will automatically split up the set into individual drawings. ANS
>>> True
Once a drawing has been reviewed and published, which of the
following data fields can still be edited/changed? ANS >>> All of the
drawing fields listed above
When you review uploaded drawings and manually correct/edit the
auto-filled drawing title and/or number, Procore can dynamically
readjust its processing algorithm for the remaining drawings based on
your changes. ANS >>> True