Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 7 páginas
Examen

VA DEQ SWM INSPECTOR EXAM ACTUAL QUESTIONS AND CORRECT ANSWERS (ALREADY VERIFIED FOR ACCURACY) | 2025/2026 BRAND NEW!!1

Document preview thumbnail
Vista previa 2 fuera de 7 páginas

VA DEQ SWM INSPECTOR EXAM ACTUAL QUESTIONS AND CORRECT ANSWERS (ALREADY VERIFIED FOR ACCURACY) | 2025/2026 BRAND NEW!!1 What element is targeted by water quality criteria? Phosphorous, it indicates pollution by bonding with other pollutants. What is the maximum penalty that may be imposed under the stormwater management act? $32,500 DEQ is responsible for enforcing the ______ while locality _______ are responsible for enforcing local ordinances. Construction GP, VSMP At what % impervious cover are streams substantially affected? 25% Virginia Runoff Reduction Method- method of load calculations load calculations based on land cover type and soil type. what must happen to potentially harmful sheet flow runoff? Must be diverted to stormwater conveyance system. SWM ponds must be able to convey water safely up to what level storm event? must be able to safely convey up to a 100-yr storm. What five things must be included in the general information section of the SWPPP? 1) signed copy of registration statement 2) copy of the notice of coverage letter 3) copy of the construction GP 4) narrative description of the construction activity 5) Legible site plans What is the inspection frequency for a site's qualified personnel in areas which have temporary stabilization? Once a month

Vista previa del contenido

VA DEQ SWM INSPECTOR EXAM 2025-2026 ACTUAL QUESTIONS
AND CORRECT ANSWERS (ALREADY VERIFIED FOR ACCURACY) |
2025/2026 BRAND NEW!!1

What element is targeted by water quality criteria?
Phosphorous, it indicates pollution by bonding with other pollutants.

What is the maximum penalty that may be imposed under the stormwater
management act?
$32,500

DEQ is responsible for enforcing the ______ while locality _______ are
responsible for enforcing local ordinances.
Construction GP, VSMP

At what % impervious cover are streams substantially affected?
25%

Virginia Runoff Reduction Method- method of load calculations
load calculations based on land cover type and soil type.

what must happen to potentially harmful sheet flow runoff?
Must be diverted to stormwater conveyance system.

SWM ponds must be able to convey water safely up to what level storm event?
must be able to safely convey up to a 100-yr storm.

What five things must be included in the general information section of the
SWPPP?
1) signed copy of registration statement
2) copy of the notice of coverage letter
3) copy of the construction GP
4) narrative description of the construction activity
5) Legible site plans

What is the inspection frequency for a site's qualified personnel in areas which
have temporary stabilization?
Once a month

, If qualified personnel discover an ESC practice is not functioning or improperly
installed, how long do they have to fix it?
No longer than 7 days after discovery.

The operator must note all modifications or updates in the SWPPP, including a
record of the following three dates:
major grading, stabilization, and any temporary or permanent ceasing of
construction activity.

How quickly must an unauthorized discharge to surface water be reported to the
DEQ?
Verbal notification within 24 hours, written notification within 5 days

If an area is not at final grade, but may remain dormant for more than 14 days, how
quickly must temporary stabilization be applied?
Within 7 days

If a bare area is at final grade, when must permanent or temporary soil stabilization
be applied?
Within 7 days

Three requirements for concrete wash water:
1) must be directed to a leak-proof container or settling basin
2) container or basin cannot overflow
3) hardened or liquid concrete waste must be removed and properly disposed.

How long must a VSMP authority maintain inspection reports?
For at least three years after permit termination.

If an eventual stormwater BMP utilizes infiltration for pollution removal, would it
be a good co-located practice?
No, a co-located practice involves an ESC measure being converted into a SWM
facility. An infiltration facility would clog if used to settle sediment prior.

What criteria does vegetation need in order to be considered established?
the ground cover must be:
1) uniform
2) mature enough to survive
3) able to inhibit erosion

Información del documento

Subido en
9 de diciembre de 2025
Número de páginas
7
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$10.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
NurseQueen1
4.7
(3)
Vendido
4
Seguidores
0
Artículos
196
Última venta
8 meses hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes