100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

WGU C215 Final Study Guide Operations Management (Latest update ) Questions and Answers 100% Correct {GRADE A} -WGU

Puntuación
-
Vendido
-
Páginas
39
Grado
A+
Subido en
08-12-2025
Escrito en
2025/2026

WGU C215 Final Study Guide Operations Management (Latest update ) Questions and Answers 100% Correct {GRADE A} -WGU Total Quality Management (TQM) Philosophy - correct answer 1. customer focus 2. continuous improvement 3. employee empowerment 4. use of quality tools 5. product design 6. process management 7. managing supplier quality Process Capability Index (Cpk) - correct answer Basic function of Six Sigma. Measures the process potential and performance of processes. The higher the range of Cpk, the improved is the ability of the process to complete its necessities. Six Sigma - correct answer A disciplined, data-driven approach and methodology for eliminating defects (driving toward six standard deviations between the mean and the nearest specification limit) in any process - from manufacturing to transactional and from product to service. Design Capacity - correct answer The theoretical maximum output of a system in a given period under ideal conditions. Location Analysis - correct answer proximity to customers, transportation, source of labor, community attitude, proximity to suppliers, and many other factors. The technique for determining location decisions. Line Processes - correct answer A type of process used to produce a large volume of a standardized product. ■ Limited customization and high volume Batch Processes - correct answer A type of process used to produce a small number of products in groups or batches based on customer orders or specifications. ■ High customization moderate volume Project Processes - correct answer A type of process used to make a one-at-a-time product exactly to customer specifications. ■ Most custom and lowest volume Continuous Processes - correct answer A type of process that operates continually to produce a high volume of a fully standardized product. - No customization and as high a volume as possible Bottleneck - correct answer Longest task in the process. Flexible Manufacturing System (FMS) - correct answer A type of automated system that combines the flexibility of intermittent operations with the efficiency of continuous operations. Output/Input Control - correct answer A technique for monitoring the flow of jobs between work centers. Value-Added - correct answer The net increase created during the transformation of inputs into final outputs. Hybrid Layouts - correct answer Layouts that combine characteristics of process and product layouts. - Group technology layouts.

Mostrar más Leer menos
Institución
Grado











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Grado

Información del documento

Subido en
8 de diciembre de 2025
Número de páginas
39
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

WGU C215 Final Study Guide Operations
Management (Latest update 2026- 2027)
Questions and Answers 100% Correct
{GRADE A} -WGU


Total Quality Management (TQM) Philosophy - correct answer 1. customer focus
2. continuous improvement
3. employee empowerment
4. use of quality tools

5. product design
6. process management

7. managing supplier quality


Process Capability Index (Cpk) - correct answer Basic function of Six Sigma. Measures
the process potential and performance of processes. The higher the range of Cpk, the

improved is the ability of the process to complete its necessities.


Six Sigma - correct answer A disciplined, data-driven approach and methodology for
eliminating defects (driving toward six standard deviations between the mean and

the nearest specification limit) in any process - from manufacturing to transactional
and from product to service.


Design Capacity - correct answer The theoretical maximum output of a system in a

given period under ideal conditions.

, WGU C215 Final Study Guide Operations
Management (Latest update 2026- 2027)
Questions and Answers 100% Correct
{GRADE A} -WGU


Location Analysis - correct answer proximity to customers, transportation, source of
labor, community attitude, proximity to suppliers, and many other factors.


The technique for determining location decisions.


Line Processes - correct answer A type of process used to produce a large volume of

a standardized product.


■ Limited customization and high volume


Batch Processes - correct answer A type of process used to produce a small number
of products in groups or batches based on customer orders or specifications.


■ High customization moderate volume


Project Processes - correct answer A type of process used to make a one-at-a-time

product exactly to customer specifications.


■ Most custom and lowest volume

, WGU C215 Final Study Guide Operations
Management (Latest update 2026- 2027)
Questions and Answers 100% Correct
{GRADE A} -WGU


Continuous Processes - correct answer A type of process that operates continually to
produce a high volume of a fully standardized product.


- No customization and as high a volume as possible


Bottleneck - correct answer Longest task in the process.


Flexible Manufacturing System (FMS) - correct answer A type of automated system

that combines the flexibility of intermittent operations with the efficiency of
continuous operations.


Output/Input Control - correct answer A technique for monitoring the flow of jobs

between work centers.


Value-Added - correct answer The net increase created during the transformation of
inputs into final outputs.


Hybrid Layouts - correct answer Layouts that combine characteristics of process and

product layouts.


- Group technology layouts.

, WGU C215 Final Study Guide Operations
Management (Latest update 2026- 2027)
Questions and Answers 100% Correct
{GRADE A} -WGU


- Cell technology layouts.
- Grocery stores use hybrid layouts


Relationship Chart (REL) - correct answer Table that reflects opinions of managers

with regard to the importance of having any two departments close together.


Rectilinear Distance - correct answer The shortest distance between two locations
using north-south and east-west movements.


From-To Matrix - correct answer Table that gives the number of trips or units of

product moved between any pair of departments.


Block Plan - correct answer Schematic showing the placement of resources in a
facility.


Mean Observed Times - correct answer The average of the observation times for each

of the work elements.


Normal Time - correct answer The mean observed time multiplied by the
performance rating factor by the frequency of occurrence.
$12.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
Exambit

Conoce al vendedor

Seller avatar
Exambit Chamberlain College Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2
Miembro desde
5 meses
Número de seguidores
0
Documentos
334
Última venta
2 semanas hace
Exam_bit

As a trusted professional working as a study material sourcing agent, I offer authentic exam papers directly sourced from reputable institutions, (with genuine copyright) my papers serve as invaluable tools to aid aspiring nurses and many other professions in their exam preparations. Backed by my experience and expertise, I ensure that each paper is meticulously crafted. NOTE!! Supper Discounted, Comprehensive Bundle Packages with Seamless Content, Tailored to Summarize & Perfect each Subject. STUDY LESS STUDY SMART

Lee mas Leer menos
0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes