Asphalt Paving Level 1 Questions and Answers Rated A+

Institución
Asphalt Paving Level 1
Grado
Asphalt Paving Level 1









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Asphalt Paving Level 1
Grado
Asphalt Paving Level 1

Información del documento

Subido en
4 de diciembre de 2025
Número de páginas
5
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Asphalt Paving Level 1 Questions and
Answers Rated A+
A tack truck distributor tank reading of 20/15 translates to - ANSWER-20 inches 15/16s
inches

A temperature corrected quantity of tack to 60 degrees in gallons will be ___ than the
original measured amount measured at higher temperature.
More
Less
The same as
None of the above - ANSWER-More

Align the core barrel over the marked sampling location so that
It is a slight angle to the pavement
It is perpendicular to the truck bumper
It is perpendicular to the pavement surface
The top of the barrel is tilted slightly towards the truck - ANSWER-It is perpendicular to
the pavement surface

Asphalt placed when the mix temperature is too low can cause which of the following
problems?
Texture problems
Density may not be achieved
Ride or smoothness problems
All the above - ANSWER-All the above

Density cores for acceptance testing are not required for:
Mix less than 1 inch thick
Shoulders less than 5 feet wide
Acceleration and deceleration lanes less than 1000 feet in length
Ramos less than 1000 feet - ANSWER-All of the above

For bridge approach slabs, the 15 foot manual straightedge should be set so ____ is on
the bridge deck.
1 inch
Exactly 1/2 of the straightedge
The entire straightedge
None of the above - ANSWER-1 inch

For the first transverse joint on a project place the ___ on the new pavement while
overlapping the transverse joint by one inch.
4 foot level
15 foot manual straight edge

, Rolling straightedge
All the above - ANSWER-15 foot manual straight edge

Given the target mix temperature of 290 degrees and the following truck temperatures
280, 285, 295, 300, 275....
No action is required, just document the results
Reject the load exceeding the master range temperature target
Check the next 5 loads to see if in tolerance and notify the plant - ANSWER-No action is
required

How should asphalt cores be stored when transporting in hot weather?
Stacked on top of each other in a box for each project being sampled
By standing them upright in a cool shady location
By lying them flat in the back of a truck
In the cab of a un air conditioned truck - ANSWER-By standing them upright in a cool
shady location

If a core sample is needed just after paving then
Coring can be done immediately
Let the pavement be cool to the touch before coring
Run extra water from the core rig while coring
Wait until the pavement surface temperature has cooled below 160 degrees before
coring - ANSWER-Wait until the pavement surface temp has cooled below 160 degrees
before coring

If a single load exceeds the established mix by -+ 25 degrees but is within the master
range, the technician will monitor the temperature of every load until
A, The temperatures of five consecutive of 5 consecutive loads are all within 20 degrees
of the target temperature
-b,the average of any 5 consecutive loads are within 15 degrees of the target
C, any single reading must be within 25 degrees of the target
D,the average of 5 consecutive loads is within 25 degrees of target temperature. -
ANSWER-B and c

If the calculated core location is a distance of 544 feet from the starting station of
123+98, what is the station number of the core? - ANSWER-129+42

Referring to general stationing guidelines, R1 would be ____ than R2
Closer to centerline
Closer to outside shoulder
Closure to the inside shoulder
Both A and C - ANSWER-Both A and C

Tack coats are required
Betweeen successful lifts of asphalt base material
On all structural course asphalt layers to constructing the next course
$11.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
CLOUND Exam
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
601
Miembro desde
2 año
Número de seguidores
389
Documentos
10885
Última venta
1 semana hace
PROF MM

HELLO WELCOME TO THIS PAGE WHERE YOU WILL FIND ALL EXAMS ,STUDY GUIDE ,CASE, TESTBANKS AND ANY OTHER STUDY MATERIALS,

3.9

116 reseñas

5
58
4
16
3
29
2
3
1
10

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes