100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

PROJECT MANAGEMENT: THE MANAGERIAL PROCESS, 8TH EDITION ACTUAL 2025/2026 COMPLETE NEWEST VERSION

Puntuación
-
Vendido
-
Páginas
49
Grado
A+
Subido en
02-12-2025
Escrito en
2025/2026

PROJECT MANAGEMENT: THE MANAGERIAL PROCESS, 8TH EDITION ACTUAL 2025/2026 COMPLETE NEWEST VERSION

Institución
PROJECT MANAGEMENT
Grado
PROJECT MANAGEMENT











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
PROJECT MANAGEMENT
Grado
PROJECT MANAGEMENT

Información del documento

Subido en
2 de diciembre de 2025
Número de páginas
49
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

PROJECT MANAGEMENT: THE MANAGERIAL PROCESS, 8TH
EDITION ACTUAL 2025/2026 COMPLETE NEWEST VERSION


Decision Making
Important to get good advice early in the project---initiation
phase


Progression
Projects build up slowly as workers and equipment are
brought to the project and mobilized. Early on only a few
activities may occur, but once mobilization is complete work
proceeds at a rapid pace until the end, when production slows
down and the last remaining items are wrapped up. S-curve
reflects this.


Line represents cash flow and project completion
Three curves: actual, expected, and initial




Engineering
Heavy or horizontal construction


Highway, railroad, bridges, utility, dams

,Industrial
Emphasis on production


Project requires a unique team to plan, design, construct and
maintain the project




By use
-Residential building construction
-Commercial and institutional construction
-Infrastructure and heavy construction
-Industrial construction
-Environmental construction




Categories of construction projects
By size: by ownership, by scope

,Residential construction
Includes single family houses and apartment building
complexes


Privately funded by individual owners or developers


Developers serve as surrogate owners and take charge,
making contractual agreements for design and constructors
and financing the sale of the completed structures


Designs performed by architects and engineers
Construction executed by builders who hire subcontractors for
the structural, mechanical, electrical and other specialty work




Industrial Projects
Involve large scale projects with a high degree of
technological complexity such as oil refineries, steel mills,
chemical processing plants and coal-fired or nuclear power
plants


Owners are deeply involved in development
Prefer to work with designers-builders such that the total time
for the completion of the project can be shortened

, Commercial Buildings
Schools, universities, medical clinics, hospitals, sports
stadiums, shopping centers, warehouses, offices, hotels




Privately funded, though some projects like schools,
courthouses and city offices are publicly funded


Owner may or may not be familiar with construction industry
practices but they're usually able to select competent
professional consultants and arrange the financing of the
constructed facilities themselves


Specialty architects and engineers engaged for designing a
specific building,
Builders/contractors my also be specialized only in that
building




Infrastructure and heavy construction
Include highways, mass transit systems, tunnels, bridges,
pipelines, drainage systems and sewage treatment plants
$12.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
Kylie6764
5.0
(1)

Conoce al vendedor

Seller avatar
Kylie6764 Johns Hopkins University School Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
4
Miembro desde
6 meses
Número de seguidores
0
Documentos
701
Última venta
1 semana hace

Being a tutor, my focus is on offering reliable, accurate study materials to support the students in their exam preparation. Goal is providing best resources like nursing exam test banks, ensuring students shall buy with confidence. I encourage customers to leave reviews after purchases for quality assurance and to recommend my service to others. Thank you for your support and trust.

5.0

1 reseñas

5
1
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes