100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

ICC Vapor Recovery 1 Test Questions And Answers Verified 100% Correct

Puntuación
-
Vendido
-
Páginas
14
Grado
A+
Subido en
02-12-2025
Escrito en
2025/2026

ICC Vapor Recovery 1 Test Questions And Answers Verified 100% Correct The connection of vent risers aboveground to form a single vent opening is called a ____? a. manifold b. flow limiter c. pressure regulator d. pressure vac-vent - ANSWER -a. manifold When installing a Healy VP-1000 Vac-Motor the technician should do all EXCEPT ____ a. replace the nozzle b. wear eye protection c. properly barricade the area d. turn off power to the dispenser - ANSWER -a. replace the nozzle In the Healy EVR Phase II system, the VP-1000 pumps run at full speed only when ____? a. the nozzles on both side of the dispensers are picked up and not authorized b. the nozzle on one side is picked and authorized c. nozzles on both sides are picked up and authorized d. the dispensers on both side are authorized but the nozzles are not dispensing gas - ANSWER -c. nozzles on both sides are picked up and authorized Per EO VR-101-E, the P/V vent cap shall be allowed to ____ ft-lbs a. 10-20 b. 20-50 c. 50-75 d. 75-100 - ANSWER -b. 20-50 In regards to the Healy Phase II EVR System, when the power to the dispenser is on but no nozzles authorized, the VP-1000 motors will run ____? a. for a cycle every 10 minutes b. when the V/L is out of range c. when the ambient temperature is below 40 degrees F d. when the pressure of the underground tank exceeds 2 inches WC - ANSWER -c. when the ambient temperature is below 40 degrees F According to E0 VR-201-A, after installing a new spout assembly in the Healy 900 nozzle, the following test must be conducted, a. V/L b. nozzle bag test c. dispenser leak decay test d. nozzle dispensing shut-off test - ANSWER -d. nozzle dispensing shut-off test According to CP-201, condensate traps shall meet the following requirements EXCEPT: a. CARB certified b. capable of automatic evacuation of liquid c. installed at least below the UST tank level d. equipped with an alarm system in case of failure of the evacuation system - ANSWER -c. installed at least below the UST tank level The minimum internal diameter the underground vapor recovery line after the first manifold and before the tank is ____ inches. a. 1 1/2" b. 2" c. 3" d. 4" - ANSWER -c. 3" When installing the Phil-Tite Phase EVR I system, the installer should reference all of the following materials except: a. applicable Executive Order b. the list of definitions found in VR-101-E c. the Phil-Tite Phase I EVR equipment installation list d. the applicable installation, operation, & maintenance manual - ANSWER -b. the list of definitions found in VR-101-E Gasoline vapors are 3-4 times ____ than air a. lighter b. heavier c. more stable d. more buoyant - ANSWER -b. heavier To test the dispenser piping on the suction of a Healy Phase II system a ____ inch water column gauge is required. a. 0-2 b. 0-5 c. 0-100 d. 0-100 - ANSWER -d. 0-100 Flexible piping must be ____. a. of an approved type, may not be approved for vent lines b. may require a wider trench configuration c. evenly sloped, back towards tank d. all the above - ANSWER -d. all the above In PEI, RP-500, there is a procedure that involves Lockout/Tag out procedures. Which of the following is not part of the procedure?

Mostrar más Leer menos
Institución
ICC Vapor Recovery 1
Grado
ICC Vapor Recovery 1









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
ICC Vapor Recovery 1
Grado
ICC Vapor Recovery 1

Información del documento

Subido en
2 de diciembre de 2025
Número de páginas
14
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

ICC Vapor Recovery 1 Test Questions
And Answers Verified 100% Correct

The connection of vent risers aboveground to form a single vent opening is called
a ____?

a. manifold
b. flow limiter
c. pressure regulator
d. pressure vac-vent - ANSWER -a. manifold

When installing a Healy VP-1000 Vac-Motor the technician should do all
EXCEPT ____

a. replace the nozzle
b. wear eye protection
c. properly barricade the area
d. turn off power to the dispenser - ANSWER -a. replace the nozzle

In the Healy EVR Phase II system, the VP-1000 pumps run at full speed only
when ____?

a. the nozzles on both side of the dispensers are picked up and not authorized
b. the nozzle on one side is picked and authorized
c. nozzles on both sides are picked up and authorized
d. the dispensers on both side are authorized but the nozzles are not dispensing gas
- ANSWER -c. nozzles on both sides are picked up and authorized

Per EO VR-101-E, the P/V vent cap shall be allowed to ____ ft-lbs

a. 10-20
b. 20-50
c. 50-75

, d. 75-100 - ANSWER -b. 20-50

In regards to the Healy Phase II EVR System, when the power to the dispenser is
on but no nozzles authorized, the VP-1000 motors will run ____?

a. for a cycle every 10 minutes
b. when the V/L is out of range
c. when the ambient temperature is below 40 degrees F
d. when the pressure of the underground tank exceeds 2 inches WC - ANSWER -c.
when the ambient temperature is below 40 degrees F

According to E0 VR-201-A, after installing a new spout assembly in the Healy
900 nozzle, the following test must be conducted,

a. V/L
b. nozzle bag test
c. dispenser leak decay test
d. nozzle dispensing shut-off test - ANSWER -d. nozzle dispensing shut-off test

According to CP-201, condensate traps shall meet the following requirements
EXCEPT:

a. CARB certified
b. capable of automatic evacuation of liquid
c. installed at least below the UST tank level
d. equipped with an alarm system in case of failure of the evacuation system -
ANSWER -c. installed at least below the UST tank level

The minimum internal diameter the underground vapor recovery line after the first
manifold and before the tank is ____ inches.

a. 1 1/2"
b. 2"
c. 3"
d. 4" - ANSWER -c. 3"
$13.09
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
TopGradeGuru
1.5
(2)

Conoce al vendedor

Seller avatar
TopGradeGuru Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
10
Miembro desde
1 año
Número de seguidores
0
Documentos
2429
Última venta
1 mes hace
GRADEHUB

We provide access to a wide range of professionally curated exams for students and educators. It offers high-quality, up-to-date assessment materials tailored to various subjects and academic levels. With instant downloads and affordable pricing, it's the go-to resource for exam preparation and academic success.

1.5

2 reseñas

5
0
4
0
3
0
2
1
1
1

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes