100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

Med Gas Test Exam / Newest Version with Well-Detailed Questions and Verified Answers from Reliable Study Resources / Already Graded A+

Puntuación
-
Vendido
-
Páginas
29
Grado
A+
Subido en
01-12-2025
Escrito en
2025/2026

Med Gas Test Exam / Newest Version with Well-Detailed Questions and Verified Answers from Reliable Study Resources / Already Graded A+

Institución
Medical Gas Systems / Healthcare Engineering
Grado
Medical Gas Systems / Healthcare Engineering










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Medical Gas Systems / Healthcare Engineering
Grado
Medical Gas Systems / Healthcare Engineering

Información del documento

Subido en
1 de diciembre de 2025
Número de páginas
29
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Med Gas Test Exam / Newest Version with
Well-Detailed Questions and Verified
Answers from Reliable Study Resources /
Already Graded A+


When is the initial pressure test conducted, by a Medical Gas installer,
on a nitrous oxide system?
A. after blowdown of a distribution piping
B. After installation of alarm sensors
C. Before blow down of distribution piping
D. Before installation of station rough-in-assemblies
A. after blowdown of a distribution piping
In those portions of systems intended to handle oxygen at pressures
greater than 350 psi, the interconnecting hose shall NOT
contain______materials.
A. Brass
B. Copper
C. Polymeric
D. Stainless Steel
C. Polymeric
In a Category 1 Dental and Gas Vacuum Piping system, which of the
following is an NFPA 99 requirement for the labeling of pipes?
A. Color coding
B. Fixed label width
C. Label shall wrap completely around the pipe
D. Reflective labe
A. Color coding

,Refer to Diagram 1. Identify #5
A. In-line valve
B. Main control valve
C. Service valve
D. Zone valve
Refer to diagram 1. Identify #6
A. Alarm sensors
B. Future valve
C. History valve
D. Service valve
Which of the following treatments shall be performed before brazing
cut ends of a tube to be installed in a medical gas piping system?
A. An argon gas purge shall be performed
B. Cut ends shall be rolled smooth or deburred.
C. Extensions shall be added for brazing.
D. Treatment is NOT required, they may be brazed "as is"
B. Cut ends shall be rolled smooth or deburred.
Manifolds for gas cylinders shall actuate a(n)_______signal and shall
activate an indicator at all_______alarm panels to indicate when or
just before changeover from one header to the other.
A. Area, master
B. Local, master
C. Master, area
D. Master, local
B. Local, master
In a non-anesthetizing area, on which side of a zone valve shall the
pressure/vacuum sensor be located?
A. Station outlet/inlet
B. Source side
C. Upstream side
D. NFPA 99 does not specify a requirement

, A. Station outlet/inlet
What is the purpose of using an oxygen analyzer during the piping
purge prior to brazing?
A. Assure that all ambient air has been removed from the pipeline.
B. Maintain a nitrogen atmosphere of at least 95% within the piping
system.
C. Provide continuous monitoring during the verification test.
D. Reduce the oxygen concentration below 5% before brazing
A. Assure that all ambient air has been removed from the pipeline.
A medical gas master or area alarm panel shall be set to actuate
a(n)_________indicator when the communication with an alarm-
initiation device is disconnected.
A. Audible
B. Audible and visual
C. Service
D. Visual
B. Audible and visual
The tool shown below allows the installer to mechanically limit the
makeup depth of the fitting to be brazed. Under what conditions is
this method permitted for the installation of medical gas piping?
A. Only on final line connections
B. Only on vacuum systems
C. Where a BCuP 5 brazing rod is used
D. Where socket depths confirm top ANSI/ASME
D. Where socket depths confirm top ANSI/ASME
Refer to Diagram II, Medical Air Intake Location. Choose the minimum
height (feet) required from ground level to the location at the capital
letter "A" (Diagram is not to scale)
A. 10 feet
B. 20 feet
$26.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
munenekariuki

Conoce al vendedor

Seller avatar
munenekariuki Northeast Ohio Medical University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1
Miembro desde
7 meses
Número de seguidores
0
Documentos
121
Última venta
6 meses hace

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes