100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

NCCCO Telescopic Core 2025/2026 | CRT-001 | 100+ Solved Questions – Boom Configuration, Jib Safety & Load Control

Puntuación
-
Vendido
-
Páginas
6
Grado
A+
Subido en
30-11-2025
Escrito en
2025/2026

This document contains 100+ expertly solved exam questions and answers designed for the NCCCO Telescopic Core 2025/2026 Certification, under course code CRT-001, following the requirements of the Crane Institute Certification (CIC) and fully aligned with OSHA 1926 Subpart CC and ASME B30.5 standards. It provides essential test preparation focused on telescopic boom crane configuration, load handling, personnel lifting, and safe operation in various terrain and setup conditions. The questions are structured around real-world crane operation challenges, covering: Boom and jib setup, including stowed vs. erected position, offset impacts, side-loading hazards, and extension balance Load chart use, capacity deductions, effective weight calculations, and boom angle adjustments for partially extended lifts Personnel lifting requirements, such as anti-two-block systems, boom angle indicators, controlled load lowering, and OSHA 1926.1431 compliance Outrigger and ground support safety, including blocking requirements, corner loading, and float stability Stability and tipping risks, such as backward tipping at short radius, quadrant strength (rear/front/side), and load leverage effects Travel operations, including suspended load control on rough terrain cranes, boom orientation, and tag line safety near power lines Signal and device protocols, such as boom angle indicators, swing path monitors, and lockout systems during two-block activation Crane limitations, including what components can or cannot be removed from carry deck cranes during operation This study material is highly suited for: Candidates preparing for NCCCO telescopic boom core exams Vocational trainees in heavy equipment operation and construction crane programs Engineering students focusing on lifting operations and job site safety Crane operators, riggers, and lifting coordinators managing mobile crane configurations in tight, uneven, or hazardous environments Employers conducting internal safety testing or certification readiness assessments Built around practical OSHA-regulated operations and tested principles, this document supports crane professionals in mastering both exam performance and job site execution. Keywords: NCCCO Telescopic Core 2025, CRT-001, boom extension safety, OSHA 1926.1431, jib offset radius, anti two-block lockout, crane tipping factors, load radius change, swing path stability, side loading risk, tag line use, boom angle indicator, blocking under outriggers, quadrant lifting strength, personnel platform lifting, dynamic load handling, rough terrain travel, effective boom setup

Mostrar más Leer menos
Institución
Nccco
Grado
Nccco









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Nccco
Grado
Nccco

Información del documento

Subido en
30 de noviembre de 2025
Número de páginas
6
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

NCCCO Telescopic Core 2025/2026
Exam Questions and Answers | A+ Score
Assured



When lifting off the main boom, how is the effective weight of the fly/jib

different in the erected position from that of the stowed position - 🧠

ANSWER ✔✔a. Effective weight increases


Who must determine maximum speed for a mobile crane to travel with a

suspended load. - 🧠 ANSWER ✔✔The competent person


How does the effective weight of a stowed extension relate to the actual

weight of the extension? - 🧠 ANSWER ✔✔Lower than the actual weight.

, Using a telescopic mobile crane and lifting off the jib with the main boom

partially extended, you should use _________ to determine gross capacity.

- 🧠 ANSWER ✔✔Boom Angle


If not listed in the load\capacity chart or notes for a telescopic boom crane

and you are in between boom lengths, you should: - 🧠 ANSWER ✔✔Use

the lowest shorter or longer.

Which of the following is required to be on a mobile telescopic boom crane

in order to lift a personnel platform. - 🧠 ANSWER ✔✔Boom length indicator


When operating a rough terrain crane and extending the outrigger beams

from the upper cab you should? - 🧠 ANSWER ✔✔Make visual contact with

beam and jack

When a mobile cranes telescopic boom sections are required to be

extended equally and they are not,what effect could be which of the

following? - 🧠 ANSWER ✔✔Damage to the shortest extended section.


What item listed below can be removed from a carry deck mobile crane,

andcontinue to be operational? - 🧠 ANSWER ✔✔Jib/fly/extension


What is the primary reason for lifting off a boom extension mounted on a

mobile telescopic boom crane? - 🧠 ANSWER ✔✔Increase height.
$15.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
NinjaNerd Liberty University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
206
Miembro desde
1 año
Número de seguidores
4
Documentos
12228
Última venta
1 día hace
NinjaNerd

Here You will All Documents and Package Deals Offered by Seller NinjaNerd.

3.8

31 reseñas

5
14
4
5
3
7
2
2
1
3

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes