100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

EXAC SECTION 4 - SIMPLY EXAM QUESTIONS AND ANSWERS

Puntuación
-
Vendido
-
Páginas
8
Grado
A+
Subido en
29-11-2025
Escrito en
2025/2026

EXAC SECTION 4 - SIMPLY EXAM QUESTIONS AND ANSWERS

Institución
EXAC
Grado
EXAC









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
EXAC
Grado
EXAC

Información del documento

Subido en
29 de noviembre de 2025
Número de páginas
8
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

EXAC SECTION 4 - SIMPLY EXAM
QUESTIONS AND ANSWERS

Bond - Correct Answers -- A financial security that represents a promise to repay a fixed
amount of funds
- Financial security for the performance of an obligation; usually a written document
supported by a pledge of collateral.

Surety - Correct Answers -The party (company) that issues a bond which guarantees
the performance of the person bonded (in construction, the contractor) to fulfill
obligations under contract within the financial and time limitations stated in the bond.

Warranty (warranty against the quality) - Correct Answers -A statement of fact or quality
intended to be relied upon by another party, carrying with it an implied or express
promise to make good any breach

Lien - Correct Answers -- legal claim on real property to satisfy a debt owed to the lien
claimant by the property owner. This claim can carry the right to sell the property upon
default.
- a right to keep possession of property belonging to another person until a debt owed
by that person is discharged.

Shop Drawings - Correct Answers -A drawing, prepared on behalf of the contractor to
indicate precise details of the construction materials, for fabrication, production or
installation.

Shop Drawing Review - Correct Answers -First, Gen. Contractor reviews shop
drawings. Second, architect and consultant review (snd approved construction dwgs
prior to fabrication). Lastly, shop drawings are returned to contractor for use, use w/
change, or resubmission.

Certificate of Substantial Performance - Correct Answers -A certificate issued under the
appropriate lien legislation attesting that the contract between the owner and the
contractor is substantially complete.

Holdback - Correct Answers -"A percentage of the monetary amount payable under a
(construction) contract, which is held back as security for a certain period of time. The
percentage and period of time are based on the provincial lien legislation."

, General Review/ Field Review - Correct Answers -"Review during visits to the Project
site (at intervals appropriate to the stage of the construction)" ... "to determine that the
Work is in general conformity with the construction documents."

Project Management - Correct Answers -"The process of planning, scheduling,
directing, organizing and controlling all resources (financial, physical and human) from
the start to the completion of the project goals and objectives." In many projects, the
owner is, by default, the Project Manager (PM)."

Construction Management - Correct Answers -- Construction manager (CM) may take
on the roles and responsibilities of an advisor, an agent or a constructor. The CM is
most frequently confined to:
- Advising on, or preparing schedules, budgets, material selection and detailing, during
the design phase
- Advising on and arranging for all services and trade and supervising the activities of
all trade contractors

Design-Bid-Build - Correct Answers -CCDC 2 ‐ Stipulated Price Contract
CCDC 3 ‐ Cost Plus Contract
CCDC 4 ‐ Unit Price Contract

- Involves three parties: Owner, Consultant and Contractor
- Not always best value to customer as costs are generally higher

The owner contracts two separate agreements:
- The Consultants design and prepare construction documents, based on a
predetermined budget.
- After bidding and negotiation, the job is awarded to the successful bidder as a fixed
price contract.
- The Contractor builds the project with the Consultants providing construction
administration and representing the owner.
Advantages
- Competitive Tendering
- The lowest risk factor, since: All design decisions have been made, The Budget has
been established, and the completion date can be fairly predicted.
Disadvantages
- It takes longer to complete a project, since construction cannot start until design have
been completed and tendered.
- Frequently results in adversarial or confrontational relati

Design Build (DB) - Correct Answers -CCDC 14 - Design-Build Stipulated Price
Contract
CCDC 15 - Design Services Contract between Design-Builder and Consultant

- The owner contracts with a single entity (design‐builder), to provide both design and
construction services. The Contractor most often leads the design‐build team.
$12.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
mereka Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
459
Miembro desde
2 año
Número de seguidores
215
Documentos
9101
Última venta
1 día hace
anchor

on this page, you will find all documents, package deal

3.9

87 reseñas

5
43
4
15
3
13
2
5
1
11

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes