100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

CMIT EXAM QUESTIONS AND ANSWERS 2025

Puntuación
5.0
(1)
Vendido
2
Páginas
33
Grado
A+
Subido en
28-11-2025
Escrito en
2025/2026

CMIT EXAM QUESTIONS AND ANSWERS 2025

Institución
CMIT
Grado
CMIT











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
CMIT
Grado
CMIT

Información del documento

Subido en
28 de noviembre de 2025
Número de páginas
33
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

CMIT EXAM QUESTIONS AND ANSWERS 2025




A CM's role and responsibilities are governed solely by the Owner/CM Agreement.

True False - (ANSWER)True



There are two basic forms of CM, agency and at-risk. Each form provides for the basic services of
construction management practice. However, there are some key differences. Which of the following do
not apply to both CM forms?

A) Both forms provide advice to the owner on constructibility, budget and the schedule.

B) Both require that the liabilities and risks assumed by the parties be clearly understood, coordinated,
and stated in the respective contracts.

C) Both forms allow the CM to function in an advisory role for the entire engagement of the CM.

D) Services can vary based on the contractual relationships of the parties and the risks that are assumed.
- (ANSWER)C) Both forms allow the CM to function in an advisory role for the entire engagement of the
CM.



Construction management had its beginnings in the early to mid-1960's. Which of the following factors
contributed to the initial use of this delivery system?

A) The need to reduce the overall time and cost associated with project delivery.

B) The increasing cost of money and the unpredictability of project funding streams.

C) The changing role of the general contractor and the increasing numbers of specialty trade
contractors.

D) All of the above. - (ANSWER)D) All of the above.



The General Services Administration was the first federal agency to use construction management. -
(ANSWER)True



The General Services Administration, the Department of Health, Education and Welfare (now HHS), and
the Veterans Administration ran into similar difficulties in the use of construction management. Which
of the following was/were common problems for all three agencies?

A) Funding restrictions

B) Claims

C) Change conditions

,CMIT EXAM QUESTIONS AND ANSWERS 2025




D) All of the above - (ANSWER)D) All of the above



CMAA was formed and incorporated 1982 with its primary focus being the growth and development of
the construction management profession. - (ANSWER)True



The CMAA Construction Management Standards of Practice is intended as a guide to the range of
services that constitute professional construction management. They seek to meet the documented
need for definitions of what construction management services are, without unduly structuring the
methodologies by which those services are provided by the CM. - (ANSWER)True



The goals of the Construction Management Association of America (CMAA) include:

A) Setting standards and developing contract documents for construction management practice.

B) Expanding the understanding of the construction management concept and its use in the
marketplace.

C) Advocacy for construction management in the legislative, regulatory, and judicial arenas of federal,
state, and local governments.

D) All of the above. - (ANSWER)D) All of the above



The fact that an individual is certified or licensed in any other profession does not, per se, establish
him/her as a qualified CM.

True False - (ANSWER)True



Certification as a CM means the construction management practitioner has "state of the art" knowledge
and capability to practice construction management.

True False - (ANSWER)False



Recruiting and training are business matters and normally do not involve ethical concerns.

True False - (ANSWER)False



Construction management is a concept that is susceptible to overselling.

,CMIT EXAM QUESTIONS AND ANSWERS 2025




True False - (ANSWER)True



Failure to provide quality services is a business and not an ethical question.

True False - (ANSWER)False



Contracting for adequate fees is both a business and an ethical issue.

True False - (ANSWER)True



The ethics of the CM profession focus primarily on a CM's relationships in dealing with its clients.

True False - (ANSWER)True



The possible approaches for delivering a project are virtually unlimited. A key reason for such variations
is:

A) The different roles that can be assumed by project participants.

B) Different forms of contracts and methods of compensation that can be used.

C) The different levels of care, responsibility, and risks assumed by the parties involved.

D) All of the above. - (ANSWER)D) All of the above



The traditional delivery system is characterized by executing the major phases of a project in:

A) An overlapping concept

B) A linear sequence

C) A fast track method

D) All of the above - (ANSWER)B) A linear sequence



A key advantage of the traditional delivery approach is:

A) With the traditional delivery system, the cost of the construction phase is known before construction
starts.

B) Facility features are fully determined & specified.

, CMIT EXAM QUESTIONS AND ANSWERS 2025




C) When the construction contract is signed, the major risk belongs to the contractor.

D) All of the above - (ANSWER)B) Facility features are fully determined & specified.



Design-build and at-risk construction management delivery systems allow the option to fast-track or
phase a project.

True False - (ANSWER)True



Most definitions of construction management are similar. However, a contractual definition is not
known until:

A) The legal form of the CM contract is chosen.

B) The specific scope of services to be provided is identified.

C) The relationship of the CM to others and the risks and authority assumed by the parties are clearly
defined.

D) All of the above - (ANSWER)D) All of the above



21.

In a CM-at-Risk arrangement once construction begins and the CM converts from the professional
advisory role of a CM to the contractual role of a general contractor, the CM has no implied duties of
loyalty and care to the owner.

True False - (ANSWER)True



The agency CM does not perform design or actual construction work.

True False - (ANSWER)True



Under the CM-at-Risk delivery method, the owner usually must deal with the hybrid of a construction
manager and a general contractor.

True False - (ANSWER)True



Under a CM-at-risk contract, which of the following statements are true?

A) The CM, in most cases, holds the trade and/or specialty contracts.
$21.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Reseñas de compradores verificados

Se muestran los comentarios
5 días hace

5.0

1 reseñas

5
1
4
0
3
0
2
0
1
0
Reseñas confiables sobre Stuvia

Todas las reseñas las realizan usuarios reales de Stuvia después de compras verificadas.

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Belaire Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2748
Miembro desde
1 año
Número de seguidores
0
Documentos
1355
Última venta
4 días hace

5.0

498 reseñas

5
486
4
11
3
1
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes