CUSP - T&D EXAM | QUESTIONS AND ANSWERS | VERIFIED ANSWERS GRADED A+ | LATEST EXAM

Puntuación
-
Vendido
-
Páginas
59
Grado
A+
Subido en
26-11-2025
Escrito en
2025/2026

CUSP - T&D EXAM | QUESTIONS AND ANSWERS | VERIFIED ANSWERS GRADED A+ | LATEST EXAM

Institución
CUSP - T&D
Grado
CUSP - T&D











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
CUSP - T&D
Grado
CUSP - T&D

Información del documento

Subido en
26 de noviembre de 2025
Número de páginas
59
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

CUSP - T&D EXAM | QUESTIONS AND ANSWERS | VERIFIED
ANSWERS GRADED A+ | LATEST EXAM




As per CAN/ULC S801, on an electrical distribution overhead utility line
circuit, verification of voltage absence can be achieved by: - CORRECT
ANSWER - Using an approved voltage detector.


Isolation and tagging (no locks) is acceptable on an overhead distribution circuit
under some of the following conditions, EXCEPT for: - CORRECT ANSWER
- The isolation can be operated from the ground directly at the base of a
structure.


Isolation and tagging (no locks) is acceptable for an overhead distribution
circuit under some of the following conditions: - CORRECT ANSWER - 1.
The isolation point is a physical and visual like a line cut or riser removed.
2. The isolation point can only be operated by the operating authority or
qualified worker.
3. The isolation point is protected from unauthorized access such as vertical
height spacing.


Consider that a circuit has been isolated, tagged and grounded. workers
returning the next day must: - CORRECT ANSWER - Visually check grounds
to verify they are in good order, secure and test for voltage.


For lockout purposes, energy isolating devices shall be labelled or marked using
a standardized nomenclature and format to indicate their function. Identification
shall include: - CORRECT ANSWER - The equipment type, energy type, and
magnitude.

,Utilities often use a permitting system due to special circumstances of which
conventional lockout is impracticable. The following is NOT a justified
approach to this process: - CORRECT ANSWER - The isolation points are
only simple single step actions.


A high voltage utility or electrical company is authorized to use Complex
Lockout (tag permitting) under what regulatory condition: - CORRECT
ANSWER - A variance application has been approved by the provincial
authority.


Utilities often use a permitting system due to special circumstances of which
conventional lockout is impracticable. The following are justified approaches to
this process: - CORRECT ANSWER - 1. The isolation points are located in
remote areas with difficult or restricted access.
2. The length of time to perform the lockout is impracticable.
3. Excessive numbers of persons required to lockout.


Work on a distribution line must consider the following items when performing
isolation and de-energizing of the circuit.: - CORRECT ANSWER - 1.
Whether there are multiple sources of energy (loop feed) on the circuit.
2. Is the line isolating device capable of interrupting load.
3. Is the line to be subject to inductive or capacitive charge.


According to the CAN/ULC S801, what is the LEAST DESIRABLE type of fall
protection: - CORRECT ANSWER - Fall Arrest System (FAS)


Within Z259.14 standards fall restriction equipment (FRE) may only be leather
in subcomponents or elements that are NOT exposed to: - CORRECT
ANSWER - A dynamic load.


As per Z259 standards, energy absorbing lanyards shall be classified according
to their ability to absorb the kinetic energy from a fall as follows: - CORRECT

,ANSWER - Class E4 (4.0 kN) and Class E6 (6.0 kN) energy absorbing
lanyards.


Assuming that the fall protection system is correctly being used, in what
scenario might the worker still contact the ground if they fell: - CORRECT
ANSWER - Working 16 feet up in a bucket truck on distribution secondary
services using a six foot shock absorbing lanyard, connected to the approved
bucket anchor.


What is NOT defined as a requirement of temporary vertical life lines as per
Z259 standards: - CORRECT ANSWER - 100% polypropylene fibers provide
the greatest breaking strength.


Requirements of temporary vertical life lines, as per Z259 standards: -
CORRECT ANSWER - 1. Shall be made from synthetic fibers with breaking
strength of 27 kN or greater.
2. They shall be free of splices and knots, except at the terminations.
3. They shall be installed to protect against abrasion and sharp edges.


Working on an energized lattice tower requires emergency response consistent
with the associated hazards. What is NOT required as part of the emergency
planning: - CORRECT ANSWER - Daily practice of tower rescue method.


Working on an energized lattice tower requires emergency response consistent
with the associated hazards, including: - CORRECT ANSWER - 1. A means to
contact the operating authority to de-energize the circuit.
2. Rescue equipment readily available to quickly and safely lower the worker.
3. Regular rescue practices on tower rescue at an appropriate frequency.


Z259.14 wooden pole choker devices that are designed and tested to restrict a
workers fall distance under dry, wet, and icy conditions are classified as: -
CORRECT ANSWER - Type AB device.

, The voltage limits and mechanical strength of a live line tool is best specified
by: - CORRECT ANSWER - The manufacturers requirements.


Live line tools can be modified to meet the needs of the work. What is NOT an
acceptable strategy for tool modification: - CORRECT ANSWER - A utility
worker has evaluated the tool modification and approved the change.


Live line tools can be modified to meet the needs of the work. Acceptable
strategies for tool modification include: - CORRECT ANSWER - 1. Changes
to the tool do not violate other applicable standards.
2. The tool has been inspected and tested by a professional engineer.
3. The tool modification was approved by an engineer using applicable
standards.


Insulating hot rope (live line rope) is tested in accordance to ASTM F1701. The
purpose of this test is to: - CORRECT ANSWER - Determine the current
leakage under dry and wet rope conditions.


Live line rigid cover in compliance with CAN/ULC-61229 includes the
following pieces or protective insulating equipment EXCEPT for: - CORRECT
ANSWER - Insulating line hose.


Live line rigid cover in compliance with CAN/ULC-61229 includes the
following pieces or protective insulating equipment, including: - CORRECT
ANSWER - 1. Conductor cover (air guard).
2. Pole guard.
3. Switch and insulator shields.


This statement is true, regarding the application of cover-up on energized high
voltage lines: - CORRECT ANSWER - If left overnight, a visual inspection
must be performed at minimum prior to use.
$23.89
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
tutorlorghon University Of Massachusetts
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
692
Miembro desde
1 año
Número de seguidores
16
Documentos
3545
Última venta
1 semana hace
TutorLORGHON

On this page you will find Nursing exams , testbank exams and case study among other many exams. We sell the best exams. Buy and have no regrets.

4.8

233 reseñas

5
198
4
22
3
7
2
3
1
3

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes