PCM EXAM REVIEW 1 QUESTIONS
WITH 100% CORRECT ANSWERS
LATEST VERSION 2025/2026.
A green belt conducts a frequency analysis with a bar chart and finds that intake staff's policy
and procedure awareness and unnecessary hard copy filing account for 80% of the delay in the
application review process. What type of analysis did the Green belt most likely use? -
ANS Pareto Analysis
A black belt conducted a study to determine the effect of bonus pay on employee performance
evaluation scores at a car manufacturing company. After running a correlation test she
discovered that r equaled -0.78. She concluded that: - ANS Employee performance seems to
suffer with bonuses
The original Six Sigma methodology sought to achieve 1 defect per.. - ANS 3.4 Million
Opportunities
A newly hired Green Belt was tasked by his supervising Black Belt to calculate Cp. He was given
incomplete information showing that USL is 7.2 and Specification Range is 4.3. How much is
LSL? - ANS 2.9
A Black Belt tasked a junior Yellow Belt to calculate the Cpk of an energy drink producing
process with a tolerance of 5 (LSL) and 5.30 (USL) and SD 0.045. Data is normal and the process
is stable. What is Cpk? - ANS 1.11
1 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.
, A Six Sigma team identified that the calculator frame production process produced sooner or
faster or in greater quantity than is needed by the next operation. What type of muda did the
Six Sigma identify : - ANS Overproduction
Muda - ANS waste and refers to the inefficiencies within process which you can seek to
reduce or eliminate entirely
A Green Belt is tasked by a Master Black Belt to calculate the takt time for 36 disability
eligibility determination intake applications which need to be processed in 1020 minutes. The
green belt correctly calculates the takt time to be:
**(Takt time is the rate at which products or services should be produced to meet the rate of
customer demand. Divide 1020 by 36 to get answer)** - ANS 28.3
Which of the following is an example of an attributes control chart? - ANS U-chart
A Six Sigma team is tasked to identify a faulty step in an application intake and eligibility
determination process. The most appropriate tool the team should use to better understand the
process is: - ANS Flowchart
Within the framework of a Six Sigma project improvement team at a high performing local
government agency is trying to collect information on the service standard preferences of the
people served. What is the Six Sigma team trying to determine? - ANS VOC
A large beer brewery commissioned a Lean Six provider to provide freeSix Sigma training for its
quality management division employees. The whole training project is planned to proceed in 7
phases over the course of 6 months. Which is the most appropriate tool to track the progress of
the six sigma training project? - ANS Gannt Chart
2 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.
WITH 100% CORRECT ANSWERS
LATEST VERSION 2025/2026.
A green belt conducts a frequency analysis with a bar chart and finds that intake staff's policy
and procedure awareness and unnecessary hard copy filing account for 80% of the delay in the
application review process. What type of analysis did the Green belt most likely use? -
ANS Pareto Analysis
A black belt conducted a study to determine the effect of bonus pay on employee performance
evaluation scores at a car manufacturing company. After running a correlation test she
discovered that r equaled -0.78. She concluded that: - ANS Employee performance seems to
suffer with bonuses
The original Six Sigma methodology sought to achieve 1 defect per.. - ANS 3.4 Million
Opportunities
A newly hired Green Belt was tasked by his supervising Black Belt to calculate Cp. He was given
incomplete information showing that USL is 7.2 and Specification Range is 4.3. How much is
LSL? - ANS 2.9
A Black Belt tasked a junior Yellow Belt to calculate the Cpk of an energy drink producing
process with a tolerance of 5 (LSL) and 5.30 (USL) and SD 0.045. Data is normal and the process
is stable. What is Cpk? - ANS 1.11
1 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.
, A Six Sigma team identified that the calculator frame production process produced sooner or
faster or in greater quantity than is needed by the next operation. What type of muda did the
Six Sigma identify : - ANS Overproduction
Muda - ANS waste and refers to the inefficiencies within process which you can seek to
reduce or eliminate entirely
A Green Belt is tasked by a Master Black Belt to calculate the takt time for 36 disability
eligibility determination intake applications which need to be processed in 1020 minutes. The
green belt correctly calculates the takt time to be:
**(Takt time is the rate at which products or services should be produced to meet the rate of
customer demand. Divide 1020 by 36 to get answer)** - ANS 28.3
Which of the following is an example of an attributes control chart? - ANS U-chart
A Six Sigma team is tasked to identify a faulty step in an application intake and eligibility
determination process. The most appropriate tool the team should use to better understand the
process is: - ANS Flowchart
Within the framework of a Six Sigma project improvement team at a high performing local
government agency is trying to collect information on the service standard preferences of the
people served. What is the Six Sigma team trying to determine? - ANS VOC
A large beer brewery commissioned a Lean Six provider to provide freeSix Sigma training for its
quality management division employees. The whole training project is planned to proceed in 7
phases over the course of 6 months. Which is the most appropriate tool to track the progress of
the six sigma training project? - ANS Gannt Chart