ATSSA Traffic Control Supervisor
"The Typical Project" Module 7
Save
Terms in this set (15)
Nature of the work
access requirements
drainage issues, drainage during construction
Constructability construction equipment
size of work space
Access to work area
room to maneuver equipment
, Daytime work 1 to 12 Short-term stationary (MUTCD work duration
hours category)
cones and portable
signs
What stage:
Design Select best traffic control alternative
based on: safety, mobility, cost, constructability
Long-term stationary What are the MUTCD categories of Work
Intermediate-term Duration?
stationary
short-term stationary
short-duration
mobile
More than 1 day, less Intermediate-stationary (MUTCD work duration
than 3 days category)
Nightime work of more
than 1 hour
"The Typical Project" Module 7
Save
Terms in this set (15)
Nature of the work
access requirements
drainage issues, drainage during construction
Constructability construction equipment
size of work space
Access to work area
room to maneuver equipment
, Daytime work 1 to 12 Short-term stationary (MUTCD work duration
hours category)
cones and portable
signs
What stage:
Design Select best traffic control alternative
based on: safety, mobility, cost, constructability
Long-term stationary What are the MUTCD categories of Work
Intermediate-term Duration?
stationary
short-term stationary
short-duration
mobile
More than 1 day, less Intermediate-stationary (MUTCD work duration
than 3 days category)
Nightime work of more
than 1 hour