Defense Acquisition University Risk Management Questions With Verified Solutions 100% Correct Answers Already Graded A+

Vista previa del contenido

Defense Acquisition University Risk
Management Questions With
Verified Solutions 100% Correct
Answers Already Graded A+
QUESTIONS AND ANSWERS

What is Risk? ANSWER -Risk: a measure of the potential inability to achieve overall
program objectives within defined cost, schedule, and technical constraints.

What is Risk Management? ANSWER -A method for dealing with uncertainty.

- "Known-unknowns" - can be planned for, monitored and actively countered

- "Unknown-unknowns" - Identified/reduced through Risk Management process,
residuals are Risk Management failures; the program can only react to these

What are the five major phases in the Risk Management process? ANSWER -1. Risk
Management Planning

2. Risk Identification

3. Risk Analysis

4. Risk Response Planning

5. Risk Monitoring and Control

What are some activities of the Risk Management Planning phase? ANSWER --
Deciding how to approach and conduct risk management for a specific project

-Analysis of the level, type, and visibility of risk management needed

-Produces the Risk Management Plan

, What are some activities of the Risk Identification phase? ANSWER -Answers the
question "What can go wrong?" by:

-Looking at current and proposed staffing, process, design, supplier, operational
employment, resources, dependencies, etc.

-Monitoring test results, especially test failures

-Reviewing potential shortfalls against expectations

-Analyzing negative trends




What are some activities of the Risk Analysis phase? ANSWER -Answers the
question "How big is the risk?" by:

-Considering the likelihood of the root cause occurrence

-Identifying the possible consequences in terms of performance, schedule, and cost

-Identifying the risk level using the Risk Reporting Matrix




What are some activities of the Risk Response Planning phase? ANSWER -Answers
the question "What is the program approach for addressing this potential unfavorable
consequence?" by one or more of the following:

-Assuming the level of risk and continuing on the current program plan

-Avoiding risk by eliminating the root cause and/or the consequence

-Mitigating the cause or consequence

-Transferring the risk




What are some activities of the Risk Monitoring and Control phase? ANSWER -
Answers the question "How can the planned risk response be implemented?"
It:

Información del documento

Subido en
20 de noviembre de 2025
Número de páginas
8
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$11.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
8
Seguidores
0
Artículos
1088
Última venta
1 mes hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes