100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

CAPM Study Questions with Answers (100% Correct Answers)

Puntuación
-
Vendido
-
Páginas
18
Grado
A+
Subido en
19-11-2025
Escrito en
2025/2026

CAPM Study Questions with Answers (100% Correct Answers) CAPM Study Questions with Answers (100% Correct Answers)

Institución
CAPM
Grado
CAPM










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
CAPM
Grado
CAPM

Información del documento

Subido en
19 de noviembre de 2025
Número de páginas
18
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

1




CAPM Study Questions with Answers (100%
Correct Answers)
Which of the following is a PMIS tool that can be used to execute the Manage
Communications Process? Answer: Social Media Management

All of the following are true about the project scope statement except Answer:
It is an output of the validate scope process

Project managers echibit different leadership styles each of the following is a
common leadership style except Answer: Motivational

which of the following contract types are used when the requirements are well
defined and nor significant changes to the scope are expected Answer: fixed
price contracts

in predictive projects the scope baseline for the project is the approved version
of which document Answer: project scope statement

which of the followingare considerations for tailoring for project schedule
management Answer: life cycle approach, resource availability, andd project
dimensions

which of the following is the process of analyzing sequences, durations,
resoruce requirements, and schedule constraints to create the project schedule
module for project execution and monitoring and controlling Answer: Develop
schedule

which of the following are types of project management office PMO structures
Answer: supportive, controlling, and directive

the process of formalizing acceptance of the completed project is which project
management process associated with the project scope management knowledge
area Answer: validate scope

,2


understanding, evaluating, defining, and managing requirements are essential
to satisfying Answer: customer expectations

what are the four processes in project stakeholder management Answer:
Identify Stakeholders.

Plan Stakeholder Engagement.

Manage Stakeholder Engagement.

Monitor Stakeholder Engagement.

Analogous cost estimating uses which of the following costs? Answer: The
actual cost of previous, similar projects.

what is used to construct a schedule model in which activities are represented
by nodes and graphically linked by one or more logical relationships to show
the performance sequence Answer: precedence diagramming method PDM

what is the process of developing options, selecting strategies, and agreeing on
actions to address overall project risk exposure, as well as treat individual
project risks Answer: plan risk responses

the three dimensions of complexity are defined as which of the following
Answer: system behavior, human behavior, and ambiguity

change requests are processed for review and disposition through the Perform
Integrated Change Control process and may include which of the following
types of change activities Answer: corrective action, preventative action, defect
reapir

which of the following describes a comprhensive list of changes submitted
during the project and their current status Answer: change log

during which time are team members commitments to the project strengthened
Answer: planning

, 3


all of the following statements about manage stakeholder engagment are true
except Answer: The ability of stakeholders to influence the project is typically
lowest during the initial stages and gets progressively higher as the project
progresses.

which of the following is an output in the determine budget process Answer:
project funding requirements, cost baseline, project document updates

which of the following is an input to the plan schedule management process
Answer: scope management plan

tools and techniques of the perform quantitative risk analysis process include
Answer: expert judgement, data gathering, simulations, and decision tree
analysis

what are the tools and techniques used in the close project or phase process
Answer: expert judgement, data analysis, meetings

All of the following are inputs to the identify risks process except Answer:
scope baseline

Constructive changes are Answer: Identified and documented by project
correspondence

Benchmarking involves comparing actual or planned project practices to those
of comparable projects with all of the following characteristics EXCEPT
Answer: Comparing practices only within the same application area

All of the following are external environmental factors EXCEPT Answer:
Organization values and principles

Effective team development strategies and activities are expected to increase the
team's performance, which increases the likelihood of meeting project
objectives. The evaluation of a team's effectiveness may include all of the
following indicators except Answer: Improvements in the overall project
performance as a result of increased intensity of conflict among project team
members
$13.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Metric Yale School Of Medicine
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
92
Miembro desde
1 año
Número de seguidores
5
Documentos
13109
Última venta
1 semana hace

Welcome to Metric – Your Go-To Study Resource on Stuvia! At Metric, we believe studying should be smart, efficient, and effective. That’s why we offer high-quality, exam-ready study notes, summaries, and resources designed to help you understand key concepts faster and achieve better results. Whether you're cramming for finals, revising for a quiz, or looking to deepen your understanding, Metric provides content that’s clear, structured, and aligned with real course requirements. ✨ What you’ll find at Metric: ✔️ Accurate, in-depth summaries ✔️ Easy-to-follow formats for fast revision ✔️ Notes based on real syllabus & past exams ✔️ Regularly updated content you can trust Join hundreds of students who rely on Metric to study smarter—not harder. Browse the shop, grab what you need, and level up your academic game today!ades with Expert Academic Help

Lee mas Leer menos
3.0

12 reseñas

5
3
4
1
3
2
2
5
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes