Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 7 páginas
Examen

CM 214 - LESSON 28 EXAM 4 QUESTIONS WITH 100% VERIFIED ANSWERS.

Document preview thumbnail
Vista previa 2 fuera de 7 páginas

CM 214 - LESSON 28 EXAM 4 QUESTIONS WITH 100% VERIFIED ANSWERS.

Vista previa del contenido

CM 214 - LESSON 28 EXAM 4 QUESTIONS WITH 100%
VERIFIED ANSWERS.




Which of the following defines runoff?
a. the wearing away of soil by wind or water
b. the soil that is washed from the land into water, usually after rainfall
c. the rain, snow melt, and irrigation water that appears in streams, rivers,
drains, and sewers Answer - C


What is an SWPPP?
a. a plan that describes the measures that will be taken on a site to control
stormwater pollution
b. a best management practice that controls runoff, erosion, or sediment
c. a permit that authorizes a category of stormwater discharges under the CWA
within a geographical area Answer - A


Which type of BMP is implemented to maintain a clean jobsite?
a. erosion control
b. good housekeeping measures
c. sediment control Answer - B


What's the purpose of a stabilized construction entrance?
a. to compact the sediment attached to the wheels of construction vehicles

, b. to reduce the amount of runoff leaving the jobsite
c. to minimize the amount of soil being tracked from the jobsite Answer - C


When must changes be made to the SWPPP?
a. before the NOI is posted
b. when the CGP is updated during the construction project
c. when a BMP is found to be ineffective during an inspection Answer - C


Which of the following does the site supervisor have to do after an inspection?
a. Resubmit the SWPPP.
b. Prepare an inspection report.
c. Submit a Notice of Intent. Answer - B


When is the Notice of Termination filed?
a. once construction has ceased and the area is stabilized
b. before development and construction begin
c. during the construction phase Answer - A


When can the builder stop conducting SWPPP inspections and maintenance on
the site?
a. when the SWPPP is complete and the NOI has been filed
b. after the rainy season has ended
c. when construction is complete and all areas of the site have been
permanently stabilized Answer - C


When a storm or rainfall isn't in the forecast, how does the site supervisor
know when to inspect each BMP?

Información del documento

Subido en
19 de noviembre de 2025
Número de páginas
7
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$15.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
EvaTee
3.9
(981)
Vendido
5359
Seguidores
3573
Artículos
58201
Última venta
13 horas hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes