100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

DEQ- STORMWATER MANGEMENT INSPECTOR EXAM QUESTIONS AND ANSWERS 2025

Puntuación
5.0
(1)
Vendido
3
Páginas
8
Grado
A+
Subido en
18-11-2025
Escrito en
2025/2026

DEQ- STORMWATER MANGEMENT INSPECTOR EXAM QUESTIONS AND ANSWERS 2025

Institución
DEQ- STORMWATER MANGEMENT
Grado
DEQ- STORMWATER MANGEMENT









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
DEQ- STORMWATER MANGEMENT
Grado
DEQ- STORMWATER MANGEMENT

Información del documento

Subido en
18 de noviembre de 2025
Número de páginas
8
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

DEQ- STORMWATER MANGEMENT INSPECTOR EXAM QUESTIONS AND ANSWERS 2025




What two plans in the SWPPP must be approved? - (ANSWER)Erosion and sediment control plans and
stormwater management plans must be approved.



Does the stormwater management plan address runoff during construction or after? - (ANSWER)The
stormwater management plan addresses post-construction stormwater runoff.



What impact does impervious cover have on water quality? - (ANSWER)Impervious cover increases
stormwater runoff volume and velocity, leading to higher pollutant levels like sediment and phosphorus,
negatively affecting water quality.



What is the target pollutant in the water quality criteria? - (ANSWER)Phosphorus



What is the lower limit of imperviousness that can result in stream degradation? - (ANSWER)10%



What destructive forces does the SWM regulation protect against? - (ANSWER)Channel erosion and
flooding.



How does the rate of runoff change after development? - (ANSWER)Runoff rate increases post-
development due to vegetation replacement with impervious surfaces, potentially causing erosion and
flooding.



What must a locality's ordinance require for submission and approval? - (ANSWER)ESC plan and SWM
plan (9VAC25-870-148)



List three violations for which a penalty may be imposed. - (ANSWER)Violations include: No registration
date, No SWPPP, Incomplete SWPPP, SWPPP not available for review, No approved ESC plan, Failure to
install stormwater management BMPs or ESCs, Improperly installed or maintained stormwater BMPs or
ESCs, Operational deficiencies, Failure to conduct required inspections, Incomplete, improper, or missed
inspections.



Maximum Penalty under the Stormwater Act - (ANSWER)$32,500

, DEQ- STORMWATER MANGEMENT INSPECTOR EXAM QUESTIONS AND ANSWERS 2025




Locality VSMP Authority Registration Statement Retention - (ANSWER)Must be documented and
retained for at least three years from project completion or permit termination



DEQ Program Reviews Frequency - (ANSWER)DEQ conducts a program review once every five years



Construction Site Inspection Frequency by VSMP Authority - (ANSWER)Periodically for compliance with
ESC plan, SWM plan, pollution prevention plan, and TMDL control measures



Locations for Notice of Coverage Letter Posting - (ANSWER)Near main entrance of construction activity
and in general information section of SWPPP



Options for Making SWPPP Available to Public - (ANSWER)Electronic format or hard copy upon request
at a publicly accessible location



General Information in SWPPP - (ANSWER)Includes signed registration statement, notice of coverage
letter, Construction GP, project description, and site plan



Qualified Personnel Inspection Frequency for Temporary Stabilized Areas - (ANSWER)Once per month



Timeline to Fix Improperly Installed Erosion Control Practice - (ANSWER)As soon as practicable but
within seven days of discovery or longer with VSMP authority approval



Modifications to Note in SWPPP - (ANSWER)Major grading activities, construction cessation, and
initiation of stabilization measures



When must temporary stabilization be applied to bare areas that may not be at final grade but will
remain dormant for longer than 14 days? - (ANSWER)Temporary stabilization must be applied within
seven days.
$21.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Reseñas de compradores verificados

Se muestran los comentarios
2 semanas hace

5.0

1 reseñas

5
1
4
0
3
0
2
0
1
0
Reseñas confiables sobre Stuvia

Todas las reseñas las realizan usuarios reales de Stuvia después de compras verificadas.

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Belaire Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2749
Miembro desde
1 año
Número de seguidores
0
Documentos
1355
Última venta
1 día hace

5.0

498 reseñas

5
486
4
11
3
1
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes