c c c c c c
Edition by Phil Simmons
c c c c
All Chapters Covered 1-21| Verified Questions & accurate Solutions for
c c c c c c c c cc
Exam Preparations| A+ GRADED
c c c c
1 | Page
c c c c c
,2 | Page
c c c c c
,Solution and Answer Guide
c c c
CHAPTER 1: COMMERCIAL BUILDING C C C C PLANS AND C C SPECIFICATIONS
TABLE OF CONTENTS
C C
Review .......................................................................................................................................................... 1
Note to instructor: It is recommended that students be required to respond, where appropriate, with
c c c c c c c c c c c c c c
answers that are complete sentences.
c c c c c
REVIEW
Refer to the National Electrical Code or the working drawings when necessary. Where
c c c c c c c c c c c c
applicable, responses should be written in complete sentences.
c c c c c c c c
1. What section of a commercial building’s specification contains a list of contract
c c c c c c c c c c c
documents?
c
Answer: A list of the contract documents is contained in General Clauses and
c c c c c c c c c c c c
Conditions. A listing of the Commercial Building contract documents is presented in
c c c c c c c c c c c c
this chapter under the heading ―Commercial Building Plans.‖ The instructor may wish to
c c c c c c c c c c c c c
have the students check over this listing and compare it with the plans provided.
c c c c c c c c c c c c c c
2. The requirement for temporary light and power at the job site will be found in what
c c c c c c c c c c c c c c c
portion of a commercial building’s specification?
c c c c c
Answer: The Supplementary General Conditions specifies the job site requirements for
c c c c c c c c c c
temporary light and power. In some contracts, this electrical system becomes the
c c c c c c c c c c c c
responsibility of the general contractor; in other contracts, it is the electrical contractor’s
c c c c c c c c c c c c c
responsibility to install and maintain the temporary electrical system. The instructor may
c c c c c c c c c c c c
wish to refer the student to NEC Article 590 and discuss the requirements in detail.
c c c c c c c c c c c c c c c
3 | Page
c c c c c
, 3. The electrician uses the Schedule of Working Drawings for what purpose?
c c c c c c c c c c
Answer: The electrician uses the Schedule of Working Drawings to determine whether
c c c c c c c c c c c
all of the drawings are at hand. The information on ―the other sheets‖ may be very
c c c c c c c c c c c c c c c c
important, especially in coordinating with other contractors.
c c c c c c c
4. Complete the following items by indicating the letter(s) designating the correct
c c c c c c c c c c
source(s) of information:
c c c
No. Answer Item Information
4. Sections Ceiling height c Sections, Sheet A6 c c
5. Electrical Electrical receptacle c Electrical symbol schedule, Chapter 2,
c c c c
symbol
c style
c cFigure 2–6 c
schedule
c
6. Electrical Electrical outlet c Electrical layout drawings, Sheets El,
c c c c
layout
c location
c E2, and E3
c c c
drawings
c
7. Elevations c Exterior wall finishes c c Elevations, Sheets A4 and A5 c c c c
8. Site plan c Grading elevations c Site plan, Sheet A4
c c c
9. Electrical Panelboard schedules c Electrical layout drawings, Sheet E4 c c c c
layout
c
drawings
c
10. Architectural Room width c Architectural floor plan, Sheets Al, A2, c c c c c
floor plan
c c and A3
c c
11. Architectural Swing of door c c Architectural floor plan, Sheets Al, A2, c c c c c
floor plan
c c and A3 c
12. Sections View of interior wall c c c Sections, Sheet A6 c c
Match the items on the left with those on the right by writing the letter designation of the
c c c c c c c c c c c c c c c c c
appropriate organization from the list on the right.
c c c c c c c c
13. NEC Electrical Code c National Electrical Code (NEC) c c c
14. IAEI Electrical inspectors c
International Association of Electrical c c c
Inspectors (IAEI)
c c
4 | Page
c c c c c