Analytical bridging classification - ANSWERS-gives permanent
MLC that can be posted; requires a USACE engineer; accurate; gives
high MLC; takes multiple recon trips and a deliberate recon
key players in contracting - ANSWERS-Requiring Activity/Supported
Unit
Contractor
Contract: Prime & Sub
Contracting Officer -> Contracting Officer Representative
Key Tactical Planning Terms - ANSWERS-Requirements
Determination, Requirements Development, Acquisition Review
Board (ARB):, Contract Administration:, Unauthorized commitment:,
Ratification
Inherently government functions CANNOT be contracted out -
ANSWERS-Supervision of troops
Supervision of monetary allocations and contract awarding
Road classifications - ANSWERS-Combat roads and trails
Improved roads
, Airfield seizure: - ANSWERS-executed to clear and control
designated airstrip; purpose can be to allow follow-on airland forces
to conduct transload operations or to establish a lodgment in order to
continue combat operations from that location
Airfield Clearance: - ANSWERS-if engineers are to accompany the
assault force; special consideration must be given to the type and
quantity of obstacles on the runway; bulldozers and mine detectors
can be dropped in the initial assault
TASKORG - ANSWERS-Airfield assessment team: assess damage
and repair requirements and provide recommendations to the
commander on use of undamaged portions
Runway clearance element: removing obstacles and demolitions from
the runways in preparation for airland sorties and repair teams
Light airfield repair team: repairs light damage to an airstrip due to
bombing or erosion and sustains extensive airland operations
Minimum Operating Strip (MOS): - ANSWERS-smallest amount of
area that must be repaired to launch and recover aircraft. Selection
depends on mission requirements, taxi access, resources available,
and estimated time to repair.
Project Components: - ANSWERS-Time, Money, Scope