100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

APM PMQ ACTUAL EXAM SCRIPT 2026 COMPLETE QUESTIONS AND ACCURATE ANSWERS

Puntuación
-
Vendido
-
Páginas
47
Grado
A+
Subido en
16-11-2025
Escrito en
2025/2026

APM PMQ ACTUAL EXAM SCRIPT 2026 COMPLETE QUESTIONS AND ACCURATE ANSWERS

Institución
APM PMQ
Grado
APM PMQ











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
APM PMQ
Grado
APM PMQ

Información del documento

Subido en
16 de noviembre de 2025
Número de páginas
47
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

APM PMQ ACTUAL EXAM SCRIPT 2026
QUESTIONS AND ANSWERS 100% CORRECT

⩥ When is an iterative life cycle beneficial? Answer: If the project scope
is vague, or if the solutions are unclear


⩥ What are the three stages of Evolutionary Development in an Iterative
lifecycle? Answer: Assemble, Review, Deploy


⩥ What is the definition of a hybrid life cycle? Answer: It adds iteration
to a linear life cycle to enable a mix of approaches


⩥ Give one difference between a Project Life Cycle and an Extended
Life Cycle? Answer: A project life cycle contains the phases up to
transition and closure, whereas an extended life cycle goes beyond the
transition and closure phase to include the benefits realisation phase and
adoption of outputs.


⩥ What are the two extra phases of an Extended life cycle? Answer:
Adoption, Benefits Realisation


⩥ What are the different Documentation Requirements for a Project
lifecycle vs. an Extended lifecycle? Answer: A project lifecycle focuses

,on documentation required for project execution and closure, such as
project plans, progress reports, and final reviews.
An extended lifecycle requires comprehensive documentation that
extends into operational manuals, long-term maintenance schedules, and
end user support materials.


⩥ How are Changes Managed for a Project lifecycle vs. an Extended
lifecycle? Answer: Project Lifecycle - Changes are managed within the
confines of the project's timeline and aim to minimise disruptions to the
initial plan.
Extended lifecycle - Incorporates continuous change management to
adapt to evolving technologies, user requirements, and operational
challenges over time.


⩥ How is Quality Assurance carried out in Project lifecycle vs. Extended
Lifecycle? Answer: Project lifecycle - Quality assurance processes are
designed to ensure that the project meets defined standards and
specifications at closure.
Extended lifecycle - Ongoing quality assurance is crucial to maintain the
integrity, performance, and safety of the project outcomes throughout
their lifecycle.


⩥ How are Resources Allocated in a Project lifecycle vs. an Extended
lifecycle? Answer: Project lifecycle - Resources are allocated and
managed with the goal of project completion, and resource engagement
typically concludes with the project

,Extended lifecycle - Resource allocation is dynamic and may increase or
decrease based on the phase of the lifecycle, such as during major
upgrades or routine maintenance.


⩥ How do skills and expertise differ across a Project lifecycle vs. an
Extended Lifecycle? Answer: Project lifecycle - Requires skills relevant
to project management and technical execution specific to the project's
requirements.
Extended lifecycle - Demands a broader range of skills, including
operational management, technical support, and lifecycle management
expertise.


⩥ How do Feedback Mechanisms differ in a Project Lifecycle vs an
Extended Lifecycle? Answer: Project lifecycle - Feedback is often
project-focused and gathered during the project to refine processes and
outputs.
Extended lifecycle - Continuous feedback loops are essential for
adapting to user experiences, technological advancements, and market
changes


⩥ How do Sustainability Considerations differ in a Project Lifecycle vs
an Extended Lifecycle? Answer: Project lifecycle - Sustainability may
be considered in terms of project deliverables and immediate
environmental impacts.
Extended lifecycle - Includes long-term sustainability planning, focusing
on environmental impact, resource use, and economic viability over the
entire lifecycle.

, ⩥ How is Legal and Compliance handled in a Project lifecycle vs.
Extended lifecycle? Answer: Project lifecycle - Compliance is targeted
at meeting the legal requirements up to the project's delivery
Extended lifecycle - Extends compliance to include regulatory
requirements that affect the ongoing use, updates, and eventual
decommissioning of the project deliverables


⩥ Why might an organisation favour a linear project lifecycle? (5
reasons) Answer: Where a highly structured, predictable and stable
process is needed which offers transparency and maximum control and
governance.
Where there is availability of relatively perfect knowledge upfront.
Which might be resistant to change and inflexible in terms of corrections
and rework.
Where knowledge / teams are divided into distinct phases, creating silos
and knowledge barriers between the phases, particularly when different
delivery agents will deliver different phases.
Lower appetite for risk


⩥ Why might an organisation favour an iterative lifecycle? (5) Answer:
Where development projects are agile.
Where departments are flexible, adaptable and open to change.
$11.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
BOARDWALK Havard School
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
170
Miembro desde
1 año
Número de seguidores
6
Documentos
18402
Última venta
9 horas hace
BOARDWALK ACADEMY

Ace Your Exams With Top Quality study Notes And Paper✅✅ ALL ACADEMIC MATERIALS AVAILABLE WITH US✅✅ LEAVE A REVIEW SO THAT WE CAN LOOK AND IMPROVE OUR MATERIALS.✅✅ WE ARE ALWAYS ONLINE AND AVAILABLE DONT HESITATE TO CONTACT US FOR SYUDY GUIDES!!✅✅ EVERYTHING IS GRADED A+✅✅ COLOUR YOUR GRADES WITH US , WE ARE HERE TO HELP YOU DONT BE RELACTANT TO REACH US

3.6

31 reseñas

5
12
4
6
3
7
2
0
1
6

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes