100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

MN Boiler License Test Bank. Latest Edition . Questions & Correct Answers. Graded A

Puntuación
-
Vendido
-
Páginas
66
Grado
A
Subido en
15-11-2025
Escrito en
2025/2026

The MN Boiler License Test Bank (Latest Edition 2025–2026) provides a thoroughly updated collection of practice questions with verified correct answers to support strong exam preparation. Designed for clarity and aligned with Minnesota licensing standards, this resource deepens understanding of boiler operations, safety principles, and regulatory requirements. Graded A for accuracy and reliability, it builds confidence, enhances problem-solving skills, and equips you with the essential knowledge needed to succeed on the Minnesota Boiler License examination.

Mostrar más Leer menos
Institución
MN Boiler License
Grado
MN Boiler License











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
MN Boiler License
Grado
MN Boiler License

Información del documento

Subido en
15 de noviembre de 2025
Número de páginas
66
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

MN Boiler License Test Bank. Latest
Edition 2025-2026. Questions &
Correct Answers. Graded A

"Operating experience" according to MN State statutes includes includes
which of the following?
a) Boiler Operation
b) Maintenance
c) Training
d) Observation
e) Personal Participation - ANSall
a) Boiler Operation
b) Maintenance
c) Training
d) Observation
e) Personal Participation


(ASME) developed the 'Boiler and Pressure Vessel Code' which forms the
basis for laws in the US and Internationally in what year?
a) 1880
b) 1920
c) 1914 - ANSc) 1914


(ASME) stand for what?
a) American Standards for Mechanical Electricians


1

,b) American Society of Mechanical Engineers
c) Allied Sciences and Mechanics Emeritus - ANSb) American Society of
Mechanical Engineers


founded in 1880


2.3 feet of water or 27 inches equals 1 pound per square inch of pressure?
a) yes
b) no
c) only if the water temperature is above 212 degrees Fahrenheit
d) none of the answers given - ANSa) yes
2.3 x .433 = .9959 ~ 1
0.433 pounds per square inch of pressure.


a bearing is said to be brass bound when:
a) it is made of brass
b) it is held together with a brass ring
c) the babbit is all worn out
d) brass bolts are used - ANSc) the babbit is all worn out


a boiler with more than 500 square feet of heating surface must have:
a) one safety valve
b) two or more safety valves
c) three safety valves
d) four safety valves - ANSb) two or more safety valves


A BTU is the amount of energy needed to heat _____ of water _____?

2

,a) ounce, 1 F
b) pound, 1 F
c) kilogram, 1 C - ANSB pound 1 F


A chief class operating license is required to take charge of a boiler plant
over what horsepower?
a) 50 bhp
b) 500 bhp
c) 300 bhp - ANSc) 300 bhp
must be in attendance 4 hrs a day for 5 days a week except for sick and
vacation time or holidays.


a company is monitoring boilers by remote electronic surveillance. Do they
need a licensed engineer for monitoring?
a) only on high-pressure boilers
b) yes
c) no, see section 13, 183. 501 - ANSc) no, see section 13, 183. 501


a compound engine uses the same steam:
a) 1x
b) 2x
c) 3x
d) 4x - ANSb) 2x


a device that controls the stopping and starting of the burner on a hot water
boiler is a/n?
a) pressure trol

3

, b) aqua-stat
c) low water cut out
d) sail switch - ANSb) aqua-stat


a first class grade B engineer could take charge of and be responsible for
the safe operation and maintenance of boilers of not more than how many
bhp?
a) 200 bhp
b) 500 bhp
c) unlimited bhp - ANSb) 500 bhp


a first-class engineer may take charge of a boiler plant not to exceed:
a) 150 horsepower
b) 600 horsepower
c) 500 horsepower - ANSc) 500 horsepower


a good percentage of carbon dioxide when burning oil is:
a) 12%
b) 8 %
c) 10% - ANSa) 12%


a high pressure boiler plant of 30 or less bhp must be attended (checked)
to?
a) daily
b) 4 hours a day
c) cannot be left unattended over consecutive 2 hrs - ANSa) daily


4
$15.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
wilfredmburuUS

Conoce al vendedor

Seller avatar
wilfredmburuUS Johns Hopkins University School Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
4
Miembro desde
1 año
Número de seguidores
0
Documentos
964
Última venta
1 mes hace
Grade A+ Assignments, Exams, Quizzes, and Homework

EXCELLENT ASSIGNMENT AND EXERCISES HELP & TUTORING, ALL KINDS OF QUIZS & EXAMS WITH A GUARANTEED GRADE A. I am an expert on major courses especially; Human Resource Management, Criminal Justice, Criminology, Nursing, Sociology, Data Science, Environmental Science, Management Leadership and Forensics ensuring quality work delivery. I maintain scholarly standards in all my work, ensuring students get the best from me. I assure you a GOOD GRADE if you will use my work.

Lee mas Leer menos
0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes