100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

BADM 3601 OPERATIONS MANAGEMENT FINAL EXAM QUESTIONS WITH CORRECT ANSWERS

Puntuación
-
Vendido
-
Páginas
13
Grado
A+
Subido en
14-11-2025
Escrito en
2025/2026

BADM 3601 OPERATIONS MANAGEMENT FINAL EXAM QUESTIONS WITH CORRECT ANSWERS

Institución
BADM
Grado
BADM









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
BADM
Grado
BADM

Información del documento

Subido en
14 de noviembre de 2025
Número de páginas
13
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

BADM 3601 OPERATIONS
MANAGEMENT FINAL EXAM

False, Project - Correct Answers -True or False:
A program is an interrelated set of activities with a definite starting and ending point,
which results in a unique outcome for a specific allocation of resources.

complete the project on time or earlier, do not exceed the budget, meet the
specifications - Correct Answers -What are the 3 main goals of a project?

project management - Correct Answers -a systemized, phased approach to defining,
organizing, planning, monitoring, and controlling projects

False, they do - Correct Answers -True or False:
Projects don't cut across organizational lines because they need the skills of multiple
professions and organizations.

temporary because personnel, materials, and facilities are organized to complete them
within a specified time frame. - Correct Answers -Are projects temporary or permanent?
Why?

uncertainties - Correct Answers -What can change the character of projects and require
responsive countermeasures?

program - Correct Answers -an interdependent set of projects that have a common
strategic purpose

Work Breakdown Structure (WBS) - Correct Answers -a statement of all work that has
to be completed

the omission of work that is germane to the successful completion of the project -
Correct Answers -What is the single most important contributor to delay?

activity - Correct Answers -the smallest unit of work effort consuming both time and
resources that the project manager can schedule and control

Define the WBS, draw the network, develop the schedule, analyze cost time trade offs,
assess the risks - Correct Answers -What are the 5 steps of planning projects?
cumulative sum of forecast errors (CFE) - Correct Answers -a measurement of the total
forecast error that assesses the bias in a forecast

, mean squared error (MSE) - Correct Answers -a measurement of the dispersion of
forecast errors

low, the forecast is typically close to the actual demand - Correct Answers -When
comparing MSE or MAD should you pick a high or low number and why?

activity ownership - Correct Answers -What should each activity in the WBS have in
order to avoid confusion in the execution of activities?

monitor and control projects - Correct Answers -What can network planning methods
help managers with?

network diagram - Correct Answers -a network planning method, designed to depict the
relationships between activities, that consists of nodes (circles) and arcs (arrows)

critical path method (CPM) - Correct Answers -a network planning method developed in
the 1950s as a means of scheduling maintenance shutdowns at chemical-processing
plants

precedence relationship - Correct Answers -a relationship that determines a sequence
for undertaking activities; it specifies that one activity cannot start until a preceding
activity has been completed

False, large projects - Correct Answers -True or False:
For small projects, establishing precedence relationships is essential because incorrect
or omitted precedence relationships will result in costly delays.

probability distributions - Correct Answers -If the estimates of activity times involve a
high degree of uncertainty what should you use?

activity on node network (AON) - Correct Answers -an approach used to create a
network diagram, in which nodes represent activities and arcs represent the precedence
relationships between them

start - Correct Answers -In cases of multiple activities with no predecessors, it is usual
to show them emanating from a common node. What is that common node called?

path - Correct Answers -the sequence of activities between a project's start and finish

critical path - Correct Answers -the sequence of activities that determine the earliest
date by which the project can be completed

completion time, delayed - Correct Answers -The activities along the critical path
determine the _________ of the project. That is, if one of the activities on the critical
path is delayed, the entire project will be ______.
$13.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
millyphilip West Virginia University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2838
Miembro desde
3 año
Número de seguidores
1957
Documentos
42007
Última venta
2 horas hace
white orchid store

EXCELLENCY IN ACCADEMIC MATERIALS ie exams, study guides, testbanks ,case, case study etc

3.7

540 reseñas

5
234
4
86
3
103
2
31
1
86

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes