Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 6 páginas
Examen

FDOT FINAL ESTIMATES - LEVEL 1 EXAM QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) ||ALREADY GRADED A+||NEWEST VERSION

Document preview thumbnail
Vista previa 2 fuera de 6 páginas

FDOT FINAL ESTIMATES - LEVEL 1 EXAM QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) ||ALREADY GRADED A+||NEWEST VERSION

Vista previa del contenido

FDOT FINAL ESTIMATES - LEVEL 1
EXAM QUESTIONS AND CORRECT
DETAILED ANSWERS (VERIFIED
ANSWERS) ||ALREADY GRADED
A+||NEWEST VERSION




QUESTIONS AND ANSWERS
What two types of Estimates are needed to pay for the work performed by contractors?
ANSWER -Final & Progress Monthly


In case of discrepancies among the contract documents, which document takes the highest
precedence? ANSWER -Special Provisions


Contractors Recieve progress payments on the basis of? ANSWER -Monthly Progress
Estimates


Which of the following sets forth the Department's methods and procedures for preparing
and checking final estimates? ANSWER -Preparation and Documentation Manual (PDM)

, Which Document contains a series of Specially designed forms that show both original
estimates of quantities and the final quantities as measured ad accepted? ANSWER -
Computation Books


Which Document contains alignment notes, cross-section notes, linear and area
measurements and dimension sketches? ANSWER -Field Notebooks


Where are major changes during construction documented and "as-built" conditions
shown? ANSWER -Field Notebooks


What identification is needed to show on the front cover of a field book? ANSWER -FEID,
Contract number, General contents of the book


When making corrections to a field book entry, you should: ANSWER -strike through,
initial and enter correct data and date


What should be started on the first lined page (page 1) of a field book? ANSWER -INDEX


An entire page of a field notebook you are using is incorrect, what do you do to correct the
situation? ANSWER -Mark the page VOID and reference it to a new page showing the
correct information.


"Check Levels" must be run at the start of a construction project to assure that: ANSWER -
Construction will be done to design elevations & final measurements for payment will be
from the same base elevations as the original survey.


What should accompany final measurements so that nonstandard measurements may be
interpreted accurately? ANSWER -Sketches


In the REMARKS column of most computation book forms a reference should be made to
the: ANSWER -Source Documents


When is it permissible to record only the net weight on an asphaltic concrete tabulation
form? ANSWER -Never, gross tare must be included also

Información del documento

Subido en
13 de noviembre de 2025
Número de páginas
6
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$13.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
8
Seguidores
0
Artículos
1088
Última venta
1 mes hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes