Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

ISYE 6644 PRACTICE EXAM QUESTIONS WITH CORRECT DETAILED ANSWERS | ALREADY GRADED A+RECENT VERSION

Puntuación
-
Vendido
-
Páginas
60
Grado
A+
Subido en
13-11-2025
Escrito en
2025/2026

ISYE 6644 PRACTICE EXAM QUESTIONS WITH CORRECT DETAILED ANSWERS | ALREADY GRADED A+RECENT VERSION 1. What does separate do - ANSWER Duplicates a single entity or split multiple entities that have been combined in a Batch module. If dealing with a permanent batch, usually use duplicate original to get several customers all with the same attributes. If temp batch, use split to get original attributes 2. Record Module - ANSWER Collect statistics when an entity passes through the module 3. What options do you get in the replications tab - ANSWER Number of reps Initialize between reps Warm-up period Rep length Terminating Condition 4. What sort of options/tab can you change in run setup? - ANSWER Replications, run speed, reports, run control 5. What are fake customers? - ANSWER Used to accomplish various tasks during a sim e.g. calculate normal probabilities, keep track of time period, trigger breakdown 6. Why use Seize, Delay, and Release modules in the Advance Process Template? - ANSWER Sometimes you need to do things that are too complicated for the Process module version of S-D-R e.g. Seize-Assign-Delay-Release, Seize and Releases that depend on sets of servers 7. What is a good way to model failures in Arena - ANSWER Use Resource and Failure spreadsheets in conjunction with each other (Failures column in Resource s/s - Failure s/s) 8. What are the types of failures you can model in Arena? - ANSWER Count (failure after certain $ of arrivals) and Time (after a certain amount of time) 9. What are the types of failures rules? - ANSWER Ignore (complete service of current customer and reduce repair time) 10. What is process interaction? - ANSWER Consider a generic customer (entity) and the sequence of events and activities (processes) it undergoes as it moves through the system. At any time the system may have many entities interacting with each other as they compete for resources. 11. What is the template panel in Arena? - ANSWER Where you get your "stuff" i.e. blocks, processes. 12. Which options in the toolbar help with various visualization aids? - ANSWER Arrange, Object, Window 13. What does the Tools option in the toolbar have? - ANSWER Lots of cool toys, including Input Analyzer, opt Quest, AVI capture, macros, etc 14. What are some "blocks"/modules in the top half of the Basic Process Template? - ANSWER Create, Process, Dispose, Decide, Batch, Separate, Assign, Record 15. How do you add more advanced templates in Arena? - ANSWER File Template Panel Attach 16. What items are available in the bottom half of the Basic Process panel? What do they do? - ANSWER Attribute, Entity, Queue, Resource, Variable, Schedule, Set They are spreadsheets that are both informational and allow us to change certain system parameters e.g. the Variable s/s defines global quantities such as WIP 17. Briefly explain the Create-Process-Dispose trio - ANSWER Create: Periodically generate customer arrivals Process: Have work performed on the customers; maybe have to wait in line Dispose: Customers leave the system after service 18. What fields are in the Create module? - ANSWER Name, Entity (Customer) Type, Time Between Arrivals, Entities per Arrival, Max Arrivals, First Creation 19. What fields are in the Process Module? - ANSWER Name, Type, Logic, Delay Type 20. What actions can you take in the Process module and what options can you set within these actions? - ANSWER Delay Seize-Delay-Release Seize-Delay Delay-Release You can set how many resources (workers) to Seize or Release 21. What is the Resource spreadsheet? - ANSWER A spreadsheet with a list of resources that the model is using. Can set capacity, which is the number of resource on duty. A resource is regarded as identical and interchangeable. Can create a new resource in the process module or the resource spreadsheet. 22. What is the Schedule spreadsheet? - ANSWER Can set schedules for servers. Enter schedule into duration box. Can also set schedule for arrivals e.g. in Create change Time Between Arrivals to schedule. 23. What can an entity do at a Decide module? - ANSWER 2-way by Chance N-way by Chance 2-way by Condition N-way by Condition 24. What are attributes? - ANSWER Each customer passing through the system has various properties (attributes). 25. What are variables? - ANSWER Unlike attributes, whose values are specific to each customer, variables are global. If changed, it gets changed everywhere e.g. WIP 26. What can you do with an Assign module? - ANSWER You can change attributes and variables e.g. entity pictures 27. What is the Attribute Spreadsheet? - ANSWER Keeps track of existing attributes that you might define in an Assign module 28. What is the Variable Spreadsheet? - ANSWER Pretty much the same as Attribute spreadsheet 29. What is the Entity spreadsheet? - ANSWER Allows you to set initial picture 30. What are internal variables - ANSWER Arena keeps track of and continuously updates lots of stuff as the simulation runs Examples: TNOW (current sim time) NR(Barber) - # of resource Barber's servers now working NQ(Process 1.Queue) = # of customers in that queue Create 1.NumberOut = # of customers who have so far left the module Create 1 31. What kinds of display information can you display while a simulation is running? - ANSWER Clock, calendar, variable displays, histograms, graphs 32. What are Blocks template? - ANSWER They're sort of a self-contained language related to SIMAN, very specialized and low-level. Mainly used because certain blocks can only connect with these blocks (e.g. Queue - Seize) 33. What does an alter block do? - ANSWER Change the number of servers in a resource 34. What is the Set s/s used for? - ANSWER To create a set of distinct servers, with different schedules, service speeds, service specialties, etc 35. What is one issue you can come across with resource sets? - ANSWER When using Seize-Delay-Release, must makes sure you release the same server that you originally seized. 36. How do you access SMART demos - ANSWER Libraries Documents Rockwell Software Arena 37. What are some important Transfer Panel Modules and what do they do - ANSWER Station - Somewhere you can go Route - Tells you where you're going. Similar to Connect except it takes time Enter - General way to get into a Station Leave - General way to depart a Station 38. What is a Sequence s/s used for - ANSWER Allows each type of customer to follow a different path through the system (station to station)

Mostrar más Leer menos
Institución
ISyE 6644
Grado
ISyE 6644

Vista previa del contenido

ISYE 6644
PRACTICE EXAM QUESTIONS
WITH CORRECT DETAILED
ANSWERS | ALREADY GRADED
A+<RECENT VERSION>

1. What does separate do - ANSWER Duplicates a single entity or split multiple
entities that have been combined in a Batch module. If dealing with a permanent
batch, usually use duplicate original to get several customers all with the same
attributes. If temp batch, use split to get original attributes



2. Record Module - ANSWER Collect statistics when an entity passes through the
module



3. What options do you get in the replications tab - ANSWER Number of reps
Initialize between reps
Warm-up period
Rep length
Terminating Condition



4. What sort of options/tab can you change in run setup? - ANSWER Replications,
run speed, reports, run control



5. What are fake customers? - ANSWER Used to accomplish various tasks during a
sim e.g. calculate normal probabilities, keep track of time period, trigger breakdown

,6. Why use Seize, Delay, and Release modules in the Advance Process Template? -
ANSWER Sometimes you need to do things that are too complicated for the
Process module version of S-D-R e.g. Seize-Assign-Delay-Release, Seize and
Releases that depend on sets of servers



7. What is a good way to model failures in Arena - ANSWER Use Resource and
Failure spreadsheets in conjunction with each other (Failures column in Resource s/s -
> Failure s/s)



8. What are the types of failures you can model in Arena? - ANSWER Count (failure
after certain $ of arrivals) and Time (after a certain amount of time)



9. What are the types of failures rules? - ANSWER Ignore (complete service of
current customer and reduce repair time)



10. What is process interaction? - ANSWER Consider a generic customer (entity) and
the sequence of events and activities (processes) it undergoes as it moves through the
system. At any time the system may have many entities interacting with each other as
they compete for resources.



11. What is the template panel in Arena? - ANSWER Where you get your "stuff" i.e.
blocks, processes.



12. Which options in the toolbar help with various visualization aids? - ANSWER
Arrange, Object, Window



13. What does the Tools option in the toolbar have? - ANSWER Lots of cool toys,
including Input Analyzer, opt Quest, AVI capture, macros, etc



14. What are some "blocks"/modules in the top half of the Basic Process Template? -
ANSWER Create, Process, Dispose, Decide, Batch, Separate, Assign, Record

,15. How do you add more advanced templates in Arena? - ANSWER File > Template
Panel > Attach



16. What items are available in the bottom half of the Basic Process panel? What do they
do? - ANSWER Attribute, Entity, Queue, Resource, Variable, Schedule, Set



They are spreadsheets that are both informational and allow us to change certain
system parameters e.g. the Variable s/s defines global quantities such as WIP



17. Briefly explain the Create-Process-Dispose trio - ANSWER Create: Periodically
generate customer arrivals
Process: Have work performed on the customers; maybe have to wait in line
Dispose: Customers leave the system after service



18. What fields are in the Create module? - ANSWER Name, Entity (Customer) Type,
Time Between Arrivals, Entities per Arrival, Max Arrivals, First Creation



19. What fields are in the Process Module? - ANSWER Name, Type, Logic, Delay
Type



20. What actions can you take in the Process module and what options can you set within
these actions? - ANSWER Delay
Seize-Delay-Release
Seize-Delay
Delay-Release



You can set how many resources (workers) to Seize or Release



21. What is the Resource spreadsheet? - ANSWER A spreadsheet with a list of
resources that the model is using. Can set capacity, which is the number of resource
on duty. A resource is regarded as identical and interchangeable. Can create a new
resource in the process module or the resource spreadsheet.

, 22. What is the Schedule spreadsheet? - ANSWER Can set schedules for servers.
Enter schedule into duration box. Can also set schedule for arrivals e.g. in Create
change Time Between Arrivals to schedule.



23. What can an entity do at a Decide module? - ANSWER 2-way by Chance
N-way by Chance
2-way by Condition
N-way by Condition



24. What are attributes? - ANSWER Each customer passing through the system has
various properties (attributes).



25. What are variables? - ANSWER Unlike attributes, whose values are specific to
each customer, variables are global. If changed, it gets changed everywhere e.g. WIP



26. What can you do with an Assign module? - ANSWER You can change attributes
and variables e.g. entity pictures



27. What is the Attribute Spreadsheet? - ANSWER Keeps track of existing attributes
that you might define in an Assign module



28. What is the Variable Spreadsheet? - ANSWER Pretty much the same as Attribute
spreadsheet



29. What is the Entity spreadsheet? - ANSWER Allows you to set initial picture



30. What are internal variables - ANSWER Arena keeps track of and continuously
updates lots of stuff as the simulation runs



Examples:

Escuela, estudio y materia

Institución
ISyE 6644
Grado
ISyE 6644

Información del documento

Subido en
13 de noviembre de 2025
Número de páginas
60
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$13.49
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
jervismuthami Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
10
Miembro desde
1 año
Número de seguidores
0
Documentos
573
Última venta
2 meses hace

4.5

2 reseñas

5
1
4
1
3
0
2
0
1
0

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes