100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

Bicsi Technician EXAM WITH COMPLETE 200 QUESTIONS AND SOLUTIONS LATEST UPDATE JUST RELEASED THIS YEAR

Puntuación
-
Vendido
-
Páginas
33
Grado
A+
Subido en
12-11-2025
Escrito en
2025/2026

Bicsi Technician EXAM WITH COMPLETE 200 QUESTIONS AND SOLUTIONS LATEST UPDATE JUST RELEASED THIS YEAR

Institución
Bicsi Technician
Grado
Bicsi Technician











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Bicsi Technician
Grado
Bicsi Technician

Información del documento

Subido en
12 de noviembre de 2025
Número de páginas
33
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Page 1 of 33




Bicsi Technician EXAM WITH COMPLETE 200
QUESTIONS AND SOLUTIONS LATEST UPDATE JUST
RELEASED THIS YEAR

A graphical representation of the electrical components of a construction project (e.g., power
distribution, lighting).

E Drawing

Abbreviation for fire protection drawings

FP Drawing

Abbreviation for mechanical drawings.

M Drawing

Abbreviation for plumbing drawings

P Drawing

Abbreviation for structural drawings

S Drawing

This document covers the requirements for the ICT systems team and lists all of the elements
of the installation.

Scope of Work (SOW)

Abbreviation for telecommunications, security, and audiovisual drawings

T Drawing

, Page 2 of 33


Layer of a telecommunication drawing that contains campus or site information such as
exterior pathways and interbuilding systems

T0 Layer

Project schedules should be updated at least ______________ once the project has started,

Weekly

The size and route of sanitary sewer lines are indicated in the
________ drawings.

P Drawing

Which of the following documents is used to track daily activities at the work site?

Project Log

Which of the following is submitted to request clarification, supplemental information, or
approval of material substitutions?

RFI Form

M drawings indicate the size and route of:

Air Handler Units, Chilled Water Piping, Refrigerant Piping, HVAC System Ducts

Which of the following testers should be used for optical fiber identification?

Visual Fault Locator (VFL)

What is the first step that you should take to verify the existing infrastructure before you
begin a retrofit?

Review the existing documentation with the customer.

, Page 3 of 33


A graphical representation of a building space, or object prepared with adequate detail to
convey design information in a manner to serve as a guide for construction.

A Drawing

Layer of a telecommunication drawing that contains building information.

T1 Layer

Layer of a telecommunication drawing that contains serving zone information

T2 Layer

Layer of a telecommunication drawing that contains information about telecommunications
rooms.

T3 Layer

Layer of a telecommunication drawing that contains the detail drawings.

T4 Layer

Layer of a telecommunication drawing that contains schedules and spreadsheets.

T5 Layer

A list of the quantity and specific types of materials to be used on a project. This list also
should consider miscellaneous hardware.

BOM

Abbreviation for operations and maintenance

O&M

Any number of safety apparatuses worn or used by an individual (e.g., hard hat, protective
eyewear, gloves, clothing) that shield against possible injury while performing tasks.

, Page 4 of 33


PPE

A document that provides detailed statements and descriptions of the work content for the
project requirements.

SOW

What are the three basic locations for storing materials?

Company-controlled location, At the work site, With the distributor

True or False: After completing the site survey and formulating a project implementation plan,
the designated ICT systems installation PM should hold an initial meeting with the entire ICT
systems installation team.

True

Which meeting should be held after the initial meeting and should include the cabling
installation team and appropriate contractors?

Pre-Installation Meeting

The progress meeting should only occur once a month

False

What describes the manpower and mobilization in terms of responsibility, skill level,
certification level and head count?

Project Plan

The building official, electrical inspector, fire marshal, or other individuals or entities
responsible for interpretation and enforcement of local building and electrical codes.

Authority Having Jurisdiction (AHJ)
$17.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
ressyshii Chamberlain College Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
49
Miembro desde
1 año
Número de seguidores
7
Documentos
2097
Última venta
14 horas hace

3.6

10 reseñas

5
5
4
0
3
2
2
2
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes