100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

CFM 415 FINAL EXAM QUESTIONS & ANSWERS

Puntuación
-
Vendido
-
Páginas
11
Grado
A+
Subido en
12-11-2025
Escrito en
2025/2026

CFM 415 FINAL EXAM QUESTIONS & ANSWERS

Institución
CFM 415
Grado
CFM 415









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
CFM 415
Grado
CFM 415

Información del documento

Subido en
12 de noviembre de 2025
Número de páginas
11
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

CFM 415 FINAL EXAM QUESTIONS & ANSWERS

A unique one time activity with tasks and a fixed duration - answer -project

A system that provides for the planning, organizing, directing, and controlling of a
unique one-time activity so to complete it on-time, on-budget, safely, and to a specified
quality with no claims - answer -project management

Planning, organizing, directing, controlling - answer -podc

Make money - answer -number one goal

Time - answer -schedule

Material, budget, equipment, people - answer -resources

What has to get done and quality - answer -scope

Scope (quality), resources, schedule - answer -triangle

It depends - answer -what is the most important part of the triangle?

Scope - answer -what do you plan first?

Holds people accountable and creates change - answer -confrontation

Has anger behind it - answer -contention

Preconstruction meeting - answer -most important meeting

Agenda, notes, timely, accountability for old assignments, and new assignments given -
answer -what is included in a good meeting?

Because they were an experience - answer -why do you remember things?

To prove decisions for legal issues, who was there, action items, control over what gets
documented - answer -why use meeting minutes?

Date and time, who was there, assignments, new business, old or outstanding items,
change order status, safety concerns, and progress - answer -what should be included
in meeting minutes?

As early as possible - answer -when should a project manager get involved?

, Gather information and study (existing conditions, estimate, budget, schedule, and
addendas) - answer -what is the first thing you do once you win a project?

Changes to project or scope before contract is created - answer -addenda

A piece of the scope not covered by any subcontractor - answer -scope gap

A project delivery method in which the owner holds two separate contracts for design
and construction. This method is often referred to as the traditional project delivery
method. Drives the price down for the owner but risks low quality or failure - answer -
design-bid-build

A project delivery method in which there is only one contract between the owner and a
design-build entity. The design-builder is responsible for both the design and the
construction of the project. Allows construction to start before design is finished -
answer -design-build

A contract where payment is for material and labor, with a profit factor added.
Eliminates risk and guarantees profit for general contractor - answer -cost-plus

A contract where the contractor is involved early to help determine price and has to
explain why owner should choose them. A gmp is set - answer -cm @ risk

A delivery method where the cm acts as the owners representative and has no risk -
answer -cm agency

Guaranteed maximum price - answer -gmp

Reputation is your overall quality or character; be an involved, active project manager -
answer -john h. Wright main points

Integrated project deliver is a new approach to project delivery where the entire project
team works together on the project to increase the coordination and collaboration

The contractual relationships in an ipd method are shared among the owner, architect,
consultants, and contractor who jointly share in the success or failure of the project

Good for a fast schedule - answer -ipd

Public-private partnership is a way to collect funding that owner will pay back with
interest - answer -ppp

Owner, architect, contractor, and other players. When the least of us is threatened we
are all at risk - answer -project team
$12.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GEEKA YALA UNIVERSITY
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2003
Miembro desde
3 año
Número de seguidores
1446
Documentos
47644
Última venta
1 semana hace

3.8

342 reseñas

5
170
4
61
3
44
2
16
1
51

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes