Verified Answers |Actual Complete Exam| Already Graded
A+ during which
1. Market research is conducted
b. All phases of the
phase of acquisition?
acqui- sition
a. When requirements are being developed
b. All phases of the acquisition
c.After award to ensure that a contractor's
product or service is sufficient
d. During negotiations to ensure that a
contractor's proposal is fair and reasonable
2. What is the use of a procedure that is inconsistent with c. Deviation
the FAR?
a. Extraordinary action
b. Exception
c. Deviation
d. Abnormal action
3. Simplified Acquisition Procedures (SAP) a. Promote
should: competition to the
maximum extent prac-
a. Promote competition to the maximum extent prac- ticable
ticable
b. Consider all quotations or offers, regardless
of the time they are received, if they are the
most reason- able
c. Promote the use of current vendors for time-
saving purposes
d. Equally consider all businesses, large or small
4. What is the tool (form) used by DoD to apply a a. DD Form
struc- tured profit/fee? 1202,
Guideline
1/
94
, CON 3910 Practice Exam with all Correct & 100%
Verified Answers |Actual Complete Exam| Already Graded
s for Profit Method A+ c. DD Form 1547,
Weight- ed
Guidelines Method
2/
94
, CON 3910 Practice Exam with all Correct & 100%
Verified Answers |Actual Complete Exam| Already Graded
A+Analogy Method
b. DD Form 1701, Structured
c. DD Form 1547, Weighted Guidelines Method
d. DD Form 1861, Weighted Profit Analogy
5. What type(s) of contracts can be awarded a. Only firm-
when ac- quiring commercial items of fixed-price contracts
supply? or fixed-price
contracts with
a. Only firm-fixed-price contracts or fixed-price
economic price
con- tracts with economic price adjustment
adjustment
b. Any contract type that does not have an
incentive
c. Any fixed-price contract type
d. Any type or combination of types as
determined necessary by the contracting
officer
d. Only firm-
6. When using invitations for bids (IFBs), what fixed-price contracts
type(s) of contracts can be awarded? or fixed-price
contracts with
a. Any contract type that does not have an
incentive economic price
adjustment
b. Any fixed-price contract type
c. Any type or combination of types as
determined necessary by the contracting
officer
d. Only firm-fixed-price contracts or fixed-price
con- tracts with economic price adjustment
7. Which of the following is correct regarding the DFARS b. The DFARS
PGI is a com-
Procedures Guidelines and Information
(PGI)? a. There is no
such thing as
3/
94
, CON 3910 Practice Exam with all Correct & 100%
Verified Answers |Actual Complete Exam| Already Graded
a DFARS PGI A+ panion resource to
b. The DFARS PGI is a companion resource to the DFARS
the DFARS
c. The DFARS PGI is not numbered similarly to
the DFARS
d. The DFARS PGI is only used by DCMA and
DCAA