Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

CON 366 Exam 1 with all Correct & 100% Verified Answers| Actual Complete Exam| Already Graded A+

Puntuación
-
Vendido
-
Páginas
6
Grado
A+
Subido en
09-11-2025
Escrito en
2025/2026

CON 366 Exam 1 with all Correct & 100% Verified Answers| Actual Complete Exam| Already Graded A+

Institución
Contracts
Grado
Contracts

Vista previa del contenido

CON 366 Exam 1 with all Correct & 100% Verified
Answers| Actual Complete Exam| Already Graded A+

3 significant developments after WWII ✔Correct Answer--high strength steels
-nylon cord tires
-high output engines

high-strength steels ✔Correct Answer-reduced overall weight of equipment trucks from 25000 lbs
to 16000 lbs

nylon cord tires ✔Correct Answer-in tire structures made larger tires with increased load capacity
and heat resistance a practical reality

high-output diesel engines ✔Correct Answer--compression ratios and engine speeds were raised
-art of turbocharging was perfected: 10-15% increase in flywheel HP

contractor's ability to win contracts and to perform them at a profit is determined with 2 vital assets
✔Correct Answer-people and equipment

equipment spread ✔Correct Answer-optimization in management critical in achieving a
competitive pricing position and in accumulating corporate operating capital require to finance the
expansion of project performance capability

there are no unique solutions to the problem of selecting a machine for a particular construction
project

each new site ✔Correct Answer-company proceeds to set up and produce a one-of-a-kind project

equipment intensive projects' financial risks ✔Correct Answer-contractor works under a unique set
of production conditions that directly affect equipment management

Labor-Davis-Bacon Act ✔Correct Answer-over 1/2 of dollars volume of working in equipment
intensive fields of construction is subjected to wage determination of DBA

Safety-OSHA- ✔Correct Answer-ROPS, Sounds & Emissions

Davis-Bacon Act ✔Correct Answer--1931 U.S. Federal Law
-Must pay locally prevailing wages and benefits on federally funded projects
-intended to encourage hiring a local skilled workers
-tends to promote union apprenticeship programs

rate of personal injury and death resulting from construction is ✔Correct Answer-18-20% death

the price ✔Correct Answer-contractors work within a unique market situation. job plans, specs
supplied by the client dictate the sales conditions and product but not the price

cause of variance in bids ✔Correct Answer-contractor's inability to estimate costs accurately -
largest portion of estimating variance

, equipment productivity ✔Correct Answer--productivity = output per labor hour/shift
-output measured in physical units
-historical changes in productivity
-important for cost control, competitive advantage
-productive vs. nonproductive time
-susceptible to many factors
-sources of data:
- RS means catalog
-construction company - proprietary data
-equipment manufacturer data

nonproductive time ✔Correct Answer--delays due to weather, traffic, etc.
-defects
-equipment, material, labor unavailability
-rework
-absenteeism of personnel
-holidays
-strikes

Factors affecting equipment selection and productivity ✔Correct Answer--function to be carried
out
-job type, size and complexity
-capacity of the machine
-method of operation
-limitations of equipment and method
-cost and financing
-possible modification to the design
-labor availability
-contracts
-weather, climate
-culture
-management

planning equipment utilization ✔Correct Answer--each piece of equipment is designed to perform
certain mechanical operations.

-task of planner/estimator: to match the right machine or combination of machines to the job at
hand

-after:
- studying plans and specs.
- visiting the project site
- performing a quantity take off, the planner must visualize how to best employ must pieces of
equipment to accomplish the work

production and costs ✔Correct Answer-amount of earth moved on concrete placed and costs
associated with that production

equipment economics ✔Correct Answer--how much does it cost to operate the machine on a
project?
-what is the optimum economic life & manner to secure a machine?

Escuela, estudio y materia

Institución
Contracts
Grado
Contracts

Información del documento

Subido en
9 de noviembre de 2025
Número de páginas
6
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$13.49
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Stuvia2026 Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
24
Miembro desde
1 año
Número de seguidores
1
Documentos
5652
Última venta
1 semana hace
\"Your trusted Hub for Academic Excellence\"

Stuvia 2024 is your trusted destination for top-tier study materials, including high-quality exams, assignments, and verified answer keys. Our content is crafted for excellence thorough, up-to-date, and tailored to help students succeed in their academic journey. Whether you\'re preparing for a final exam or need support with coursework, every document in our store is designed to provide clarity, accuracy, and confidence. At Stuvia 2024, academic success starts with the right resources.

Lee mas Leer menos
2.3

3 reseñas

5
0
4
0
3
2
2
0
1
1

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes