Con 367 Final Exam with all Correct & 100% Verified Answers |Actual Complete Exam| Already Graded A+

Institución
Project Managememt
Grado
Project Managememt









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Project Managememt
Grado
Project Managememt

Información del documento

Subido en
9 de noviembre de 2025
Número de páginas
7
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Con 367 Final Exam with all Correct & 100% Verified
Answers |Actual Complete Exam| Already Graded A+

Which one of the Following is not a Project Delivery System?
At-Risk CM
Design-Bid-Build
Professional CM (Agency CM)
Multiple Prime Contracting ✔Correct Answer-Professional CM (Agency CM)

In lump-sum contracts, the Owner assumes the risk of the cost
True or False ✔Correct Answer-False

Typically, The design reviewer has the ultimate responsibility and authority to make executive
decisions to matters affecting time and money in a construction project

True or False ✔Correct Answer-False

In The Design-Build Project delivery system, the Owner has separate contracts with the Designer and
the Contractor

True or False ✔Correct Answer-False

The Resident Project Representative should stop the work of the Contractor when the work is not
performed according to the drawings and specifications

True or False ✔Correct Answer-False

Which of the Following should not be performed by the Resident Project Representative?

1. Ensuring that all work activities of contractor are inspected daily
2. Providing instructions directly to subcontractors
3. Approving the work that meets the contract requirements
4. Following up the work that requires corrections ✔Correct Answer-2. Providing instructions
directly to subcontractors

Which of the following is not true for the construction diary?

1. Every working day should be reported even if no work is reported
2. It should be in ink if it is handwritten
3. There should be page numbers on every page
4. Entries should be made on a weekly basis ✔Correct Answer-4. Entries should be made on a
weekly basis

Ambiguous language in a contract is interpreted against the party who selected the language or
supplied the contract

True or False ✔Correct Answer-True

, According to Spearin Doctrine, when the contractor exactly follows the detail specifications and
drawings, she/he will not be responsible for unsatisfactory results in the end product

True or False ✔Correct Answer-True

Shop Drawings Can be used as change orders

True or False ✔Correct Answer-False

Which one of the following is not an element of the contract as we discussed in class?

1. Acceptance
2. Offer
3. Promise
4. Consideration ✔Correct Answer-3. Promise

Which of the following is not a condition where a contract will not be enforced by courts?

1.Duress
2. Unconscionability
3. Illegality
4. Seniority ✔Correct Answer-4. Seniority

Fill in the blank in the following statement: Some contracts must in writing under the ________ as
adopted by each state 1. Resource Conservation and Recovery Act
2. Statue of Frauds
3. Davis Bacon Act
4. Statue of Limitations ✔Correct Answer-2. Statue of Frauds

RFI is the document that is transmitted to the GC from the Designer to get clarifications with respect
to design drawings and specifications

True or False ✔Correct Answer-False

The Resident Project Representative should not supervise, direct, or control the contractors means
and methods of performing work

True or False ✔Correct Answer-True

In Fast-Track projects with multiple contractors, the services of a professional construction
management firm (Agency CM) are essential

True or False ✔Correct Answer-True

The design-build process may face some legal barriers when tried to be implemented in the public
sector

True or False ✔Correct Answer-True

On a multiple-prime project, the owner is responsible for coordinating the various trade contractors
with whom it has contracted
$18.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Studyclub Yale School Of Medicine
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
21
Miembro desde
1 año
Número de seguidores
0
Documentos
8359
Última venta
4 días hace
"The Club for Top Academic Performance."

Welcome to StudyClub—the ultimate destination for students who want to make studying not only effective but also enjoyable! Whether you’re preparing for an exam, looking to improve your grades, or mastering new subjects, StudyClub is your go-to space to find the tools and resources you need to succeed. At StudyClub, I believe in the power of community. That’s why I’ve created a collection of high-quality study materials designed to simplify complex concepts and help you achieve your academic goals. Whether you’re an individual looking to study independently or a student seeking the support of a virtual study group, you’ll find everything you need to succeed. Join the StudyClub today, where learning is made easier, more organized, and—most importantly—more collaborative. Let’s grow together, learn smarter, and unlock your academic potential. Thank you for being part of the StudyClub community. I can’t wait to see you succeed!

Lee mas Leer menos
3.0

5 reseñas

5
2
4
0
3
1
2
0
1
2

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes