100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

MCPPO Design and Construction Questions and Correct Answers

Puntuación
-
Vendido
-
Páginas
40
Grado
A+
Subido en
05-11-2025
Escrito en
2025/2026

MCPPO Design and Construction Questions and Correct Answers

Institución
MCPPO
Grado
MCPPO











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
MCPPO
Grado
MCPPO

Información del documento

Subido en
5 de noviembre de 2025
Número de páginas
40
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

1

MCPPO Design and Construction
Questions and Correct Answers
What are the three stages of the design and
construction process for public construction projects in
MA Answer: Planning, Design, and Construction


What does the design stage result in? Answer: A
complete set of plans and specifications describing the
project to be built.


What happens after a set of plans and specifications is
complete? Answer: Bids are solicited on the
completed design, and the selected contractor
completes the construction stage.


Who is always responsible and accountable for the
project? Answer: Public Owner (Awarding Authority)


Before contracting for design services in connection
with a public building contract estimated to cost $1.5
million or more, your jurisdiction is required to do
what? Answer: Contract with or assign an Owner's
Project Manager (OPM)


Pretest - Stuvia US

,2
Serves as your jurisdiction's agent during the planning,
design, and implementation of the construction work.
Answer: OPM


Independent of the project designer, general
contractor, or any subcontractor. Answer: OPM


I you elect to contract for the services of an OPM, what
are you required to do? Answer: Use a qualifications-
based selection process, which means that the OPM
must be competitively selected on the basis of
qualifications, without price competition.


Can you assign an employee to serve as OPM?
Answer: Yes, if the employee meets or exceeds the
requirements and has building construction and
supervision experience relating to projects of similar
size and scope of complexity.


What is a study? Answer: A pre-design document
that:




-Confirms and explains the owner's requirements
Pretest - Stuvia US

,3
-Identifies and evaluates alternative solutions


-Recommends and defines a solution


Purpose is to identify the owner's needs and determine
the most appropriate and cost effective solution to
meeting the needs. Answer: Study


True or False: A study may not result in a construction
project. Answer: True


More refined and detailed than the conceptual drawings
that were included in the study. Includes floor plans,
side views, and other illustrations. Answer: Schematic
drawings


At the end of this phase, the designer should prepare
and submit to the owner a revised construction cost
estimate. Answer: Schematic Design Phase


Consists of plans and specifications that are between
10 percent and 30 percent complete. Presented to the
owner as a deliverable. Answer: Schematic Design




Pretest - Stuvia US

, 4
Once the owner approves the schematic design
documents, the project may proceed to this phase....
Answer: Design Development


In this phase, the designer further refines the drawings
and written specifications by filling in construction
details and incorporating changes in response to the
owner's review of the schematic design as well as
changes required by a regulatory agency. Answer:
Design Development


In this phase, the design will be completed by filling in
the final details Answer: Construction Documents


The deliverable of this design phase will be the 100
percent complete design documents that will form the
legal basis of the construction contract. Answer:
Construction Documents


Must be written to provide for full competition for each
item of material to be furnished under the contract
Answer: Material Specifications




Pretest - Stuvia US
$14.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
UniTests Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
12
Miembro desde
1 año
Número de seguidores
0
Documentos
5181
Última venta
1 semana hace

3.0

1 reseñas

5
0
4
0
3
1
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes