Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 4 fuera de 31 páginas
Examen

EVM 101 FINAL EXAM STUDY GUIDE 2026 COMPLETE QUESTIONS WITH CORRECT DETAILED ANSWERS || 100% GUARANTEED PASS LATEST VERSION

Document preview thumbnail
Vista previa 4 fuera de 31 páginas

EVM 101 FINAL EXAM STUDY GUIDE 2026 COMPLETE QUESTIONS WITH CORRECT DETAILED ANSWERS || 100% GUARANTEED PASS LATEST VERSION 1. PV (Planned Value) - ANSWER Time-phased estimate value of planned work BCWS 2. BAC - ANSWER Budgeted at Complete total estimated value for all work planed through any given level authorized work 3. EV (Earned Value) - ANSWER time phased estimate value of completed work thorugh any given level and time period (BCWP) 4. AC (Actual Cost) - ANSWER Actual Cost of Work Performed (ACWP) 5. SV - ANSWER Seduled Variance EV-PV Positive (Ahead of Schedue) 6. CV - ANSWER Cost Variance EV-AC Poisitve (Under Budget) 7. EAC - ANSWER -Estimate at Completion -BAC/CPI -Independet cost estimated to complete all work planned through any given level -forecast cost 8. SPI - ANSWER Scheduled Performance Index EV/PV BCWP/BCWS 1 = Ahead of Schedule 9. CPI - ANSWER Cost Performance Index EV/AC BCWP/ACWP 1.00 = (Under Budget) 10. % Scheduled - ANSWER PV/BAC 11. % Completed - ANSWER EV/ BAC 12. % Spent - ANSWER AC/ BAC 13. TCPI - ANSWER To-Complete Performance Index (BAC-EVcum)/(BAC-ACcum) 1 = Must be more efficient 14. Performance Measurement Baseline (PMB) - ANSWER The performance measurement baseline (PMB) is the time-phased plan for accomplishing the contractual scope of work (SOW) against which contract performance is measured. The PMB is the resourced, budgeted cost for work scheduled (BCWS) for the contract. 15. Over Target Baseline (OTB) - ANSWER An over target baseline (OTB) is the condition created when the PMB is formally replanned to include additional performance management budget in excess of the contract's originally negotiated cost. An OTB increases the performance budget without modifying the work scope, or other constraints of the contract. 16. Over Target Schedule (OTS) - ANSWER An over target schedule (OTS) is the condition created when the contractor replans the schedule to one that exceeds the contract milestones and/or delivery date(s). The new schedule also becomes the basis for the performance budgets. An OTS is typically accompanied by increased cost, and thus an OTB. 17. Total Allocated Budget (TAB) - ANSWER The total allocated budget (TAB) reflects the budget for all authorized work scope. The TAB will always be equal to the Contract Budget Base (CBB) unless an OTB has been approved. Throughout a contract, the TAB may change in value due to negotiated contract modifications, or authorized unpriced work (AUW) 18. Contract Budget Base (CBB) - ANSWER The contract budget base is the sum of the negotiated contract cost and the estimated cost of any authorized unpriced work budgets: the CBB represents the current value of the project. The CBB also includes and budget set aside for management reserve. Contract overruns or underruns are determined by comparing the final cost of the contract with the CBB. 19. how many guidelines are there in the APM EVM - ANSWER thirty two guidelines divided between five sections 20. the five guideline sections are - ANSWER organisation, accounting considerations, analysis and management reports, revisions and data maintenance, planning scheduling and budgeting 21. the thirty two guidelines ensure - ANSWER the integrity of the projects baseline planning, performance measurement and cost collection processes

Vista previa del contenido

EVM 101 FINAL EXAM STUDY GUIDE
2026 COMPLETE QUESTIONS WITH
CORRECT DETAILED ANSWERS ||
100% GUARANTEED PASS
<LATEST VERSION>



1. PV (Planned Value) - ANSWER ✔ Time-phased estimate value of planned
work


BCWS


2. BAC - ANSWER ✔ Budgeted at Complete
total estimated value for all work planed through any given level
authorized work


3. EV (Earned Value) - ANSWER ✔ time phased estimate value of completed
work thorugh any given level and time period (BCWP)


4. AC (Actual Cost) - ANSWER ✔ Actual Cost of Work Performed (ACWP)


5. SV - ANSWER ✔ Seduled Variance
EV-PV

, Positive (Ahead of Schedue)


6. CV - ANSWER ✔ Cost Variance
EV-AC


Poisitve (Under Budget)


7. EAC - ANSWER ✔ -Estimate at Completion
-BAC/CPI
-Independet cost estimated to complete all work planned through any given
level
-forecast cost


8. SPI - ANSWER ✔ Scheduled Performance Index
EV/PV
BCWP/BCWS
>1 = Ahead of Schedule


9. CPI - ANSWER ✔ Cost Performance Index
EV/AC
BCWP/ACWP
>1.00 = (Under Budget)


10.% Scheduled - ANSWER ✔ PV/BAC

,11.% Completed - ANSWER ✔ EV/ BAC


12.% Spent - ANSWER ✔ AC/ BAC


13.TCPI - ANSWER ✔ To-Complete Performance Index
(BAC-EVcum)/(BAC-ACcum)


>1 = Must be more efficient


14.Performance Measurement Baseline (PMB) - ANSWER ✔ The performance
measurement baseline (PMB) is the time-phased plan for accomplishing the
contractual scope of work (SOW) against which contract performance is
measured. The PMB is the resourced, budgeted cost for work scheduled
(BCWS) for the contract.


15.Over Target Baseline (OTB) - ANSWER ✔ An over target baseline (OTB)
is the condition created when the PMB is formally replanned to include
additional performance management budget in excess of the contract's
originally negotiated cost. An OTB increases the performance budget
without modifying the work scope, or other constraints of the contract.


16.Over Target Schedule (OTS) - ANSWER ✔ An over target schedule (OTS)
is the condition created when the contractor replans the schedule to one that
exceeds the contract milestones and/or delivery date(s). The new schedule
also becomes the basis for the performance budgets. An OTS is typically
accompanied by increased cost, and thus an OTB.

, 17.Total Allocated Budget (TAB) - ANSWER ✔ The total allocated budget
(TAB) reflects the budget for all authorized work scope. The TAB will
always be equal to the Contract Budget Base (CBB) unless an OTB has been
approved. Throughout a contract, the TAB may change in value due to
negotiated contract modifications, or authorized unpriced work (AUW)


18.Contract Budget Base (CBB) - ANSWER ✔ The contract budget base is the
sum of the negotiated contract cost and the estimated cost of any authorized
unpriced work budgets: the CBB represents the current value of the project.
The CBB also includes and budget set aside for management reserve.
Contract overruns or underruns are determined by comparing the final cost
of the contract with the CBB.


19.how many guidelines are there in the APM EVM - ANSWER ✔ thirty two
guidelines divided between five sections


20.the five guideline sections are - ANSWER ✔ organisation, accounting
considerations, analysis and management reports, revisions and data
maintenance, planning scheduling and budgeting


21.the thirty two guidelines ensure - ANSWER ✔ the integrity of the projects
baseline planning, performance measurement and cost collection processes

Información del documento

Subido en
5 de noviembre de 2025
Número de páginas
31
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$13.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
ProfBenjamin
3.7
(148)
Vendido
728
Seguidores
17
Artículos
3941
Última venta
16 horas hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes