Ace your Massachusetts 1A Hoisting License Exam with this latest 2025–2026 Test Bank and Study Guide, featuring accurate questions and verified answers, all rated A for reliability and excellence. This comprehensive resource covers key areas, including crane operations, safety procedures, load management, and Massachusetts hoisting regulations. Each question mirrors real exam standards, providing clear explanations to enhance understanding and boost confidence. Perfect for candidates seeking a thorough, effective, and high-quality preparation for the Mass 1A Hoisting certification exam.

Mostrar más Leer menos
Institución
Hoisting
Grado
Hoisting











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Hoisting
Grado
Hoisting

Información del documento

Subido en
4 de noviembre de 2025
Número de páginas
38
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Mass 1A Hoisting Test Bank Guide
Study Guide Latest 2025-2026 Rated A
1% - ANSIf a crane is out of level by 1%, you can lose upto 50% capacity


125 pounds - ANSWeight of one cubic foot of soil


3300 pounds - ANSPounds weight of one cubic yard of soil


6.09 special requirements for Cranes: - ANSSpecial Requirements for
Cranes.
(a) Loading.
Material moving, handling or hoisting machinery shall be loaded in
accordance with the manufacturer's specifications. Manufacturers' load-
rating plates or
applicable load charts shall be kept in the cab of the crane in clear view of
the operator.
Rating plates or load charts for boom cranes shall clearly indicate the safe
load for maximum
and minimum positions of the boom and for at least two intermediate
positions. The
procedures applicable to the operation of the equipment, including
instructions,
recommended operating speeds, special hazard warnings, and operator's
manual, must be

,readily available in the cab at all times for use by the operator. Where rated
capacities are
available in the cab only in electronic form: In the event of a failure which
makes the rated
capacities inaccessible, the operator must immediately cease operations or
follow safe
shut-down procedures until the rated capacities (in electronic or other form)
are available
.
(b) Boom Stops. Devices to prevent the boom from falling over backward
shall be provided
on cranes. Cable boom stops by themselves shall not be considered as
adequate for this
purpose.


(c) Speed Controls and Stops. Hoisting machinery operating on rails, tracks
or trolleys shall
be equipped with speed controls and shall have positive stops or limiting
devices to prevent
overrunning safe limits.


(d) Equipment Modifications. Any modification made to hoisting machinery
shall maintain
at least the same factor of safety as the original designed equipment. A
record of the
differences between the unmodified machinery and the modified machinery
shall be

,maintained by the owner of the machinery and furnished to the Department
upon request.
All modifications shall be done with the manufacturer's written approval. If
the
manufacturer's writ


6.09 Special Requirements for Derricks - ANS(2) Special Requirements for
Derricks.
(a) Required Inspection. Guys, cable clamps and other rigging shall be
visually checked by
the operator at the beginning of each work day and before making any lifts
that are near the
capacity of the rig or as otherwise required by the manufacturer.


(b) Frequent checking by a duly licensed person of lead cables and mast
foot blocks shall
be performed to ensure that cables are not crossed or fouled. Lead line
blocks shall be
checked frequently to ensure that they are properly secured. Leads shall be
so arranged as
to minimize tripping hazards.


6.09 Special Requirements for Excavating Machines - ANS(5) Special
Requirements for Excavating Machines, Including Backhoes and Frontend
Loaders.

, (a) Dig Safe. Prior to any excavation, Dig Safe and other utilities not
covered by Dig Safe
must be notified. The operator must have a Dig Safe permit number, start
date, and time.


(b) Protection of Operator. Where the operator of an excavating machine
may be exposed
to the elements or overhead hazards, a suitable equipped cab for
protection against such
conditions shall be provided.


(c) Operation. Excavating machines shall be operated by a licensee,
temporary permit
holder, or an apprentice licensee under the direct supervision of a duly
licensed operator.
SAE hand signals shall be used with excavating machinery. No person
except the operating
crew or apprentice licensee operating under the direct supervision of a duly
licensed operator
shall be permitted on an excavating machine while it is in operation.


No person other than
the pitman and excavating crew shall be permitted to stand within the full
working radius of
an excavator or backhoe while the shovel or backhoe is in operation.


Excavating machinery
$14.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
wilfredmburuUS

Conoce al vendedor

Seller avatar
wilfredmburuUS Johns Hopkins University School Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
4
Miembro desde
1 año
Número de seguidores
0
Documentos
790
Última venta
3 días hace
Grade A+ Assignments, Exams, Quizzes, and Homework

EXCELLENT ASSIGNMENT AND EXERCISES HELP & TUTORING, ALL KINDS OF QUIZS & EXAMS WITH A GUARANTEED GRADE A. I am an expert on major courses especially; Human Resource Management, Criminal Justice, Criminology, Nursing, Sociology, Data Science, Environmental Science, Management Leadership and Forensics ensuring quality work delivery. I maintain scholarly standards in all my work, ensuring students get the best from me. I assure you a GOOD GRADE if you will use my work.

Lee mas Leer menos
0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes