S-12 CITYWIDE SPRINKLER SYSTEMS, S12
sprinkler test Questions and Answers 100% Pass
THE __________ IS RESPONSIBLE TO MAINTAIN SPRINKLER SYS.
AND TO DETERMINE QUALIFICATIONS. - ANSWER-OWNER
Question: RECORDS OF ALL INSPECTIONS AND MX SHALL BE
MAINTAINED ON PREMISES FOR A MIN. OF __________ YEARS. -
ANSWER-3
Question: THE BUILDING OWNER SHALL ASSIGN A(N) ____________
TO COMPLY WITH REQUIREMENTS. - ANSWER-IMPAIRMENT
COORDINATOR
Question: REGULAR MX AND MINOR REPAIRS NOT AFFECTING MORE
THAN ________ FLOOR(S) ARE CONSIDERED PLANNED REMOVAL
FROM SERVICE. - ANSWER-1
Question: SHUTDOWNS AFFECTING MORE THAN _________ FLOOR(S)
ARE CONSIDERED UNPLANNED OUT OF SERVICE CONDITIONS. -
ANSWER-1
,Question: NOTIFICATION TO FDNY IS NOT REQUIRED, PROVIDED
SYSTEM IS RETURNED TO SERVICE WITHIN ______ HOURS. -
ANSWER-8
Question: FOR UNPLANNED REMOVAL FROM SERVICE, THE COF
HOLDER SHALL IMMEDIATELY REPORT CONDITION TO THE
___________ AND THE FIRE DEPT. - ANSWER-OWNER OF THE
BUILDING
Question: IF A MINOR DEFECT IS OBSERVED, IT SHALL BE
CORRECTED WITHIN _________ DAYS OR IT WILL BE CONSIDERED
AN IMPAIRMENT. - ANSWER-30
Question: WHAT DOES "OOS" STAND FOR? - ANSWER-OUT OF
SERVICE
Question: OOS SYSTEMS SHALL BE IDENTIFIED BY PLACING ________
AT FIRE DEPT. CONNECTIONS, SYS. CONTROL VALVES, AND FIRE
COMMAND CENTER - ANSWER-TAGS
Question: A _______ SHALL BE REQUIRED TO POST TAGS AT MAIN
CONTROL VALVE AND ANY SECTIONAL VALVES. - ANSWER-MASTER
FIRE SUPPRESSION PIPING CONTRACTOR
,Question: __________ SHALL BE POSTED ON THE TAG INDICATING
BOTH STATIC AND FLOW PRESSURES BEFORE AND AFTER. -
ANSWER-DRAIN TEST RESULTS
Question: GREEN TAGS INDICATE THAT __________. - ANSWER-NO
IMPAIRMENT WAS FOUND
Question: GREEN TAGS WILL BE PLACED ON THE ____________. -
ANSWER-MAIN CONTROL VALVE
Question: SYSTEMS PARTIALLY OR FULLY OUT OF SERVICE SHALL
HAVE A ____________ TAG PLACED ON THE MAIN CONTROL VALVE.
- ANSWER-RED
Question: A _________ DISC OF 8-9 INCHES SHALL BE PLACED ON
CONNECTIONS TO INDICATE THE SYSTEM IS FULLY OUT OF
SERVICE. - ANSWER-WHITE
Question: A ________ DISC OF 8-9 INCHES SHALL BE PLACED ON
CONNECTIONS TO INDICATE THE SYSTEM IS PARTIALLY OUT OF
SERVICE. - ANSWER-BLUE
Question: THE IMPAIRMENT COORDINATOR WILL NOTIFY THE
___________ CARRIER, CENTRAL STATION AND OCCUPANTS. -
ANSWER-INSURANCE
, Question: PRIOR TO RETURNING A SYS. TO SERVICE, THE ___________
SHALL ENSURE THAT NECESSARY TESTS AND INSPECTIONS ARE
CONDUCTED. - ANSWER-IMPAIRMENT COORDINATOR
Question: GLYCERIN NOT GREATER THAN _________ PERCENT OR
GLYCOL NOT GREATHER THAN ________ PERCENT SHALL BE USED
TO PROTECT FROM FREEZING. - ANSWER-50, 40
Question: THE COF NUMBER AND SIGNATURE OF COF HOLDER
SHALL BE POSTED NEAR THE ____________. - ANSWER-MAIN
CONTROL VALVE
Question: __________ SHALL BE READILY AVAILABLE TO ANY
REPRESENTATIVE OF THE FIRE DEPT. THESE ARE TO BE
MAINTAINED ON SITE FOR 3 YEARS. - ANSWER-RECORDS
Question: FAILURE TO MAKE INSPECTIONS MAY RESULT IN
__________ OF THE COF AND COURT PROCEEDINGS. - ANSWER-
REVOCATION
Question: THE COF HOLDER MAY INSPECT, TEST, AND PERFORM
ROUTINE MX IF THEY HOLD THE FOLLOWING CERTS: - ANSWER-
REFRIGERATION OPERATING ENGINEER, HIGH PRESSURE
sprinkler test Questions and Answers 100% Pass
THE __________ IS RESPONSIBLE TO MAINTAIN SPRINKLER SYS.
AND TO DETERMINE QUALIFICATIONS. - ANSWER-OWNER
Question: RECORDS OF ALL INSPECTIONS AND MX SHALL BE
MAINTAINED ON PREMISES FOR A MIN. OF __________ YEARS. -
ANSWER-3
Question: THE BUILDING OWNER SHALL ASSIGN A(N) ____________
TO COMPLY WITH REQUIREMENTS. - ANSWER-IMPAIRMENT
COORDINATOR
Question: REGULAR MX AND MINOR REPAIRS NOT AFFECTING MORE
THAN ________ FLOOR(S) ARE CONSIDERED PLANNED REMOVAL
FROM SERVICE. - ANSWER-1
Question: SHUTDOWNS AFFECTING MORE THAN _________ FLOOR(S)
ARE CONSIDERED UNPLANNED OUT OF SERVICE CONDITIONS. -
ANSWER-1
,Question: NOTIFICATION TO FDNY IS NOT REQUIRED, PROVIDED
SYSTEM IS RETURNED TO SERVICE WITHIN ______ HOURS. -
ANSWER-8
Question: FOR UNPLANNED REMOVAL FROM SERVICE, THE COF
HOLDER SHALL IMMEDIATELY REPORT CONDITION TO THE
___________ AND THE FIRE DEPT. - ANSWER-OWNER OF THE
BUILDING
Question: IF A MINOR DEFECT IS OBSERVED, IT SHALL BE
CORRECTED WITHIN _________ DAYS OR IT WILL BE CONSIDERED
AN IMPAIRMENT. - ANSWER-30
Question: WHAT DOES "OOS" STAND FOR? - ANSWER-OUT OF
SERVICE
Question: OOS SYSTEMS SHALL BE IDENTIFIED BY PLACING ________
AT FIRE DEPT. CONNECTIONS, SYS. CONTROL VALVES, AND FIRE
COMMAND CENTER - ANSWER-TAGS
Question: A _______ SHALL BE REQUIRED TO POST TAGS AT MAIN
CONTROL VALVE AND ANY SECTIONAL VALVES. - ANSWER-MASTER
FIRE SUPPRESSION PIPING CONTRACTOR
,Question: __________ SHALL BE POSTED ON THE TAG INDICATING
BOTH STATIC AND FLOW PRESSURES BEFORE AND AFTER. -
ANSWER-DRAIN TEST RESULTS
Question: GREEN TAGS INDICATE THAT __________. - ANSWER-NO
IMPAIRMENT WAS FOUND
Question: GREEN TAGS WILL BE PLACED ON THE ____________. -
ANSWER-MAIN CONTROL VALVE
Question: SYSTEMS PARTIALLY OR FULLY OUT OF SERVICE SHALL
HAVE A ____________ TAG PLACED ON THE MAIN CONTROL VALVE.
- ANSWER-RED
Question: A _________ DISC OF 8-9 INCHES SHALL BE PLACED ON
CONNECTIONS TO INDICATE THE SYSTEM IS FULLY OUT OF
SERVICE. - ANSWER-WHITE
Question: A ________ DISC OF 8-9 INCHES SHALL BE PLACED ON
CONNECTIONS TO INDICATE THE SYSTEM IS PARTIALLY OUT OF
SERVICE. - ANSWER-BLUE
Question: THE IMPAIRMENT COORDINATOR WILL NOTIFY THE
___________ CARRIER, CENTRAL STATION AND OCCUPANTS. -
ANSWER-INSURANCE
, Question: PRIOR TO RETURNING A SYS. TO SERVICE, THE ___________
SHALL ENSURE THAT NECESSARY TESTS AND INSPECTIONS ARE
CONDUCTED. - ANSWER-IMPAIRMENT COORDINATOR
Question: GLYCERIN NOT GREATER THAN _________ PERCENT OR
GLYCOL NOT GREATHER THAN ________ PERCENT SHALL BE USED
TO PROTECT FROM FREEZING. - ANSWER-50, 40
Question: THE COF NUMBER AND SIGNATURE OF COF HOLDER
SHALL BE POSTED NEAR THE ____________. - ANSWER-MAIN
CONTROL VALVE
Question: __________ SHALL BE READILY AVAILABLE TO ANY
REPRESENTATIVE OF THE FIRE DEPT. THESE ARE TO BE
MAINTAINED ON SITE FOR 3 YEARS. - ANSWER-RECORDS
Question: FAILURE TO MAKE INSPECTIONS MAY RESULT IN
__________ OF THE COF AND COURT PROCEEDINGS. - ANSWER-
REVOCATION
Question: THE COF HOLDER MAY INSPECT, TEST, AND PERFORM
ROUTINE MX IF THEY HOLD THE FOLLOWING CERTS: - ANSWER-
REFRIGERATION OPERATING ENGINEER, HIGH PRESSURE