Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 4 fuera de 45 páginas
Examen

VA DEQ ESC Inspector Exam Newest Exam With Complete Questions And 100% Correct Answers

Document preview thumbnail
Vista previa 4 fuera de 45 páginas

VA DEQ ESC Inspector Exam Newest With Complete Questions And 100% Correct Answers

Vista previa del contenido

1|Page


VA DEQ ESC Inspector Exam
Newest 2025/2026 Exam With
Complete Questions And 100%
Correct Answers




Virginia Erosion and Sediment Control Law (ESCL)-correct-answer-requires that
State Water Control Board "shall develop a program and promulgate regulations
for the effective control of soil erosion, sediment deposition, and non agricultural
runoff that must be met in any control program to prevent the unreasonable
degradation of properties, stream channels, waters, and other natural resources




When compared to other land disturbing activities, why does construction
produce so much more sediment volume?-correct-answer-replanting isn't done
until the end of construction




Federal Water Pollution Control Act-correct-answer-1948



first major US law to address water pollution


Congress passed major amendments in 1972 - Clean Water Act (consolidated
control of water pollution policy under the administrator of the newly created US

,2|Page

EPA; established National Pollutant Discharge Elimination System [NPDES] Permit
Program, which in VA is administered by the VA Pollutant Discharge Elimination
system [VPDES], to control water pollution by regulating point sources that
discharge pollutants)




Stormwater Discharges from Land Disturbing Activities-correct-answer-permitted
under Construction General Permit (GP) through NPDES




Statewide Regulatory Erosion and Sediment Control Program-correct-answer-
began in 1960s (sedimentation problems were becoming increasingly evident in
areas undergoing fast-paced urban development - Northern VA and Tidewater
region)


1971 - Governor's Council on Environment (reported to State Attorney Andrew P.
Miller) created task force to study issue of sedimentation across state -> verified
statewide sedimentation problems and recommended a statewide program be
developed to address erosion and sedimentation


1973 - VESCL adopted by General Assembly as addendum to Soil and Water
Conservation District Law requiring the Commission to establish statewide criteria,
standards, and guidelines for the effective control of soil erosion, sediment
deposition, and nonagricultural runoff from regulated land-disturbing activities
that must be met in any VESCP to prevent unreasonable degradation of
properties, stream channels, waters, and other natural resources; required all
Counties and Cities in VA to adopt a local ESC program by July 1, 1974


1990 - General Assembly passed amendment requiring Soil and Water
Conservation Commission to promulgate regulations for the administration,
implementation and enforcement of the VESCL (effective May 1, 1990)

,3|Page


2012 - House Bill 1065 (integration bill) made some significant changes to the
VESCL and VA Stormwater Management Act; required to align the VESCL with the
SWMA and mandated that all counties, cities, and towns with regulated Municipal
Separate Storm Sewer Systems (MS4) programs adopt and administer local VA
Stormwater Management Program (VSMP) effectively creating statewide
stormwater
management program that operates at the local level, much like what has been
the case for the VESCP


2013 - amendments to VESCL to reflect Soil and Water Conservation Board and
Department of Conservation and Recreation to State Water Control Board and
Department of Environmental Qual




Who has to be certified under the Local Erosion and Sediment Control Programs?-
correct-answer-1. program administrators
2. inspectors

3. plan reviewers


VESCL requires personnel working in a VESCP to obtain and maintain a certificate
of competence in the area of erosion and sediment control (9VAC25-850)




Combined Administrator-correct-answer-anyone who is responsible for
performing the combined duties of program administrator, plan reviewer and
project inspector of a VESCP authority

, 4|Page


800 Hour Work Experience Form-correct-answer-individuals with at least 800
hours of on-the-job work experience as a stormwater management program
administrator, inspector, plan reviewer, or combined administrator may complete
the form on the DEQ website instead of completing the DEQ training courses


*still must pass the exam




Provisional Certification-correct-answer-from the day you complete your first
required training courses and obtain a passing score on certification exam


allows individuals to continue working for an authority while they seek full
certification


*individuals can only be provisionally certified ONCE per classification (this is a
difference between erosion and sediment control vs stormwater management)




Your certificate is good for how long?-correct-answer-3 years




Can you re-certify in the last 12 months without losing the time of your
certification?-correct-answer-Yes, time will be added to your certification


you need 18 contact hours in 3 years

Información del documento

Subido en
30 de octubre de 2025
Número de páginas
45
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$11.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
KelvinBrooks
4.3
(90)
Vendido
800
Seguidores
11
Artículos
5705
Última venta
18 horas hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes