ALC
What is the six step process to making a tentative plan? - Answer-1. Receive the Mission
2. Mission Analysis
3. COA Development
4. COA Analysis
5. COA Selection
6. Issue the order
This TLP is the process of developing a plan in a time-constrained environment.. - Answer-step 3 Make a
tentative plan
SSS - Answer-Simplified Survey System
ISLB points must not exceed this much between points... - Answer-140 mils
Which level of maintenance is closely associated with these obsolete levels of maintenance organization
and Direct - Answer-Field Maintenance
All forms related to maintenance... - Answer-DA PAM 750-8
This individual recommends ISLB - Answer-RSOP - OIC
What are the 2 methods of SSS.. - Answer-Porro Prism
2 Position Azimuth Method
, What are the components of the SSS... - Answer-CDU, TALIN, EBH Box
Local LSs need to be... - Answer-+-80 degrees
Alert Motor Equipment Dispatch.. - Answer-DA Form 5987-E-1
This Electronic form is used to annotate actions during services... - Answer-DA Form 5988-E
Phase 1 Launcher emplacements distances.. - Answer-1.3KM to 10KM
This form is utilized for manual faults... - Answer-DA Form 2404
Clearance angle for a local LS... - Answer-2 degrees
Local Launcher distances.. - Answer-120M to 1200M
The missile load for a remote launcher should be... - Answer-GEM or GEM+
PAC3
The LS "Bible" - Answer-TM 9-1440-600/1600-10
This TLP is accomplished by conducting rehearsals and inspections... - Answer-Step 8 surpervise
ISLB points must not exceed - Answer-200mils
What is the six step process to making a tentative plan? - Answer-1. Receive the Mission
2. Mission Analysis
3. COA Development
4. COA Analysis
5. COA Selection
6. Issue the order
This TLP is the process of developing a plan in a time-constrained environment.. - Answer-step 3 Make a
tentative plan
SSS - Answer-Simplified Survey System
ISLB points must not exceed this much between points... - Answer-140 mils
Which level of maintenance is closely associated with these obsolete levels of maintenance organization
and Direct - Answer-Field Maintenance
All forms related to maintenance... - Answer-DA PAM 750-8
This individual recommends ISLB - Answer-RSOP - OIC
What are the 2 methods of SSS.. - Answer-Porro Prism
2 Position Azimuth Method
, What are the components of the SSS... - Answer-CDU, TALIN, EBH Box
Local LSs need to be... - Answer-+-80 degrees
Alert Motor Equipment Dispatch.. - Answer-DA Form 5987-E-1
This Electronic form is used to annotate actions during services... - Answer-DA Form 5988-E
Phase 1 Launcher emplacements distances.. - Answer-1.3KM to 10KM
This form is utilized for manual faults... - Answer-DA Form 2404
Clearance angle for a local LS... - Answer-2 degrees
Local Launcher distances.. - Answer-120M to 1200M
The missile load for a remote launcher should be... - Answer-GEM or GEM+
PAC3
The LS "Bible" - Answer-TM 9-1440-600/1600-10
This TLP is accomplished by conducting rehearsals and inspections... - Answer-Step 8 surpervise
ISLB points must not exceed - Answer-200mils