Construction Drawing and Specifications
Study online at https://quizlet.com/_56378w
1. Plan Mechanical drawings for HVAC systems are typically shown in
which type of view?
2. supplement the as-built Standard takeoff sheets are used to ___.
drawings, decrease the po-
tential for error, and provide
a permanent record
3. Non-technical Which aspects of contractual arrangements are covered in the
Special and General Conditions portions of a specification?
4. total the quantities per cate- When doing a quantity takeoff, the last step is to___.
gory of material
5. types and sizes For each item listed on a schedule for mechanical equipment, the
schedule typically shows both ___.
6. One How many 2" sanitary system pipe clean-out fixture are used in
sanitary/vent system shown in the figure?
7. elevation drawings Drawings that show the exterior style of a building are called ___.
8. shop drawings, coordination A mechanical contractor's normal sequence in which drawings are
drawings, cut lists produced in house for a construction project is ___.
9. technical aspects section of The order in which the major divisions involved in a construction
the specifications project are to perform their work is indicated in the ___.
10. From equipment and acces- Where does a subcontractor usually obtain the submittal infor-
sory manufacturers mation and shop drawings that are used to make up a submittal
sheet?
11. notify your immediate su- As an apprentice, if you find a discrepancy between the plan
pervisor drawings and specifications for a job, you should ___.
1/2
Study online at https://quizlet.com/_56378w
1. Plan Mechanical drawings for HVAC systems are typically shown in
which type of view?
2. supplement the as-built Standard takeoff sheets are used to ___.
drawings, decrease the po-
tential for error, and provide
a permanent record
3. Non-technical Which aspects of contractual arrangements are covered in the
Special and General Conditions portions of a specification?
4. total the quantities per cate- When doing a quantity takeoff, the last step is to___.
gory of material
5. types and sizes For each item listed on a schedule for mechanical equipment, the
schedule typically shows both ___.
6. One How many 2" sanitary system pipe clean-out fixture are used in
sanitary/vent system shown in the figure?
7. elevation drawings Drawings that show the exterior style of a building are called ___.
8. shop drawings, coordination A mechanical contractor's normal sequence in which drawings are
drawings, cut lists produced in house for a construction project is ___.
9. technical aspects section of The order in which the major divisions involved in a construction
the specifications project are to perform their work is indicated in the ___.
10. From equipment and acces- Where does a subcontractor usually obtain the submittal infor-
sory manufacturers mation and shop drawings that are used to make up a submittal
sheet?
11. notify your immediate su- As an apprentice, if you find a discrepancy between the plan
pervisor drawings and specifications for a job, you should ___.