Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 4 fuera de 67 páginas
Examen

CDC Volume 1 - 5, 3E351 EOC all number questions and Answers 2026

Document preview thumbnail
Vista previa 4 fuera de 67 páginas

CDC Volume 1 - 5, 3E351 EOC all number questions and Answers 2026

Vista previa del contenido

CDC Volume 1 - 5, 3E351 EOC all
number questions and Answers 2026

What plan prepares us to react to unforeseen circumstances, such as an enemy

attack, with an emphasis on restoring operations, saving lives, reducing human

suffering, and minimizing further damage? - Correct answer-Contingency response

plan

What center is established as a command and control element to direct and monitor

pre-attack survival actions and post-attack recovery? - Correct answer-Emergency

operations center

Who directs all base operability, survivability, and recovery operations within the

emergency operations center? - Correct answer-Support group Commander

What center does the damage assessment and response team (DART) report

hazards to? - Correct answer-Unit control center

What must the damage assessment and response team determine before entering a

facility? - Correct answer-Structural soundness of the building


©COPYRIGHT 2025, ALL RIGHTS RESERVED 1

,Who controls the airfield damage assessment team? - Correct answer-Emergency

operations center

Who normally oversees the minimum operating strip selection process? - Correct

answer-The base civil engineer

What center has the authority to determine what rapid runway repairs are needed

and in what priority? - Correct answer-The emergency operations center

What type of shoring is particularly effective when damage has been sustained to

end or side walls yet roof members have been essentially untouched? - Correct

answer-Guys (Guying)

What type of shoring is usually made of structural steel and heavy timbers? -

Correct answer-Bracing

What type of shoring is used to stabilize the structural integrity of a facility

affected by vertical loads? - Correct answer-Jacks

What shoring method is particularly useful with reinforced concrete columns that

have not been seriously damaged, yet show signs of cracking or minor fracture? -

Correct answer-Splints




©COPYRIGHT 2025, ALL RIGHTS RESERVED 2

,What shoring method restores some structural integrity into a cracked concrete

slab? - Correct answer-Tension ties or snitching dogs

When performing expediant repairs to a roof, what should your first efforts be

towards? - Correct answer-Ensuring adequate shoring and bracing is in place

How are emergency repairs made to fire damage trusses? - Correct answer-By

scraping off the charred material and sistering or scabbing a piece next to it

After expedient patches have been made to a flat roof, what actions must you take?

- Correct answer-Ensure the roof still drains properly

What is the first action you should take to repair a large hole in a load-bearing

masonry wall? - Correct answer-Shore and brace the area around the hole

When assembling and installing the arch assemblies on the small shelter system

where are the red-coded arches placed? - Correct answer-On the bottom; same side

How are the purlins secured to the arches on an SSS? - Correct answer-Slip the

purlins through the purlins sleeves and place the pins from the top down

When installing the main cover of an SSS, you should work the cover over the end

until you have at least how much overlap? - Correct answer-4"-5" of overlap




©COPYRIGHT 2025, ALL RIGHTS RESERVED 3

, Approximately where and how are guy anchors installed for the SSS? - Correct

answer-36 inches away from the side with the top of the anchor away from the

shelter

What is the proper sequence for installing liners in the SSS? - Correct answer-1)

Mid liner

2) Side liner

3) End liner

What is the first step to disassembling the SSS? - Correct answer-Ensure that all

power is disconnected from the electrical system at the source

When assembling the MSS base frame, what are the four single-headed spikes used

for? - Correct answer-Anchoring the end base centers

How is the MSS floor installed when the cold weather kit is used? - Correct

answer-Install the insulated floor pads first; then install the floor with the black

side down

How many pullover ropes are used to install the top liner on the MSS? - Correct

answer-4




©COPYRIGHT 2025, ALL RIGHTS RESERVED 4

Información del documento

Subido en
27 de octubre de 2025
Número de páginas
67
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$13.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TutorJessica
3.3
(3)
Vendido
21
Seguidores
0
Artículos
5310
Última venta
2 meses hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes