Actions in low voltage alert? - CORRECT ANSWERS ✔✔Review
|\ |\ |\ |\ |\ |\ |\ |\ |\
transmission & generation outages |\ |\ |\
Request reactive reserve check |\ |\ |\
Heavy load voltage schedule warning purpose is to have
|\ |\ |\ |\ |\ |\ |\ |\ |\
members prepare far max support of voltages on the? - CORRECT
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔Bulk Power System
|\ |\ |\ |\
Manual load dump warning & reduction of Non-critical plant load
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
issued when? - CORRECT ANSWERS ✔✔Primary reserve is less
|\ |\ |\ |\ |\ |\ |\ |\ |\
the the largest generating unit.
|\ |\ |\ |\
Loss of transmission facility jeopardize reliability after all possible
|\ |\ |\ |\ |\ |\ |\ |\
measures have been taken to increase reserves
|\ |\ |\ |\ |\ |\ |\
Hot weather alert - CORRECT ANSWERS ✔✔COMED 90
|\ |\ |\ |\ |\ |\ |\
DOM & EKPC 95 |\ |\ |\
PJM issues high system voltage message - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\ |\ |\
✔✔Gen operators should operate the lower end of their voltage
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
bandwidth
Primary reserve warning - CORRECT ANSWERS ✔✔Ensure deffer
|\ |\ |\ |\ |\ |\ |\ |\
able Maintenance is halted
|\ |\ |\
,General actions PJM takes when conservating ops initiated? -
|\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔Purchase/load additional reserves
|\ |\ |\ |\ |\
begin studying double contingencies
|\ |\ |\
Lower IROL |\
Increase # of SOS calls |\ |\ |\ |\
Purpose of heavy voltage schedule action is to increase reactive
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
reserves - CORRECT ANSWERS ✔✔EHV system
|\ |\ |\ |\ |\
National terrorism advisory system 2 types of alerts? - CORRECT
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔Elevated threat |\ |\
Imminent threat |\
Non-critical plant load - CORRECT ANSWERS ✔✔lighting, office
|\ |\ |\ |\ |\ |\ |\ |\
area a/c
|\
Purpose of capacity emergency warning? - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\ |\
✔✔keep members informed of actual capacity shortages or
|\ |\ |\ |\ |\ |\ |\ |\
contingencies that may jeopardize reliability during RT ops
|\ |\ |\ |\ |\ |\ |\
keep all affected system personnel aware of the forecast and
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
actual status of the PJM RTO
|\ |\ |\ |\ |\
Heavy load voltage schedule action - CORRECT ANSWERS ✔✔Gen
|\ |\ |\ |\ |\ |\ |\ |\
operators- maintain MVAR reserve on units connected to EHV
|\ |\ |\ |\ |\ |\ |\ |\ |\
,During cold weather action - CORRECT ANSWERS ✔✔Assume an
|\ |\ |\ |\ |\ |\ |\ |\ |\
unavailability rate for scheduled generation |\ |\ |\ |\
During terrorism/sabotage emphasis on? - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\
✔✔Operations & communications |\ |\
For voltage support TOs can request? - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\ |\ |\
✔✔Generators stay online |\ |\
During Restoration what is removed from service until sufficient
|\ |\ |\ |\ |\ |\ |\ |\ |\
load restored to maintain voltage - CORRECT ANSWERS ✔✔Shunt
|\ |\ |\ |\ |\ |\ |\ |\
capacitors
|\
Freq change=(load change/connected capacity)X Gov droop in
|\ |\ |\ |\ |\ |\ |\
percentage - CORRECT ANSWERS ✔✔ |\ |\ |\ |\
LMP calculated day ahead market - CORRECT ANSWERS ✔✔Every
|\ |\ |\ |\ |\ |\ |\ |\
hour
|\ |\
RT every 5mins
|\ |\
Penalty factor - - CORRECT ANSWERS ✔✔incremental loss for a
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
bus used to include the effect of losses on the dispatch
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
All call types - CORRECT ANSWERS ✔✔Operational, Emergency
|\ |\ |\ |\ |\ |\ |\ |\
Messages, Informational |\
, Voltage reduction Alert- - CORRECT ANSWERS ✔✔Est. operating
|\ |\ |\ |\ |\ |\ |\ |\
reserve capacity is less than forecasted synchronized reserve
|\ |\ |\ |\ |\ |\ |\ |\
equipment
Generation owners - CORRECT ANSWERS ✔✔Must handle
|\ |\ |\ |\ |\ |\ |\
environmental Alerts |\
Emergency requires action to? - CORRECT ANSWERS ✔✔Maintain
|\ |\ |\ |\ |\ |\ |\ |\
freq prevent load loss, ensure safety and reliability
|\ |\ |\ |\ |\ |\ |\
Alerts - CORRECT ANSWERS ✔✔Advance of operating day
|\ |\ |\ |\ |\ |\ |\
Warning & actions - CORRECT ANSWERS ✔✔During that day
|\ |\ |\ |\ |\ |\ |\ |\
Emergency situation - CORRECT ANSWERS ✔✔Implement
|\ |\ |\ |\ |\ |\
procedures within 30min |\ |\
STE- Short term emergency rating - CORRECT ANSWERS ✔✔
|\ |\ |\ |\ |\ |\ |\ |\
Low voltage alerts - CORRECT ANSWERS ✔✔Analyze reactive
|\ |\ |\ |\ |\ |\ |\ |\
capabilities |\
Reactive reserve check |\ |\
Heavy load voltage schedule warning - CORRECT ANSWERS ✔✔4
|\ |\ |\ |\ |\ |\ |\ |\ |\
hrs prior
|\