100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

FULL TEST BANK For Systems Analysis and Design 8th Edition by Alan Dennis Latest Update Graded A+

Puntuación
-
Vendido
-
Páginas
355
Grado
A+
Subido en
20-10-2025
Escrito en
2025/2026

FULL TEST BANK For Systems Analysis and Design 8th Edition by Alan Dennis Latest Update Graded A+

Institución
Systems Analysis And Design
Grado
Systems Analysis and Design











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Libro relacionado

Escuela, estudio y materia

Institución
Systems Analysis and Design
Grado
Systems Analysis and Design

Información del documento

Subido en
20 de octubre de 2025
Número de páginas
355
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

1-1

,SolutionManualfor Dennis,Wixom,RothSystemsAnalysisandDesign,8th
m m m m m m m m m m




Edition
m




Chapter1:TheSystemsAnalystand m m m




InformationSystemsDevelopment
m m m




Answer to Your Turn 1-1: Being an Analyst
m m m m m m m




Student answers will vary, depending on their preferences regarding being a: 1)
m m m m m m m m m m m


systems analyst, 2) business analyst, 3) requirements analyst, 4) infrastructure
m m m m m m m m m m


analyst, or 5) change management analyst. Verify that the student has correctly
m m m m m m m m m m m m


associated the skills needed with the type of analyst for which they aspire and that
m m m m m m m m m m m m m m m


the student has created a plan to acquire those skills. The roles and the names used
m m m m m m m m m m m m m m m m


to describe them may vary from organization to organization.
m m m m m m m m m




Answer to Your Turn 1-2: Implementing a Satellite Data Network
m m m m m m m m m




While answers may vary, answers might include the following:
m m m m m m m m


1. A cost-benefit analysis, along with other financial processes (ROI, etc.) would
m m m m m m m m m m


certainly reveal that a just-in-time (JIT) inventory can reduce inventory costs
m m m m m m m m m m m


and increase revenue. A standard communication line, encrypted or not, would
m m m m m m m m m m m


not be able to handle the high bandwidth needed for data, voice and video
m m m m m m m m m m m m m m


transmissions.
m


2. A competitor would be able to narrow the gap by adopting the JIT type of
m m m m m m m m m m m m m m


inventory management. Voice and video are not necessary to keep the
m m m m m m m m m m m


inventory up to date on a timely basis, data transmissions alone would work
m m m m m m m m m m m m m


well. m




1-2

, Answer to Your Turn 1-3: Too Much Paper, Part 1
m m m m m m m m m




System Request
m m




Element Description
Sponsor Document Manager. m


Business Need m Increase efficiency in storing, updating, and retrieving
m m m m m m


minformation on employee injury claims. m m m m


Business Requirements m Automated system which allows for electronic m m m m m


msubmission of reports via a secure web site. m m m m m m m


Business Value m Reduce response time for employee inquiries, increase
m m m m m m


meffectiveness of storing, updating, and retrieving m m m m m


memployee injury claims. Reduce storage costs of paper
m m m m m m m


files.
Special Issues m Must have someone who understands how to create and
m m m m m m m m


mmaintain a secure web site. Must have resources to
m m m m m m m m


mmigrate paper files to data storage. Must work within
m m m m m m m m


HIPAA guidelines to ensure that medical documents
m m m m m m


mare treated according to regulations.
m m m m




Answer to Your Turn 1-4: Too Much Paper, Part 2
m m m m m m m m m




1. Issues arising from digital signatures and electronic documents typically focus
m m m m m m m m m


on establishing validity for signatures and originators. As these issues can be
m m m m m m m m m m m m


overcome using certificates and encryption, they don‘t necessarily affect the
m m m m m m m m m m


project feasibility. However, they do need to be addressed.
m m m m m m m m m


2. Answers will vary. The project champion, organizational management, and
m m m m m m m m


perhaps most importantly a subset of the stakeholders must believe in and
m m m m m m m m m m m m


show support for the project. One solution would be to plan and provide for
m m m m m m m m m m m m m m


sufficient training that demonstrates how their jobs might be easier to
m m m m m m m m m m m


accomplish with the automated system.
m m m m m




Answer to Concepts in Action 1-A: An Array of IT Failures
m m m m m m m m m m




Qantas provides for an ―ice-breaker‖ discussion topic for the first class. Perhaps
m m m m m m m m m m m


group the students and have them discuss this company and then provide for class
m m m m m m m m m m m m m m


discussion about the importance of IT project success.
m m m m m m m m




Answer to Concepts in Action 1-B: BPI on the Farm
m m m m m m m m m




Efficiency gains are mentioned in this Concept in Action. What are the drawbacks to
m m m m m m m m m m m m m


this scenario? Is it as easy as it seems? Issues such as Wi-Fi coverage on a farm,
m m m m m m m m m m m m m m m m m


perhaps even cellular coverage can come into play as can weather, dust, and other
m m m m m m m m m m m m m m


issues inherent with a farming enterprise.
m m m m m m




1-3

, Answer to Concepts in Action 1-C: Interview with Don Hallacy, President,
Technology Services, Sprint Corporation
This is an opportune time to identify the responsibilities of the differing roles that an
m m m m m m m m m m m m m m


analyst serves.
m m




Answer to Concepts in Action 1-D: Intangible Value at Carlson Hospitality
m m m m m m m m m m




Carlson Hospitality can use the information from the survey to determine whether
m m m m m m m m m m m


the one-point increase in market share revenue ($20 million per point) will offset
m m m m m m m m m m m m m


costs associated with increasing the level of services to high-quality customers
m m m m m m m m m m m


which would result in a 10% increase in customer satisfaction.
m m m m m m m m m m




Answer to Concepts in Action 1-E: Return on Investment
m m m m m m m m




1. One method for determining a return on investment is to complete a Cost-
m m m m m m m m m m m m


Benefit Analysis using the Present Value Method. Many of the costs for server
m m m m m m m m m m m m


virtualization are associated with the initial construction: physical manipulation
m m m m m m m m m


of the servers and software licensing. The ongoing costs of labor in updating
m m m m m m m m m m m m m


and accessing tables would be relatively small. Using this type of analysis
m m m m m m m m m m m m


would allow the project sponsors to show how the benefits of the virtualization
m m m m m m m m m m m m m


would be realized on a long term basis.
m m m m m m m m


2. Implementing a major change to a system should certainly include a systems
m m m m m m m m m m m


analyst. Systems analysts typically have a broad view of the system, and would
m m m m m m m m m m m m m


be able to ascertain how virtualizing the servers will affect the whole system.
m m m m m m m m m m m m m




Answers to End of Chapter Questions m m m m m




1. List and describe the six general skills all project team members should have.
m m m m m m m m m m m m




[1] Technical skills (knowledge of how to employ technology in development
m m m m m m m m m m


msystem solutions). [2] Business skills (knowledge of how to apply IT to business
m m m m m m m m m m m m


mproblems to achieve a valuable solution). [3] Analytical skills (ability to solve
m m m m m m m m m m m


mcomplex problems). m


[4] Interpersonal skills (oral and written communication skills with both technical
m m m m m m m m m m


mand non-technical audiences). [5] Management skills (ability to manage others and
m m m m m m m m m m


mcope with an uncertain environment). [6] Ethical skills (ability to deal with others
m m m m m m m m m m m m


mhonestly and ethically). m m




2. What are the major roles on a project team?
m m m m m m m m




1-4
$16.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
ExamsDocs Chamberlain College Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
16
Miembro desde
4 meses
Número de seguidores
0
Documentos
560
Última venta
1 día hace
EXAMSDOCS HIGH END EXAMS PALACE

On this page, you find all documents—test banks, solution manuals, ATIs, package deals, and flashcards—offered by seller ExamsDocs. Test Banks Available ✅ Solution Manuals Available ✅ ATI Exams ✅ iHuman Documents ✅ e.t.c

4.8

4 reseñas

5
3
4
1
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes