100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

ECON-B 252 EXAM 1 QUESTIONS & ANSWERS

Puntuación
-
Vendido
-
Páginas
7
Grado
A+
Subido en
19-10-2025
Escrito en
2025/2026

ECON-B 252 EXAM 1 QUESTIONS & ANSWERS

Institución
ECON 252
Grado
ECON 252









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
ECON 252
Grado
ECON 252

Información del documento

Subido en
19 de octubre de 2025
Número de páginas
7
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

CON 367 EXAM 1-2 QUESTIONS + ANSWERS

Professional CM (Agency CM) - Answer -Which one of the following is not a Project
Delivery System?

In lump-sum contracts, the Owner assumes the risk of cost. - Answer -False

Typically, the Design Reviewer has the ultimate responsibility and authority to make
executive decisions related to matters affecting time and money in a construction
project. - Answer -False

In the Design-Build project delivery system, the Owner has separate contracts with the
Designer and the Contractor. - Answer -False


Shop drawings can be used as change orders. - Answer -False

Which one of the following is not an element of the Contract as we discussed in class? -
Answer -(Promise)
Offer
Acceptance
Consideration

Which of the following is not a condition where a contract will not be enforced by courts?
- Answer -Seniority

Fill in the blank in the following statement: Some contracts must be in writing under the
____________ as adopted by each state. - Answer -Statute of Frauds

RFI (Request for Information) is the document that is transmitted to the General
Contractor from the Designer to get clarifications with respect to design drawings and
specifications. - Answer -False

The resident project representative should not supervise, direct, or control the
contractor's means and methods of performing work. - Answer -True

In fast-track projects with multiple contractors, the services of a professional
construction management firm (Agency CM) are essential. - Answer -True

A professional construction management firm (Agency CM) can participate in the
following phases of a project: - Answer -Conception, Program Planning, Design,
Construction, and Closeout

The design-build process may face some legal barriers when tried to be implemented in
the public sector. - Answer -True

, On a multiple-prime project, the owner is responsible for coordinating the various trade
contractors with whom it has contracted. - Answer -True

According to the brief article (in the supplemental reading for Week 3) about the use of
Web-based project management system used in Illinois Tollway, such system resulted
in reduced turnaround time on communications and improved access to project
paperwork. - Answer -True

The Resident Project Representative does not need to make any measurement for the
progress payments in the lump-sum projects. - Answer -False

Use of Building Information Modeling (BIM) in construction projects may result in a
reduction in Requests for Information (RFIs) and change orders. - Answer -True

The specifications should contain absolute dimensions and avoid tolerances in those
dimensions. - Answer -False

The Resident Project Representative should stop the work of the Contractor when the
work is not performed according to the drawings and specifications. - Answer -False

Which of the following should not be performed by the Resident Project Representative
for inspections? - Answer -Providing instructions directly to subcontractors

Which of the following is not true for the construction diary? - Answer -Entries should
be made on a weekly basis (i.e., at the end of each week)

Ambiguous language in a contract is interpreted against the party who selected the
language or supplied the contract. - Answer -True

According to Spearin Doctrine, when the contractor exactly follows the detail
specifications and drawings, she/he will not be responsible for unsatisfactory results in
the end product. - Answer –True

Fair subcontracting laws are in effect to protect subcontractors and the public against
bid shopping and bid peddling practices. - Answer -True

The Americans with Disabilities Act (ADA) of 1990 is enforced by: - Answer -Equal
Employment Opportunity Commission (EEOC)

Put in chronological order (from 1 to 5) the following 5 steps of the process of initiating a
construction project. - Answer -1. Advertise for bids
2. Open bids
3. Award contract
4. Sign the contract
5. Issue Notice to Proceed
$13.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GEEKA YALA UNIVERSITY
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2015
Miembro desde
3 año
Número de seguidores
1447
Documentos
48861
Última venta
1 día hace

3.8

345 reseñas

5
172
4
61
3
44
2
16
1
52

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes