ACM stands for - CORRECT ANSWERS ✔✔Asbestos Containing
|\ |\ |\ |\ |\ |\ |\ |\
Material
The operating agency for each public school building in which
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
fraible asbestos containing materials have been identified shall
|\ |\ |\ |\ |\ |\ |\ |\
monitor airborne asbestos levels in each sampling area. For at
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
least how many hours during a period of normal activity must
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
this monitoring be done? - CORRECT ANSWERS ✔✔it must be
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
done for 8 hours |\ |\ |\
What portion of insurance coverage for medical exams and
|\ |\ |\ |\ |\ |\ |\ |\ |\
monitoring as required by law must the contractor provide? - |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔all of the cost |\ |\ |\ |\ |\
Responsibility for ACM control in a building is primarily that of the |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
- CORRECT ANSWERS ✔✔owner
|\ |\ |\ |\
The category least suspected of releasing asbestos fibers into the
|\ |\ |\ |\ |\ |\ |\ |\ |\
air because of friability is - CORRECT ANSWERS ✔✔miscellaneous
|\ |\ |\ |\ |\ |\ |\ |\ |\
products
|\
The program manager can speed up the sampling process when
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
preparing for a building inspection for asbestos by revealing ACM
|\ |\ |\ |\ |\ |\ |\ |\ |\
in the - CORRECT ANSWERS ✔✔blueprints
|\ |\ |\ |\ |\ |\
, Before plastic barriers are set up, the work area should be -
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔wet cleaned |\ |\ |\
What percentage of Federal, commercial, and residential
|\ |\ |\ |\ |\ |\ |\
construction before 1970 contained asbestos in pipe or boiler |\ |\ |\ |\ |\ |\ |\ |\ |\
insulation? - CORRECT ANSWERS ✔✔20% |\ |\ |\ |\
The efficiency of the negative air pressure unit or cabinet is
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
determined by the - CORRECT ANSWERS ✔✔Magnehelic guage |\ |\ |\ |\ |\ |\ |\ |\
and the manometer
|\ |\
Disposal bags are primarily made of which type of plastic? -
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔A minimum of 6 mil |\ |\ |\ |\ |\ |\
A contractor must sign the contract and execute the bonds _____
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
days after being awarded the bid - CORRECT ANSWERS ✔✔5
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
days
What should be posted "in plain view" of workers at teh jobsite to
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
ensure safety? - CORRECT ANSWERS ✔✔Emergency telephone
|\ |\ |\ |\ |\ |\ |\ |\
numbers
For a negative air pressure unit or cabinet, what volt-power
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
supply is needed? - CORRECT ANSWERS ✔✔115 volt
|\ |\ |\ |\ |\ |\ |\