Project Management - ANS A discipline has come about to respond to client needs for the construction of more complex projects, to be built faster and more cost effectively. Associated Schools of Construction (ASC) - ANS 1965 nine universities met in Florida and formed this to promote construction management as a legitimate and unique area of study at universities. Steel - ANS In the 1800's this was introduced to allow for high- rise buildings. Objective of Project Management - ANS May be said to be the achievement of predetermined specifics within given targets of time, quality, cost and scope. But, the measured of success of the project is the maintenance of relationships and perceived satisfaction of all the stakeholders after significant trade offs being made during the life cycle to maintain scope, quality, time and budget. Heavy Civil - ANS 10% Roadways, Bridges, Tunnels, Dams, Airports, and Railways Mostly publicly funded. Horizontal Construction Industrial - ANS Steel mills, Processing plans, Manufacturing plants, Pipe lines, Electrical generating facilities, Oil refineries, Chemical processing plants. Mostly publicly funded. Least affected by economic fluctuations. Quality and time most important. Funding Sources - ANS 36% Public 64% Private Public Building: 10% Public Non-building: 12% Private Building: 71% Private Non-building: 7% Specialization - ANS Range of specialties helps insulate agains economic down turns. Framing, Mechanical, Demolition, Roofing, Electrical, Public works and Roads are major categories. Joint Venture/ Pooling Expertise - ANS As projects grow in size and complexity and contracts become schedule- oriented in order to mitigate costs, on- time completion becomes essential, firms pool expertise and financial resources for project bidding. Construction Management, Design- Build - ANS The technological sophistication of many projects and increased popularity of design-build contracts encourage the integration of construction managers, architects, engineers and construction companies. Repeat Business - ANS Bypassing bidding altogether and going with established relationships over low cost. Ethics - ANS American Institute of Contractors Code of Ethics. Bid Shopping. Being able to trust people we work with is a big part of putting our best effort into our work. Key success is creating a trusting environment in which people feel comfortable with each other. Iron Triangle - ANS These Construction Variables are Linked: Schedule, Cost, and Quality Change in one will affect the others: Projects done faster require more financial resources and quality may be compromised. High technical performance... increased time and money to complete. Architect - ANS Lead Designer. Creates Concept Drawings. Staff include Drafters/ CAD Operators, Specification Writers, Interior Designers, Landscape Architects. Anxious to provide a good design service and build a reputation for future work, perhaps creating a professional image in the final building. Respond to design requirements by first responding to and identifying the important elements of design (activities occurring in the building- feature requests) elements of design are key. Engineers - ANS Is the lead designer for infrastructure and industrial work. Building work, engineers brought in after concept is finalized but before details are developed. Types: Structural, Mechanical, Electrical, Civil, and Surveyors. Designs building systems, foundations, structural, mechanical, electrical and landscaping. 25%- 65% of construction costs go into engineering systems. Engineers approach is different as engineers break projects down into components and functional aspects are key. Prime Contractor - ANS Is anxious to maximize profit, especially if severe market competition have resulted in tight firm- price margins. (Firm- Price Margins are bids with low profit and overhead margins) Prime contractor is a general term to define the responsibility for all construction activities: Project manager Superintendents estimators Schedulers Purchasing agents Specialty contractors Building Trades - ANS Open shop/ Merit shop (ABC) and union shops. Open shops/ Merit shops are non- union operators. Open shops compete with unions on cost but not skilled labor. Open shops generally use skilled lead people to supervise semi- skilled labor. Unions heavily weighted toward skilled labor with apprenticeship programs. Material Suppliers - ANS Create installation standards though trade association which are often incorporated into codes. Equipment Suppliers - ANS Rent vs. Owning equipment Project Stakeholders - ANS Persons with a contractual or legal obligation to the project team and have the responsibility and authority to manage and commit resources according to schedule, cost, and technical performance objectives. Architect GC Subs Employees Suppliers Lenders Sureties Insurance Companies Project Delivery System - ANS Provides various combinations of project players and contract arrangements that define each players specific risks and responsibilities to achieve the owners project goals. Project Delivery Methods - ANS Traditional Design- Bid- Build Design- Build Construction Management (agent/ at risk) Contractual Arrangements Types - ANS Lump sum Cost- Plus a fee Unit costs Guarantee max CM at risk Design- Bid- Build - ANS Owner gets best price.

Vista previa del contenido

final exam cmgt Questions With
Complete Solutions




A
R
U
LA
C
O
D

, Builders Risk - ANS What is the name of the insurance that covers buildings while under
construction?

The Owner is allowed to do this when:
Defective work is not remedied
Failure of contractor to pay subs




A
Evidence that the work cannot be complete within the contract time - ANS What is withhold
payment?




R
The Owner may at anytime terminate the contract without cause. - ANS What is the
"termination for convenience" clause.

This specifications and contract drawings are two of these. - ANS What are the Contract



U
Documents?

The owner issues this to start the project. The time of performance for the contractor is
LA
measured from this. - ANS What is the NTP?

When an owner issues this to a contractor, the contractor proceeds with the work right away and
submits the price later. - ANS What is a CCD?

This type of delay could occur when a contractor encounters unusual or severe weather. - ANS
C

What is an excusable delay?

Arbitration and Mediation are forms of this. - ANS What is ADR?
O


The process of accelerating an activity or multiple activities to shorten the overall duration of the
project. - ANS What is crashing a project?
D



When you divide the earned manhours by the actual manhours, you get this - ANS What is
the SPI (Schedule Performance Index)?

The method used to measure work progress when the level of effort varies per phase? - ANS
Incremental Milestone

One of the basic standards that describes the performance requirements of the project's
components. - ANS What are the Specifications?

20% of the input accounts for 80% of the output. - ANS What is the Pareto Principle?

Información del documento

Subido en
17 de octubre de 2025
Número de páginas
7
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$15.39

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
DocLaura
4.2
(44)
Vendido
160
Seguidores
38
Artículos
6400
Última venta
1 mes hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes