WGU Project Management 7 exam with correct answers

Institución
WGU C-207
Grado
WGU C-207









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
WGU C-207
Grado
WGU C-207

Información del documento

Subido en
14 de octubre de 2025
Número de páginas
7
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

WGU Project Management 7 exam |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




with correct answers |||\\\ |||\\\




Your project has a potential for a future risk event. The sponsor has told you that the
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




organization cannot sustain the consequences of this risk. You recommend purchasing |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




insurance so that if the risk event occurs, the organization can recoup their expenditures for
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




the impacts of the risk. What risk strategy is this known as?
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




A: Accept
|||\\\




B: Mitigate
|||\\\




C: Avoid
|||\\\




D: Transfer - correct answer✔✔Transfer
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\




You are developing a bottom-up estimate for the first phase of your project. Which of the
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




following is the most important input to complete this task? |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




A: The scope statement
|||\\\ |||\\\ |||\\\




B: The WBS
|||\\\ |||\\\




C: Chart of accounts
|||\\\ |||\\\ |||\\\




D: Historic data from a similar project - correct answer✔✔The WBS
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




Your project task is complex and you decide to use a three-point estimating technique. Which
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




of the following options determine the three-point estimate? Choose three.
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




A: Rate estimate
|||\\\ |||\\\

, B: Resource estimate
|||\\\ |||\\\




C: Pessimistic estimate
|||\\\ |||\\\




D: Materials estimate
|||\\\ |||\\\




E: Work package level estimate
|||\\\ |||\\\ |||\\\ |||\\\




F: Quantity estimate
|||\\\ |||\\\




G: Most likely estimate
|||\\\ |||\\\ |||\\\




H: Optimistic estimate - correct answer✔✔Pessimistic estimate
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




Most likely estimate |||\\\ |||\\\




Optimistic estimate |||\\\




The total time it will take for one person to complete a task from beginning to end without
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




taking into account holidays, time off, or other project work is known as:
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




A: parametric estimate.
|||\\\ |||\\\




B: duration estimate.
|||\\\ |||\\\




C: work effort estimate.
|||\\\ |||\\\ |||\\\




D: bottom-up estimate. - correct answer✔✔Work effort estimate.
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




The risk register typically contains several pieces of information. Which of the following would
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




you expect to see on a risk register? Choose three.
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\ |||\\\




A: Resource costs to track risks
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\




B: Cost estimate for response plan
|||\\\ |||\\\ |||\\\ |||\\\ |||\\\




C: Risk score
|||\\\ |||\\\




D: Description of risk
|||\\\ |||\\\ |||\\\
$16.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
progrades
3.0
(1)

Conoce al vendedor

Seller avatar
progrades Walden University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
7
Miembro desde
5 meses
Número de seguidores
0
Documentos
3246
Última venta
2 días hace

3.0

1 reseñas

5
0
4
0
3
1
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes