100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

Test Bank For Electrical Wiring Commercial 18th Edition by Phil Simmons, Ray C. Mullin, Mark Ode Chapter 1-22

Puntuación
-
Vendido
-
Páginas
132
Grado
A+
Subido en
12-10-2025
Escrito en
2025/2026

Test Bank For Electrical Wiring Commercial 18th Edition by Phil Simmons, Ray C. Mullin, Mark Ode Chapter 1-22

Institución
Solution Manual
Grado
Solution Manual

Vista previa del contenido

A+ Page 1
xq

, Solutions Manual for Electrical Wiring Commercial 18t xq xq xq xq xq xq




h Edition by Phil Simmons A+
xq xq xq xq xq




Solution and Answer Guide xq xq xq



SIMMONS/ODE, ELECTRICAL WIRING COMMERCIAL, 18E © 2024, 9780357767115; C
X Q X Q X Q X Q X Q X Q XQ XQ



HAPTER 1:COMMERCIAL BUILDING PLANS AND SPECIFICATIONS
X Q X Q XQ XQ XQ




TABLE OF CONTENTS X Q X Q




Review .......................................................................................................................................................... 1



Note to instructor: It is recommended that students be required to respond, where app
xq xq xq xq xq xq xq xq xq xq xq xq xq


ropriate, with answers that are complete sentences.
x q x q x q x q x q xq




REVIEW

Refer to the National Electrical Code or the working drawings when necessary. Where appl
xq xq xq xq xq xq xq xq xq xq xq xq xq




icable, responses should be written in complete sentences.
xq xq xq xq xq xq xq




1. What section of a commercial building’s specification contains a list of contra
xq xq xq xq xq xq xq xq xq xq xq




ct documents?
xq




Answer: A list of the contract documents is contained in General Clauses and Conditions. A
xq xq xq xq xq xq xq xq xq xq xq xq xq xq xq




listing of the Commercial Building contract documents is presented in this chapter under the
xq xq xq xq xq xq xq xq xq xq xq xq xq xq




heading “Commercial Building Plans.” The instructor may wish to have the students check ov
xq xq xq xq xq xq xq xq xq xq xq xq xq




er this listing and compare it with the plans provided.
xq xq xq xq xq xq xq xq xq




2. The requirement for temporary light and power at the job site will be found in w
xq xq xq xq xq xq xq xq xq xq xq xq xq xq xq




hat portion of a commercial building’s specification?
xq xq xq xq xq xq




Answer: The Supplementary General Conditions specifies the job site requirements for tempo
xq xq xq xq xq xq xq xq xq xq xq




rary light and power. In some contracts, this electrical system becomes the responsibility of t
xq xq xq xq xq xq xq xq xq xq xq xq xq xq




he general contractor; in other contracts, it is the electrical contractor’s responsibility to instal
xq xq xq xq xq xq xq xq xq xq xq xq xq




l and maintain the temporary electrical system. The instructor may wish to refer the student to
xq xq xq xq xq xq xq xq xq xq xq xq xq xq xq xq




NEC Article 590 and discuss the requirements in detail.
xq xq xq xq xq xq xq xq




A+ Page 2 xq

,3. The electrician uses the Schedule of Working Drawings for what purpose?
xq xq xq xq xq xq xq xq xq xq




Answer: The electrician uses the Schedule of Working Drawings to determine whether all of t
xq xq xq xq xq xq xq xq xq xq xq xq xq xq




he drawings are at hand. The information on “the other sheets” may be very important, especia
xq xq xq xq xq xq xq xq xq xq xq xq xq xq xq




lly in coordinating with other contractors.
xq xq xq xq xq




4. Complete the following items by indicating the letter(s) designating the correct source(
xq xq xq xq xq xq xq xq xq xq xq




s) of information:
xq xq




No. Answer Item Information

4. Sections Ceiling height xq Sections, Sheet A6 xq xq




5. Electrical symb xq Electrical receptacle sty Electrical symbol schedule, Chapter
xq xq xq xq xq xq




ol schedule
xq le 2,Figure 2–6 xq




6. Electrical x Electrical outlet locatio xq xq Electrical layout drawings, Sheets El,
xq xq xq xq




layout d
q xq n E2, and E3
xq xq




rawings

7. Elevations Exterior wall finishes xq xq Elevations, Sheets A4 and A5 xq xq xq xq




8. Site plan xq Grading elevations xq Site plan, Sheet A4
xq xq xq




9. Electrical x Panelboard schedules xq Electrical layout drawings, Sheet E4
xq xq xq xq




layout d
q xq




rawings

10. Architectural fl xq Room width xq Architectural floor plan, Sheets Al,xq xq xq xq xq




oor plan xq A2,and A3 xq




11. Architectural fl xq Swing of door xq xq Architectural floor plan, Sheets Al,xq xq xq xq xq




oor plan xq A2,and A3 xq




12. Sections View of interior wall
xq xq xq Sections, Sheet A6 xq xq




A+ Page 3 xq

, Match the items on the left with those on the right by writing the letter desi
xq xq xq xq xq xq xq xq xq xq xq xq xq xq x q




gnation ofthe appropriate organization from the list on the right.
xq xq xq xq xq xq xq xq xq




13. NEC Electrical Code xq National Electrical Code (NEC xq xq xq


)
14. IAEI Electrical inspectors xq
International Association of xq xq




xq ElectricalInspectors (IAEI xq




)


15. NFPA Fire codesxq National Fire Protection Association
xq xq xq x




q (NFPA)

16. IESNA Lighting information xq Illuminating Engineering xq




xq Society ofNorth Americ
xq xq




a (IESNA)
xq




17. UL Listing service xq Underwriters Laboratories, Inc. (U xq xq xq




L)

18. NEMA Manufacturers’ standar xq National Electrical Manufacturers
xq xq




ds Association (NEMA) xq




19. PE Seal Professional Engineer (PE) xq xq




Match the items on the left with those on the right by writing the lette
xq xq xq xq xq xq xq xq xq xq xq xq xq xq




r designation ofthe proper level of NEC interpretation from the list on
xq xq xq xq xq xq xq xq xq xq xq xq




the right.
xq




20. with speci xq Allowed by the Code xq xq xq Shall be permitted, or Shall not
xq xq xq xq xq x




al permissi
xq q berequired, NEC xq




on

21. with May be donexq xq Shall be permitted, or Shall n
xq xq xq xq xq




A+ Page 4 xq

Libro relacionado

Escuela, estudio y materia

Institución
Solution Manual
Grado
Solution Manual

Información del documento

Subido en
12 de octubre de 2025
Número de páginas
132
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$16.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
APLUSLECTURER Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
103
Miembro desde
1 año
Número de seguidores
3
Documentos
509
Última venta
1 día hace
WELCOME TO A+ LECTURER STORE WHERE YOU ACQUIRE A+ graded study materials at best offer

Welcome to apluslecturer where you will get best testbanks, solutionmanuals and other study materials which will help you attain A+ in your studies ALL THE BEST.......

4.2

24 reseñas

5
16
4
1
3
4
2
1
1
2

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes